CN202888970U - Transformer substation secondary equipment data and state on-line collecting device - Google Patents
Transformer substation secondary equipment data and state on-line collecting device Download PDFInfo
- Publication number
- CN202888970U CN202888970U CN 201220610374 CN201220610374U CN202888970U CN 202888970 U CN202888970 U CN 202888970U CN 201220610374 CN201220610374 CN 201220610374 CN 201220610374 U CN201220610374 U CN 201220610374U CN 202888970 U CN202888970 U CN 202888970U
- Authority
- CN
- China
- Prior art keywords
- secondary equipment
- collector
- equipment
- acquisition device
- online
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Testing And Monitoring For Control Systems (AREA)
Abstract
本实用新型公开了一种变电站二次设备数据、状态在线采集装置,包括上位机、二次设备在线采集装置、温度装置、湿度装置、视频装置、二次设备模拟量采集器、二次设备状态量采集器、二次设备定值采集器等,所述上位机通过光纤网络与二次设备在线采集装置连接,所述二次设备在线采集装置通过485接口与温度装置、湿度装置、视频装置、二次设备模拟量采集器、二次设备状态量采集器、二次设备定值采集器、二次设备动作采集器、二次设备告警采集器连接,所述上位机采用标准接口,能实现上位机的各种应用的信息共享。本实用新型可以减少设备停运时间,提高设备可靠性和可用系数,降低设备检修费用,改善设备运行性能。
The utility model discloses an online acquisition device for secondary equipment data and status of a substation, comprising a host computer, an online acquisition device for secondary equipment, a temperature device, a humidity device, a video device, an analog quantity collector for secondary equipment, and a secondary equipment status quantity collector, secondary equipment fixed value collector, etc., the host computer is connected to the online acquisition device of the secondary equipment through the optical fiber network, and the online acquisition device of the secondary equipment is connected to the temperature device, humidity device, video device, The secondary equipment analog quantity collector, the secondary equipment state quantity collector, the secondary equipment fixed value collector, the secondary equipment action collector, and the secondary equipment alarm collector are connected. Information sharing of various applications of the computer. The utility model can reduce the outage time of the equipment, improve the reliability and availability coefficient of the equipment, reduce the maintenance cost of the equipment, and improve the operating performance of the equipment.
Description
技术领域technical field
本实用新型涉及一种变电站二次设备数据、状态在线采集装置。The utility model relates to an on-line acquisition device for secondary equipment data and status of a substation.
背景技术Background technique
随着智能化电网建设的不断深入,电网规模的不断扩大,变电一次设备状态检修的推广,线路不停电检修技术的应用,变电二次设备固定周期性质的检修方式越来越不能满足电网的要求。因此,变电二次设备在运行体制、监测方法及检验项目、检修周期等方面,通过合适的技术措施和手段,掌握设备的健康状况,减少停电时间和停电范围,延长设备的检修周期,保证二次设备的可靠运行,满足电网安全稳定的要求,这就使得实行二次设备数据、状态在线采集装置成为必然的选择。With the deepening of smart grid construction, the continuous expansion of grid scale, the promotion of condition-based maintenance of primary substation equipment, the application of line non-stop maintenance technology, and the fixed-period maintenance methods of substation secondary equipment are increasingly unable to meet the requirements of the grid. requirements. Therefore, in terms of the operation system, monitoring methods, inspection items, and maintenance cycle of secondary substation equipment, through appropriate technical measures and means, the health status of the equipment can be mastered, the time and scope of power outages can be reduced, and the maintenance cycle of equipment can be extended to ensure The reliable operation of secondary equipment meets the requirements of power grid security and stability, which makes the implementation of secondary equipment data and status online acquisition device an inevitable choice.
电网调度运维存在多种应用设备(装置、采集器等),各种应用设备都采用各自的数据格式、信息传输方式,信息语义,因此设备之间的信息共享需要厂家之间人工映射,此工作量十分巨大甚至无法完成。原有的多种应用设备存在大量的重复数据,过多的数据冗余降低了信息应用效率,并加大了运维人员的维护工作量。There are many kinds of application equipment (device, collector, etc.) in power grid dispatching operation and maintenance. Each application equipment adopts its own data format, information transmission mode, and information semantics. Therefore, information sharing between equipment requires manual mapping between manufacturers. The workload is enormous or even impossible to complete. Excessive data redundancy reduces the efficiency of information application and increases the maintenance workload of operation and maintenance personnel.
