CN202903929U CN 201220621952 CN201220621952U CN202903929U CN 202903929 U CN202903929 U CN 202903929U CN 201220621952 CN201220621952 CN 201220621952 CN 201220621952 U CN201220621952 U CN 201220621952U CN 202903929 U CN202903929 U CN 202903929U
Authority
CN
China
Prior art keywords
electric energy
seabed
shore
links
switch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220621952
Other languages
Chinese (zh)
Inventor
张锋
陈燕虎
金波
李德骏
杨灿军
张璐
马晔军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongtian Technology Marine Systems Co ltd
Original Assignee
Zhejiang University ZJU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University ZJU filed Critical Zhejiang University ZJU
Priority to CN 201220621952 priority Critical patent/CN202903929U/en
Application granted granted Critical
Publication of CN202903929U publication Critical patent/CN202903929U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model discloses a multinode connected shore-based simulation test system of a seabed observatory network. The system comprises a power supply, a junction box system, n switches, n shore-based electric energy test system corresponding to the n switches in a one-to-one correspondence manner, and n seabed detecting instruments, wherein n is equal to 1 to 8. The shore-based electric energy test system comprises an isolation sampling module, a digital-to-analog conversion chip, a data processing chip and a mainframe monitor system connected in sequence. An electric energy output end of the power supply is connected with an input end of the junction box system. N output ends of the junction box system are connected with input ends of the n switches. The output end of each switch is divided into two paths, wherein a path is connected with a seabed detecting instrument, and the other path is connected with the shore-based electric energy test system. The system is suitable to be used for shore-based electric energy tests before placing each device of the seabed observatory network under water. The system improves reliability and stability of supply of electric energy, and eliminates unstabilizing factors which may induce system breakdown.

