CN202887565U - Switching operation standardized work training system - Google Patents

Switching operation standardized work training system Download PDF

Info

Publication number
CN202887565U
CN202887565U CN 201220595301 CN201220595301U CN202887565U CN 202887565 U CN202887565 U CN 202887565U CN 201220595301 CN201220595301 CN 201220595301 CN 201220595301 U CN201220595301 U CN 201220595301U CN 202887565 U CN202887565 U CN 202887565U
Authority
CN
China
Prior art keywords
phase
switching operation
group
standardized work
training system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220595301
Other languages
Chinese (zh)
Inventor
任小川
谢维兵
刘敏
陈慧春
谢伟
兰玉彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Power Education & Training Center
State Grid Corp of China SGCC
Original Assignee
Chongqing Power Education & Training Center
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Power Education & Training Center, State Grid Corp of China SGCC filed Critical Chongqing Power Education & Training Center
Priority to CN 201220595301 priority Critical patent/CN202887565U/en
Application granted granted Critical
Publication of CN202887565U publication Critical patent/CN202887565U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The utility model discloses a switching operation standardized work training system comprising a three-phase 110-kV simulated bus, two groups of 110-kV isolating switches, a group of 110-kV SP6 circuit breaker, a group of 110-kV current transformer, a 110-kV voltage transformer and a three-phase 110-kV simulated outgoing line, wherein the three-phase 110-kV simulated bus and the three-phase 110-kV simulated outgoing line are separated by one integral 110-kV primary equipment outgoing line, and are sequentially connected with the first group of the 110-kV isolating switch, the 110-kV SP6 circuit breaker, the 110-kV current transformer, the second group of the 110-kV isolating switch and the 110-kV voltage transformer. According to the switching operation standardized work training system, all the equipment is connected according to an actual working state of a scene to form a whole body and the whole body is placed in a practical training classroom and is suitable for switching operation standardized work training of a power plant and a transformer substation; and the switching operation standardized work training system has the advantages of complete functions, compact structure and field saving, and is convenient for implementation.

Description

Grid switching operation standardized work training system
Technical field
The utility model belongs to electric operation skills training field, specifically, relates to a kind of analog hardware system for the training of Substation Switch Changing Operation standardized work.
Background technology
Electric system is in operation, and is used for method of operation change, equipment interruption maintenance or processes defective etc., need to carry out a series of grid switching operation.Because complicacy and the importance of electric operation must strictly be undertaken by the standardized work flow process when carrying out grid switching operation in transformer station.If operate not standardized work flow process, belong to serious violating the regulations or maloperation occurs and cause accident by producing regulation, cause device damage, forced outage or personal injury, cause serious consequence.Therefore, operative norm equalization flow process as an important system that guarantees electric power netting safe running, is subject to the great attention of electrical production run unit in Substation Switch Changing Operation.Yet traditional switching operation of power transformation training is to carry out in the substation simulation system.Because analogue system does not have physical device and site environment, training or the training effect that can't carry out the normalizing operation flow process are bad.
The utility model content
The utility model is for solving the deficiencies in the prior art, a kind of grid switching operation standardized work training system is provided, imitating substation execute-in-place environment, employing physical device, simulation 110kV bus and outlet are trained power transformation operation personnel's standardized work behavior.
The technical scheme that the utility model is taked is: a kind of grid switching operation standardized work training system comprises three-phase 110kV analog bus, two groups of 110kV disconnectores, one group of 110kVSF 6Isolating switch, one group of 110kV current transformer, 110kV voltage transformer (VT) and three-phase 110kV simulation outlet, between three-phase 110kV analog bus and three-phase 110kV simulation outlet, by a complete 110kV primary equipment outgoing line interval, connect successively first group of 110kV disconnector, 110kVSF 6Isolating switch, 110kV current transformer, second group of 110kV disconnector and 110kV voltage transformer (VT).
Various device in the utility model all connects by on-the-spot actual working state, form an integral body, and configurable direct current operative power source and control flow, adopted the micro_computer five_proof system, in operation circuit, install anti-misoperation locking device additional and in system, utilize power-frequency voltage generator etc., simulate electric equipment live situation, be used for the trainings such as electrical equipment electrical verification, ground connection, layout safety practice, be placed in the real training classroom, perfect in shape and function, compact conformation are used in suitable generating plant, the training of Substation Switch Changing Operation standardized work, save space, be convenient to implement.
Description of drawings
Fig. 1 is floor plan synoptic diagram of the present utility model.
Embodiment
Below in conjunction with the drawings and specific embodiments the utility model is further described.
As shown in Figure 1, a kind of grid switching operation standardized work training system has three-phase 110kV analog bus 1, two groups of 110kV disconnectores 2 and 5, one groups of 110kVSF 6Isolating switch 3, one group of 110kV current transformer 4,110kV voltage transformer (VT) 6 and three-phase 110kV simulation outlet 7, between three-phase 110kV analog bus 1 and three-phase 110kV simulation outlet 7, by a complete 110kV primary equipment outgoing line interval, connect successively first group of 110kV disconnector 2,110kVSF 6Isolating switch 3,110kV current transformer 4, second group of 110kV disconnector 5 and 110kV voltage transformer (VT) 6.
110kV disconnector 2 and 5,110kVSF 6Isolating switch 3,110kV current transformer 4 and 110kV voltage transformer (VT) 6 etc. support respectively the top of cement important actor (among the figure shown in the double dot dash line) by insulator.
Various device all connects by on-the-spot actual working state, form an integral body, and configurable direct current operative power source and control flow, adopted the micro_computer five_proof system, in operation circuit, install anti-misoperation locking device additional and in system, utilize power-frequency voltage generator etc., simulate electric equipment live situation, be used for the trainings such as electrical equipment electrical verification, ground connection, layout safety practice, be placed in the real training classroom, perfect in shape and function, compact conformation are used in suitable generating plant, the training of Substation Switch Changing Operation standardized work, save space, be convenient to implement.