实用新型内容Utility model content
本实用新型的目的就是为了解决上述问题,提供一种变电站二次设备数据、状态在线采集装置,它具有可以减少设备停运时间,提高设备可靠性和可用系数,降低设备检修费用,改善设备运行性能优点。The purpose of this utility model is to solve the above problems and provide an online acquisition device for substation secondary equipment data and status, which can reduce equipment downtime, improve equipment reliability and availability coefficient, reduce equipment maintenance costs, and improve equipment operation. Performance advantages.
为了实现上述目的,本实用新型采用如下技术方案:In order to achieve the above object, the utility model adopts the following technical solutions:
一种变电站二次设备数据、状态在线采集装置,包括用于在线评价的上位机、二次设备在线采集装置、温度装置、湿度装置、视频装置、二次设备模拟量采集器、二次设备状态量采集器、二次设备定值采集器、二次设备动作采集器、二次设备告警采集器,所述上位机通过光纤网络与二次设备在线采集装置连接,所述二次设备在线采集装置通过485接口与温度装置、湿度装置、视频装置、二次设备模拟量采集器、二次设备状态量采集器、二次设备定值采集器、二次设备动作采集器、二次设备告警采集器连接,所述上位机采用标准接口,能实现上位机的各种应用的信息共享。A substation secondary equipment data and status online acquisition device, including a host computer for online evaluation, a secondary equipment online acquisition device, a temperature device, a humidity device, a video device, a secondary equipment analog quantity collector, and a secondary equipment status Quantity collector, secondary equipment fixed value collector, secondary equipment action collector, secondary equipment alarm collector, the host computer is connected to the secondary equipment online collection device through the optical fiber network, and the secondary equipment online collection device Through the 485 interface and temperature device, humidity device, video device, secondary equipment analog quantity collector, secondary equipment state quantity collector, secondary equipment fixed value collector, secondary equipment action collector, secondary equipment alarm collector The upper computer adopts a standard interface, which can realize the information sharing of various applications of the upper computer.
所述温度装置可以是温度传感器。The temperature device may be a temperature sensor.
所述湿度装置可以是湿度传感器。The humidity device may be a humidity sensor.
所述视频装置可以是摄像头。The video device may be a camera.
所述二次设备在线采集装置可以是SF6气体检测装置。The secondary equipment online collection device may be an SF6 gas detection device.
所述二次设备模拟量采集器可以为型号是C2000MDVA的通道隔离型智能模拟量数字量采集器。The secondary device analog quantity collector may be a channel-isolated intelligent analog and digital quantity collector of model C2000MDVA.
所述二次设备状态量采集器的型号可以是Honeywell 6100的状态量采集器。The model of the state quantity collector of the secondary equipment may be a Honeywell 6100 state quantity collector.
所述二次设备定值采集器的型号可以是SR69-8804C的定值采集器。The model of the fixed value collector of the secondary equipment may be SR69-8804C fixed value collector.
所述二次设备动作采集器的型号可以是JMDM-4DMMAU的动作采集器。The model of the action collector of the secondary equipment may be a JMDM-4DMMAU action collector.
所述二次设备告警采集器的型号可以是GXC的告警信号采集器。The model of the secondary equipment alarm collector may be a GXC alarm signal collector.
本实用新型的有益效果:The beneficial effects of the utility model:
1、系统可以减少设备停运时间,提高设备可靠性和可用系数,降低设备检修费用,改善设备运行性能,提高经济效益,还可以加强运行和检修部门的协作,取消不必要的环节,迅速采取检修措施,消除设备缺陷,为大运行和大检修的推进提供必要的技术支撑。1. The system can reduce equipment downtime, improve equipment reliability and availability factor, reduce equipment maintenance costs, improve equipment operation performance, and increase economic benefits. It can also strengthen the cooperation between operation and maintenance departments, cancel unnecessary links, and quickly adopt Overhaul measures, eliminate equipment defects, and provide necessary technical support for the advancement of major operations and major overhauls.