Description

The bank basic mode that a kind of seabed observation network multinode is plugged into is intended test macro
Technical field
The utility model relates to the bank basic mode that the seabed observation network multinode plugs into and intends test macro, is particularly useful for carrying out the electric imitating test of bank base laying seabed observation network under water before each instrument and equipment.
Background technology
The plug into the most basic function of box of seabed is conversion and distribution to electric energy, and what need to realize is to provide correct reliably electric energy to supply with to all kinds of instruments of scientific exploration under water.Electric energy need to be changed and distribute, and this is one of vital task of submarine observation system.Commercial power is through after the transformation, can not be directly used in various scopes after delivering to the seabed by key optical cable or cable, and middle must must have a conversion equipment.Plug into device for converting electric energy in the box, the electric energy with key optical cable or cable transmit by step-down, converts the applicable electric energy form of detection instrument to, and this task is born by the seabed box of plugging into.
In the environments such as subsea of complexity, require seabed observation network can correctly finish the supply of electric energy, the fault that occurs for whole system simultaneously also will have certain pre-diagnosis and processing power, and these all need highly reliably to realize based on the box device of plugging into of joint technology under water.The real-time energy state parameter that places the abyssopelagic box system that plugs into, habitata instrument to be in operation in the real work all plays vital effect to collection, processing and the transmission of data.Thereby plug into box system and habitata instrument running status are tested and carried out fault diagnosis is very necessary and difficult.
To sum up, deep sea equipment is tested before entry work, each technical indicator, the parameter of its electric energy part of measurement and monitoring, and understand its stability and reliability, thereby the weak link that may exist in the simultaneously understanding system is improved, and is a kind of necessity and wise way.
Summary of the invention
The purpose of this utility model is to propose the bank basic mode plan test macro that a kind of seabed observation network multinode is plugged into, and carries out power test in the simulated environment on the coast seabed observation network is entered wetting system.
The bank basic mode that seabed observation network multinode of the present utility model is plugged into is intended test macro, comprise power supply, the box system plugs into, n switch, respectively with n switch one to one n bank base power test system and n habitata instrument, n=1~8, said bank base power test system comprises the isolation sampling module, the D/A switch chip, data processing chip and Monitor Computer Control System, the electric energy output end of power supply links to each other with the input end of the box system that plugs into, n output terminal of the box system that plugs into links to each other with the input end of n switch respectively, the output terminal of each switch is divided into two-way, the one road connects the habitata instrument, and another road links to each other with the input end of isolation sampling module, and the output terminal of isolation sampling module links to each other with the input end of analog-digital chip, the output terminal of analog-digital chip links to each other with the input end of data processing chip, and the output terminal of data processing chip links to each other with Monitor Computer Control System by the RS232 serial communication interface.
During simulation test, power supply is converted to negative high voltage direct current (take-10kV as example) with civil power, by transmission cable with delivery of electrical energy in the box system that plugs into, the box system that plugs into is converted into mesolow direct current (take 375V or 48V as example) with high voltage direct current, for n the habitata instrument in seabed provides work energy, n switch controlled respectively the electric energy supply of corresponding habitata instrument, when switch closure, by isolating sampling module to sampling from the voltage signal of the box system that plugs into and isolating, the analog quantity of isolation sampling module output is converted to digital quantity through analog-digital chip and inputs to data processing chip and carry out data and process, then be transported to Monitor Computer Control System by the RS232 serial line interface, in Monitor Computer Control System, carry out data processing and demonstration and storage, compare with setting threshold according to the data of gathering, whether break down with plug into box system or habitata instrument of judgement.
The bank basic mode that seabed observation network multinode of the present utility model is plugged into is intended test macro can be to the instrument and equipment of seabed observation network submarine platform, comprise the box system that plugs into, the habitata instrument carries out the power test before the entry in simulated environment, comprise the surge current test, the earth fault test, the steady-state characteristic test, the automatic test of the multiparameters such as short-circuit test, to get rid of potential safety hazard, determine optimum running status, guarantee the stable of each instrument and equipment of sea bed observation platform, when long, effectively operation, the negative effect that the power failure of lowering apparatus equipment is brought whole observation grid, improve to greatest extent the result of use of seabed observation network submarine platform, greatly reduce electric energy network failure probability, for the safe operation of seabed observation network provides strong assurance.
Description of drawings
Fig. 1 is that the bank basic mode that the seabed observation network multinode is plugged into is intended test macro principle of compositionality figure.
Embodiment
Further specify the utility model below in conjunction with accompanying drawing.
Reference is such as Fig. 1, the bank basic mode that the seabed observation network multinode is plugged into is intended test macro and is comprised power supply 1, box system 2 plugs into, n switch 3, respectively with n switch 3 one to one n bank base power test system and n habitata instrument 8, n=1~8, said bank base power test system comprises isolation sampling module 4, D/A switch chip 5, data processing chip 6 and Monitor Computer Control System 7, the electric energy output end of power supply 1 links to each other with the input end of the box system 2 that plugs into, n output terminal of the box system 2 that plugs into links to each other with the input end of n switch 3 respectively, the output terminal of each switch 3 is divided into two-way, the one road connects habitata instrument 8, another road links to each other with the input end of isolation sampling module 4, the output terminal of isolation sampling module 4 links to each other with the input end of analog-digital chip 5, the output terminal of analog-digital chip 5 links to each other with the input end of data processing chip 6, and the output terminal of data processing chip 6 is connected to the Monitor Computer Control System 7 that uses the VC programming language to write by the RS232 serial communication interface.
Above-mentioned isolation sampling module 4 can adopt the typical circuit based on light-coupled isolation chip HCNR201, and analog-digital chip 5 can adopt 50msps16 position A/D chip, and data processing chip 6 is adoptable to be Arm9/AT91 series of processes chip.

Claims (1)

1. the seabed observation network multinode bank basic mode of plugging into is intended test macro, it is characterized in that comprising power supply (1), the box system that plugs into (2), n switch (3), respectively with n switch (3) one to one n bank base power test system and n habitata instrument (8), n=1~8, said bank base power test system comprises isolation sampling module (4), D/A switch chip (5), data processing chip (6) and Monitor Computer Control System (7), the electric energy output end of power supply (1) links to each other with the input end of the box system (2) that plugs into, n output terminal of the box system that plugs into (2) links to each other with the input end of n switch (3) respectively, the output terminal of each switch (3) is divided into two-way, the one road connects habitata instrument (8), another road links to each other with the input end of isolation sampling module (4), the output terminal of isolation sampling module (4) links to each other with the input end of analog-digital chip (5), the output terminal of analog-digital chip (5) links to each other with the input end of data processing chip (6), and the output terminal of data processing chip (6) links to each other with Monitor Computer Control System (7) by the RS232 serial communication interface.
CN 201220621952 2012-11-22 2012-11-22 Multinode connected shore-based simulation test system of seabed observatory network Expired - Lifetime CN202903929U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220621952 CN202903929U (en) 2012-11-22 2012-11-22 Multinode connected shore-based simulation test system of seabed observatory network

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220621952 CN202903929U (en) 2012-11-22 2012-11-22 Multinode connected shore-based simulation test system of seabed observatory network

