CN203669331U - Fixing unloading device of lifting scaffold - Google Patents

Fixing unloading device of lifting scaffold Download PDF

Info

Publication number
CN203669331U
CN203669331U CN201320880036.4U CN201320880036U CN203669331U CN 203669331 U CN203669331 U CN 203669331U CN 201320880036 U CN201320880036 U CN 201320880036U CN 203669331 U CN203669331 U CN 203669331U
Authority
CN
China
Prior art keywords
unloading
lifting scaffold
load base
base
fixing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320880036.4U
Other languages
Chinese (zh)
Inventor
丁宝庆
雷霆
李连营
马浩
周红军
李沛良
陈丽平
唐均儒
孙建宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou No1 Construction Engineering Co Ltd
Zhengzhou University
Original Assignee
Zhengzhou No1 Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou No1 Construction Engineering Co Ltd filed Critical Zhengzhou No1 Construction Engineering Co Ltd
Priority to CN201320880036.4U priority Critical patent/CN203669331U/en
Application granted granted Critical
Publication of CN203669331U publication Critical patent/CN203669331U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model belongs to the technical field of constructional engineering unloading, and particularly relates to a fixing unloading device of a lifting scaffold. The fixing unloading device of the lifting scaffold mainly resolves the technical problems that a traditional attaching type lifting scaffold adopts a steel wire rope for unloading in a soft pulling mode in construction, has many work procedures and is low in construction efficiency. The fixing unloading device of the lifting scaffold comprises a wall-attached support, wherein the wall-attached support is respectively connected with a concrete wall body and the lifting scaffold, two symmetrical connecting plates are arranged on the wall-attached support, an unloading base is arranged between the two connecting plates, a connecting nut is arranged at the upper portion of the unloading base, pin shaft connecting holes are formed in the corresponding positions of the lower portion of the unloading base and the connecting plates respectively, a lead screw is arranged on the unloading base, one end of the lead screw is connected with the unloading base through a connecting nut, the other end of the lead screw is connected with a U-shaped lap frame through threads, the U-shaped lap frame is in lap joint with the lifting scaffold, the original complex construction method of soft connection through the steel wire ripe is avoided, and construction efficiency is improved.

Description

The fixing relief arrangement of a kind of lifting false work
Technical field
The utility model belongs to construction work off-load technical field, specifically the fixing relief arrangement of a kind of lifting false work.
Background technology
In modern architecture work progress, attachment type raise scaffold construction is to whitewash the requisite construction technology of body of wall in the construction work later stage, the attachment type raise scaffold using now generally adopts wire rope to carry out soft drawn unloading, the weight of lifting false work is shared in concrete structure member, in work progress, also need structurally set aside pre-embedded, this set aside pre-embedded workload is very big, fixing in lifting process, remove wire rope operation loaded down with trivial details, operating efficiency while not only directly having influence on construction, and construction safety and construction speed are also had to great impact.
Summary of the invention
Goal of the invention of the present utility model:
Be mainly to adopt the off-load of wire rope soft drawn in order to solve traditional attachment type raise scaffold engineering, operation is various, the technical problem that efficiency of construction is low.
The technical solution of the utility model is:
Provide a kind of lifting false work to fix relief arrangement, comprise wall-attached supporting seat, wall-attached supporting seat is connected with lifting false work with concrete wall respectively, on wall-attached supporting seat, be provided with two symmetrical junction plates, between two junction plates, be provided with off-load base, the top of off-load base is provided with attaching nut, on off-load base bottom and junction plate, corresponding section, position is respectively arranged with bearing pin connecting hole, in bearing pin connecting hole, be placed with bearing pin, on off-load base, be provided with leading screw, leading screw one end is connected with off-load base by attaching nut, the other end is threaded connection with U-shaped built and is connected, U-shaped built is overlapped on lifting false work, off-load base is welded by two block plates of symmetry and the ribs being arranged between two block plates, the length of the steel plate of off-load base is 160~240mm, width is 60~100mm, thickness is 20mm, attaching nut on described off-load base and the thread size of leading screw are M30,
The diameter of bearing pin connecting hole is 35mm, and the diameter of bearing pin is 30mm.
The beneficial effects of the utility model are:
Improve greatly the efficiency of construction of attached electric lifting scaffold, improved the off-load ability of scaffold, improved production safety.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the structural representation of relief arrangement of the present utility model;
Fig. 3 is the structural representation of off-load base of the present utility model.
In figure, 1 is wall-attached supporting seat; 2 is junction plate; 3 is bearing pin; 4 is off-load base; 5 is leading screw; 6 is U-shaped pylon; 7 is steel plate; 8 is bearing pin connecting hole; 9 is ribs, and 10 is attaching nut.
The specific embodiment
Below in conjunction with accompanying drawing, specific embodiments of the present utility model is described in detail.
The utility model provides a kind of lifting false work to fix relief arrangement, comprise wall-attached supporting seat 1, wall-attached supporting seat 1 is connected with lifting false work with concrete wall respectively, on wall-attached supporting seat 1, be provided with two symmetrical junction plates 2, between two junction plates 2, be provided with off-load base 4, the top of off-load base 4 is provided with attaching nut 10, on off-load base 4 bottoms and junction plate, corresponding section, position is respectively arranged with bearing pin connecting hole 8, in bearing pin connecting hole 8, be placed with bearing pin 3, on off-load base 4, be provided with leading screw 5, leading screw 5 one end are connected with off-load base 4 by attaching nut 10, the other end is threaded connection with U-shaped built 6 and is connected, U-shaped built 6 is overlapped on lifting false work, off-load base 4 is welded by two block plates of symmetry and the ribs being arranged between two block plates, the length of the steel plate of off-load base 4 is 160~240mm, width is 60~100mm, thickness is 20mm, attaching nut 10 on off-load base and the thread size of leading screw 5 are M30, the diameter of bearing pin connecting hole 8 is 35mm, the diameter of bearing pin is 30mm, the utility model is simple and practical, in the construction of building attachment type raise scaffold, assembly and disassembly is extremely convenient, the complicated form of construction work of having avoided the wire rope in the past adopting to be flexible coupling, not only save cost to enterprise, and improve the efficiency of having constructed.