2、系统将推动电气二次设备综合预警与故障诊断技术的应用,并根据设备的参数变化趋势,提供二次设备综合检修策略。2. The system will promote the application of comprehensive early warning and fault diagnosis technology for electrical secondary equipment, and provide comprehensive maintenance strategies for secondary equipment according to the changing trend of equipment parameters.
3、系统可以提高电网二次系统信息化、智能化水平,加强二次系统运行、管理各个环节的管控,及时发现二次设备存在的共性问题和家族性缺陷,实现二次设备专业管理智能化,提升电网二次系统运行管理水平。3. The system can improve the level of informatization and intelligence of the secondary system of the power grid, strengthen the control of the operation and management of the secondary system, timely discover the common problems and family defects of the secondary equipment, and realize the intelligent management of the secondary equipment , Improve the operation and management level of the secondary system of the power grid.
4、系统不仅为电网设备检修提供信息支持和辅助决策,同时为电网建设、运行、管理提供技术支持。4. The system not only provides information support and auxiliary decision-making for power grid equipment maintenance, but also provides technical support for power grid construction, operation and management.
5、变电站二次设备数据、状态采集装置的建立实现了二次设备所有数据的综合集合,把反映二次设备运行的稳态、暂态、动态数据以及变电站设备运行状态、图像等的数据的集合采集到该设备中,对数据集合统一建模、统一接入、统一存储、统一处理、统一接口。5. The establishment of the substation secondary equipment data and state acquisition device realizes the comprehensive collection of all data of the secondary equipment, and integrates the data reflecting the steady state, transient state and dynamic data of the operation of the secondary equipment, as well as the operating status and images of the substation equipment. The collection is collected in the device, and the data collection is modeled, accessed, stored, processed, and interfaced in a unified manner.
6、变电站二次设备数据、状态采集装置的建立实现了与应用无关的基本信息、数据维护并提供标准化、规范化的应用数据接口,以此为基础为高级应用的提供了庞大的数据量,实现了数据集成、数据标准化为其他系统提供信息资源。6. The establishment of the substation secondary equipment data and state acquisition device realizes the basic information and data maintenance irrelevant to the application and provides a standardized and standardized application data interface. Based on this, it provides a huge amount of data for advanced applications and realizes Data integration and data standardization provide information resources for other systems.
附图说明Description of drawings
图1为变电二次设备数据、状态采集装置系统;Figure 1 is the data and state acquisition device system of secondary substation equipment;
其中,1.上位机、2.二次设备在线采集装置、3.温度装置、4.湿度装置、5.视频装置、6.二次设备模拟量采集器、7.二次设备状态量采集器、8.二次设备定值采集器 9.二次设备动作采集器、10.二次设备告警采集器。Among them, 1. Host computer, 2. Secondary equipment online acquisition device, 3. Temperature device, 4. Humidity device, 5. Video device, 6. Secondary equipment analog quantity collector, 7. Secondary equipment state quantity collector , 8. Secondary equipment fixed value collector 9. Secondary equipment action collector, 10. Secondary equipment alarm collector.
具体实施方式Detailed ways
下面结合附图与实施例对本实用新型作进一步说明。Below in conjunction with accompanying drawing and embodiment the utility model is further described.
如图1所示,一种变电站二次设备数据、状态在线采集装置,包括上位机1、二次设备在线采集装置2、温度装置3、湿度装置4、视频装置5、二次设备模拟量采集器6、二次设备状态量采集器7、二次设备定值采集器8、二次设备动作采集器9、二次设备告警采集器10,所述上位机1通过光纤网络与二次设备在线采集装置2连接,所述二次设备在线采集装置2通过485接口与温度装置3、湿度装置4、视频装置5、二次设备模拟量采集器6、二次设备状态量采集器7、二次设备定值采集器8、二次设备动作采集器9、二次设备告警采集器10连接,所述上位机1采用标准接口,能实现上位机1的各种应用的信息共享。As shown in Figure 1, an online acquisition device for secondary equipment data and status in a substation includes a
上述虽然结合附图对本实用新型的具体实施方式进行了描述,但并非对本实用新型保护范围的限制,所属领域技术人员应该明白,在本实用新型的技术方案的基础上,本领域技术人员不需要付出创造性劳动即可做出的各种修改或变形仍在本实用新型的保护范围以内。Although the specific implementation of the utility model has been described above in conjunction with the accompanying drawings, it does not limit the protection scope of the utility model. Those skilled in the art should understand that on the basis of the technical solution of the utility model, those skilled in the art do not need to Various modifications or deformations that can be made with creative efforts are still within the protection scope of the present utility model.