Claims (2)

1. a grid switching operation standardized work training system is characterized in that: comprise three-phase 110kV analog bus, two groups of 110kV disconnectores, one group of 110kVSF 6Isolating switch, one group of 110kV current transformer, 110kV voltage transformer (VT) and three-phase 110kV simulation outlet, between three-phase 110kV analog bus and three-phase 110kV simulation outlet, by a complete 110kV primary equipment outgoing line interval, connect successively first group of 110kV disconnector, 110kVSF 6Isolating switch, 110kV current transformer, second group of 110kV disconnector and 110kV voltage transformer (VT).
2. grid switching operation standardized work training system according to claim 1 is characterized in that: 110kV disconnector, 110kVSF 6Isolating switch, 110kV current transformer and 110kV voltage transformer (VT) support respectively the top of cement important actor by insulator.
CN 201220595301 2012-11-13 2012-11-13 Switching operation standardized work training system Expired - Lifetime CN202887565U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220595301 CN202887565U (en) 2012-11-13 2012-11-13 Switching operation standardized work training system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220595301 CN202887565U (en) 2012-11-13 2012-11-13 Switching operation standardized work training system

Publications (1)

Publication Number Publication Date
CN202887565U true CN202887565U (en) 2013-04-17

Family

ID=48078969

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220595301 Expired - Lifetime CN202887565U (en) 2012-11-13 2012-11-13 Switching operation standardized work training system

Country Status (1)

Country Link
CN (1) CN202887565U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108899911A (en) * 2018-08-16 2018-11-27 中国能源建设集团广东省电力设计研究院有限公司 Direct current transformer substation system
CN112037599A (en) * 2020-08-27 2020-12-04 深圳供电局有限公司 Ground wire actual operation simulation training device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108899911A (en) * 2018-08-16 2018-11-27 中国能源建设集团广东省电力设计研究院有限公司 Direct current transformer substation system
CN108899911B (en) * 2018-08-16 2021-04-06 中国能源建设集团广东省电力设计研究院有限公司 Direct current power transformation system
CN112037599A (en) * 2020-08-27 2020-12-04 深圳供电局有限公司 Ground wire actual operation simulation training device
CN112037599B (en) * 2020-08-27 2022-07-22 深圳供电局有限公司 Ground wire actual operation simulation training device

Similar Documents

Publication Publication Date Title
CN204360672U (en) A kind of substation equipment insulating ground failure simulation device
CN201893058U (en) Safe simulation training system for distribution room
CN108550305A (en) Distributed new O&M simulation training system
CN203745807U (en) Same-tower double-circuit direct current engineering control protection function test system
CN103544857A (en) Integrated power transformation operation and maintenance training system
CN201853401U (en) Distribution room simulation system
CN201398029Y (en) Main wiring structure capable of reducing scope of power failure of 220kVGIS substation
CN202221628U (en) Simulation system for power grid of hybrid transformer substation
CN204965174U (en) Power hardware is at ring test system
CN108630074A (en) Distributed wind-power generator O&M simulation training system
CN102222438B (en) Dynamic simulation experiment device for researching dynamic characteristic of direct current (DC) transmission system
CN108648580A (en) Distributed photovoltaic power generation O&M simulation training system
CN202887565U (en) Switching operation standardized work training system
CN202631662U (en) Testing device for simulating ice coating of transmission line
CN105513903B (en) A kind of breaker debugging platform
CN205068857U (en) Multi-station voltage loss quick power restoration training platform for electric power system
CN203659303U (en) Intelligent transformer station monitor training system
CN203981790U (en) A kind of combined type backup auto-activating device tester
CN204229714U (en) A kind of experimental facilities of small electrical system
CN102707172A (en) Test device for simulating icing of power transmission line
CN202171890U (en) Relay protection test simulation apparatus
CN205910921U (en) Wind power generation simulation practical training system
CN106383278B (en) Reconfigurable direct-current power grid simulation test system
CN210324664U (en) Simulation test system of transformer substation training device
CN203085041U (en) Electrical experiment apparatus of middle school physics

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20130417

CX01 Expiry of patent term