Claims (5)

1. the fixing relief arrangement of lifting false work, comprise wall-attached supporting seat, wall-attached supporting seat is connected with lifting false work with concrete wall respectively, it is characterized in that: on wall-attached supporting seat, be provided with two symmetrical junction plates, between two junction plates, be provided with off-load base, the top of off-load base is provided with attaching nut, on off-load base bottom and junction plate, corresponding section, position is respectively arranged with bearing pin connecting hole, in bearing pin connecting hole, be placed with bearing pin, on off-load base, be provided with leading screw, leading screw one end is connected with off-load base by attaching nut, the other end is threaded connection with U-shaped built and is connected, U-shaped built is overlapped on lifting false work.
2. the fixing relief arrangement of lifting false work according to claim 1, is characterized in that: described off-load base is welded by two block plates of symmetry and the ribs being arranged between two block plates.
3. the fixing relief arrangement of lifting false work according to claim 1 and 2, is characterized in that: the length of the steel plate of described off-load base is 160~240mm, and width is 60~100mm, and thickness is 20mm.
4. the fixing relief arrangement of lifting false work according to claim 1, is characterized in that: the attaching nut on described off-load base and the thread size of leading screw are M30.
5. the fixing relief arrangement of lifting false work according to claim 1, is characterized in that: the diameter of bearing pin connecting hole is 35mm, and the diameter of bearing pin is 30mm.
CN201320880036.4U 2013-12-30 2013-12-30 Fixing unloading device of lifting scaffold Expired - Fee Related CN203669331U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320880036.4U CN203669331U (en) 2013-12-30 2013-12-30 Fixing unloading device of lifting scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320880036.4U CN203669331U (en) 2013-12-30 2013-12-30 Fixing unloading device of lifting scaffold

Publications (1)

Publication Number Publication Date
CN203669331U true CN203669331U (en) 2014-06-25

Family

ID=50965646

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320880036.4U Expired - Fee Related CN203669331U (en) 2013-12-30 2013-12-30 Fixing unloading device of lifting scaffold

Country Status (1)

Country Link
CN (1) CN203669331U (en)

Similar Documents

Publication Publication Date Title
CN202577934U (en) Screw thread wall-connection member of scaffold and building
CN205840291U (en) High Large Cantilever structural support system
CN201260050Y (en) 220KV bracket for replacing bus bar column insulator
CN203669331U (en) Fixing unloading device of lifting scaffold
CN201568646U (en) Trapezoid type cable bridge rack
CN204164607U (en) A kind of para-seismic support of building interior electromechanical equipment
CN203545458U (en) Concrete pipe piece lifting appliance
CN206753020U (en) A kind of building buckle
CN205039496U (en) Whole prefabricated cable support
CN102619377A (en) Improved auxiliary holding pole fixing base
CN202181614U (en) Steel pipe fixing device for joist steel
CN202226567U (en) Lifter
CN202509842U (en) Improved auxiliary derrick fixing base
CN203475810U (en) Overhanging scaffold bearing structure
CN205709591U (en) The novel flexible attachment device of derrick crane
CN203625782U (en) Traction supporting plate for steel strand stay cable construction
CN202107441U (en) Lifting rod piece for large concrete column
CN202000494U (en) Spliced enhancing structure for steel structure
CN202596180U (en) Installation structure for steel frame in steel structural frame
CN209703979U (en) A kind of construction coherent-wall scaffolding cantilever arrangement
CN203157993U (en) Symmetrical parallel return sheave device for construction cableway
CN201932819U (en) Main beam of gantry crane
CN202266011U (en) Shear wall support
CN204645077U (en) The changeover portion of jacket-type marine wind electric field foundation structure
CN202324607U (en) Novel roof mold support

Legal Events

Date Code Title Description
GR01 Patent grant
C14 Grant of patent or utility model
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140625

Termination date: 20181230

CF01 Termination of patent right due to non-payment of annual fee