Publications (1)

Publication Number Publication Date
CN202903929U true CN202903929U (en) 2013-04-24

Family

ID=48124585

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220621952 Expired - Lifetime CN202903929U (en) 2012-11-22 2012-11-22 Multinode connected shore-based simulation test system of seabed observatory network

Country Status (1)

Country Link
CN (1) CN202903929U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102944796A (en) * 2012-11-22 2013-02-27 浙江大学 Multi-node connection shore-based simulation test system for seafloor observatory network
CN108512717A (en) * 2018-02-09 2018-09-07 中国科学院声学研究所 A kind of submarine observation network master base station underwater in-situ test system and method
CN110166075A (en) * 2019-06-25 2019-08-23 中国科学院新疆理化技术研究所 A method of the RS232 communications under nuclear radiation environment

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102944796A (en) * 2012-11-22 2013-02-27 浙江大学 Multi-node connection shore-based simulation test system for seafloor observatory network
CN108512717A (en) * 2018-02-09 2018-09-07 中国科学院声学研究所 A kind of submarine observation network master base station underwater in-situ test system and method
CN108512717B (en) * 2018-02-09 2019-03-26 中国科学院声学研究所 A kind of submarine observation network master base station underwater in-situ test macro and method
CN110166075A (en) * 2019-06-25 2019-08-23 中国科学院新疆理化技术研究所 A method of the RS232 communications under nuclear radiation environment

Similar Documents

Publication Publication Date Title
CN102510131B (en) Method and device for testing overall performance of intelligent transformer substation
CN102944796A (en) Multi-node connection shore-based simulation test system for seafloor observatory network
CN104297631B (en) Failure diagnosis apparatus and diagnosis and repair method thereof for ring main unit distribution terminal
CN103076520A (en) Dynamic analogue simulation detection platform and analogue simulation method for secondary system of intelligent substation
CN103471617B (en) Space camera multifunctional comprehensive Star Service emulation ground check system
CN109582004B (en) Intelligent detection platform
CN203117313U (en) Dynamic simulation and emulation detecting platform for intelligent substation secondary system
CN101915882A (en) System for carrying out closed loop test by utilizing transmission system converter transformer protector and corresponding method
CN103617754A (en) Fault simulation and test simulation system for power cables
CN104090216A (en) Device and method for detecting wiring harness high-voltage insulation
CN104199311A (en) Simulation test system of multi-terminal flexible direct current transmission control protection system
CN202903929U (en) Multinode connected shore-based simulation test system of seabed observatory network
CN103063946B (en) Shore base simulation platform system based on seafloor observatory network
CN103499750A (en) Portable multifunctional shore power system tester
CN203324403U (en) Power distribution network feed line protection digital dynamic test system comprising distributed power sources
CN201773160U (en) System adopting power transmission system converter transformer protecting device for closed loop test
CN105204485A (en) Digital electric power stability control system tester
CN206583994U (en) A kind of intelligent distribution network terminal installation testing stand
CN103531059A (en) Teaching tool for testing faults of power cable
CN202956460U (en) Shore-based simulation platform system based on seabed observation network
CN208335507U (en) A kind of relay protection teaching experiment simulation platform
CN105866677A (en) Checking operation device of 10-kV switchgear
CN202797953U (en) Power management unit (PMU) with lightning stroke number detection function
Man et al. Research on simulation ideas of relay protection device on load test based on virtual reality technology
CN102508052A (en) Test method for field band channel operation of automatic bus transfer system of area network

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20170113

Address after: Rudong County, Jiangsu province 226407 Nantong Yangkou Port Economic Development Zone of Yangkou Port Business Mansion

Patentee after: ZHONGTIAN TECHNOLOGY MARINE SYSTEMS Co.,Ltd.

Address before: 310027 Hangzhou, Zhejiang Province, Xihu District, Zhejiang Road, No. 38, No.

Patentee before: ZHEJIANG University

C56 Change in the name or address of the patentee
CP02 Change in the address of a patent holder

Address after: 226407 Nantong, Rudong Foreign Economic Development Zone, Hong Kong, Hong Kong, Hong Kong Commercial Building

Patentee after: ZHONGTIAN TECHNOLOGY MARINE SYSTEMS Co.,Ltd.

Address before: Rudong County, Jiangsu province 226407 Nantong Yangkou Port Economic Development Zone of Yangkou Port Business Mansion

Patentee before: ZHONGTIAN TECHNOLOGY MARINE SYSTEMS Co.,Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20130424