Claims (1)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201220610374 CN202888970U (en) | 2012-11-16 | 2012-11-16 | Transformer substation secondary equipment data and state on-line collecting device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201220610374 CN202888970U (en) | 2012-11-16 | 2012-11-16 | Transformer substation secondary equipment data and state on-line collecting device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN202888970U true CN202888970U (en) | 2013-04-17 |
Family
ID=48080360
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN 201220610374 Expired - Fee Related CN202888970U (en) | 2012-11-16 | 2012-11-16 | Transformer substation secondary equipment data and state on-line collecting device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN202888970U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105807162A (en) * | 2016-03-25 | 2016-07-27 | 神华集团有限责任公司 | Action monitoring circuit for secondary circuits in electrical system and terminal strip |
| CN106768018A (en) * | 2016-11-25 | 2017-05-31 | 国电南瑞科技股份有限公司 | Site installs the on-line monitoring and diagnostic system and method for second power equipment |
-
2012
- 2012-11-16 CN CN 201220610374 patent/CN202888970U/en not_active Expired - Fee Related
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105807162A (en) * | 2016-03-25 | 2016-07-27 | 神华集团有限责任公司 | Action monitoring circuit for secondary circuits in electrical system and terminal strip |
| CN106768018A (en) * | 2016-11-25 | 2017-05-31 | 国电南瑞科技股份有限公司 | Site installs the on-line monitoring and diagnostic system and method for second power equipment |
| CN106768018B (en) * | 2016-11-25 | 2019-08-23 | 国电南瑞科技股份有限公司 | Site installs the on-line monitoring and diagnostic system and method for second power equipment |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN202634082U (en) | On-line monitoring and early warning system for direct-current equipment of substations | |
| CN102969796B (en) | Near-real-time electric quantity monitoring and dispatching management system for rural power grid | |
| CN103670921B (en) | Wind power generating set intellectual status monitoring system | |
| CN205263861U (en) | Power equipment information acquisition and management system based on RFID | |
| CN205535082U (en) | Wisdom gas pipe network geographic information manages platform system based on internet of things | |
| CN102545382A (en) | Online monitoring system of transformer device of intelligent transformer substation | |
| CN205265369U (en) | Cable and tunnel operation and maintenance management field data application apparatus | |
| CN105305641A (en) | Relay protection information data collection and uploading method | |
| CN110630910A (en) | An Urban Underground Gas Pipeline Monitoring System | |
| CN111509857A (en) | Low-voltage distribution transformer power-failure-free rapid monitoring system and method | |
| CN110932405A (en) | Intelligent monitoring and analyzing system for power transformation equipment based on big data | |
| CN110349048A (en) | Substation's multidimensional data runs interactive controlling platform and failure method of disposal | |
| CN103234520A (en) | Controller area network (CAN) bus-based settlement deformation monitoring system | |
| CN203289488U (en) | Power distribution integrated monitoring platform | |
| CN102331803B (en) | Condensation prevention control method and system for integrated converting station | |
| CN202888970U (en) | Transformer substation secondary equipment data and state on-line collecting device | |
| CN202798138U (en) | Intelligent transformer station | |
| CN205123412U (en) | Intelligence online running of transformer substation keeps watch on and long -range maintenance system | |
| CN203117817U (en) | Integrated control system for intelligent condensation prevention agent of transformer station | |
| CN205212551U (en) | Internet of things platform electric power monitored control system | |
| CN201570908U (en) | A data sharing centralized digital substation monitoring and protection device | |
| CN103280815B (en) | A kind of user side low-voltage reactive compensator capable | |
| CN202886016U (en) | On-line monitoring terminal for operation environment of secondary device of transformer substation | |
| CN106546814A (en) | A kind of intelligent low pressure electric quantity monitoring system | |
| Liang et al. | Application of digital twin in operation and maintenance of power transmission project |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130417 Termination date: 20161116 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |