CN202887565U - Switching operation standardized work training system - Google Patents
Switching operation standardized work training system Download PDFInfo
- Publication number
- CN202887565U CN202887565U CN 201220595301 CN201220595301U CN202887565U CN 202887565 U CN202887565 U CN 202887565U CN 201220595301 CN201220595301 CN 201220595301 CN 201220595301 U CN201220595301 U CN 201220595301U CN 202887565 U CN202887565 U CN 202887565U
- Authority
- CN
- China
- Prior art keywords
- phase
- switching operation
- group
- standardized work
- training system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000012549 training Methods 0.000 title claims abstract description 23
- 238000004088 simulation Methods 0.000 claims description 8
- 239000004568 cement Substances 0.000 claims description 2
- 239000012212 insulator Substances 0.000 claims description 2
- 238000000034 method Methods 0.000 description 6
- 230000009466 transformation Effects 0.000 description 2
- 238000012795 verification Methods 0.000 description 2
- 208000033999 Device damage Diseases 0.000 description 1
- 208000027418 Wounds and injury Diseases 0.000 description 1
- 230000006378 damage Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000002950 deficient Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 208000014674 injury Diseases 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
Abstract
The utility model discloses a switching operation standardized work training system comprising a three-phase 110-kV simulated bus, two groups of 110-kV isolating switches, a group of 110-kV SP6 circuit breaker, a group of 110-kV current transformer, a 110-kV voltage transformer and a three-phase 110-kV simulated outgoing line, wherein the three-phase 110-kV simulated bus and the three-phase 110-kV simulated outgoing line are separated by one integral 110-kV primary equipment outgoing line, and are sequentially connected with the first group of the 110-kV isolating switch, the 110-kV SP6 circuit breaker, the 110-kV current transformer, the second group of the 110-kV isolating switch and the 110-kV voltage transformer. According to the switching operation standardized work training system, all the equipment is connected according to an actual working state of a scene to form a whole body and the whole body is placed in a practical training classroom and is suitable for switching operation standardized work training of a power plant and a transformer substation; and the switching operation standardized work training system has the advantages of complete functions, compact structure and field saving, and is convenient for implementation.
Description
Technical field
The utility model belongs to electric operation skills training field, specifically, relates to a kind of analog hardware system for the training of Substation Switch Changing Operation standardized work.
Background technology
Electric system is in operation, and is used for method of operation change, equipment interruption maintenance or processes defective etc., need to carry out a series of grid switching operation.Because complicacy and the importance of electric operation must strictly be undertaken by the standardized work flow process when carrying out grid switching operation in transformer station.If operate not standardized work flow process, belong to serious violating the regulations or maloperation occurs and cause accident by producing regulation, cause device damage, forced outage or personal injury, cause serious consequence.Therefore, operative norm equalization flow process as an important system that guarantees electric power netting safe running, is subject to the great attention of electrical production run unit in Substation Switch Changing Operation.Yet traditional switching operation of power transformation training is to carry out in the substation simulation system.Because analogue system does not have physical device and site environment, training or the training effect that can't carry out the normalizing operation flow process are bad.
The utility model content
The utility model is for solving the deficiencies in the prior art, a kind of grid switching operation standardized work training system is provided, imitating substation execute-in-place environment, employing physical device, simulation 110kV bus and outlet are trained power transformation operation personnel's standardized work behavior.
The technical scheme that the utility model is taked is: a kind of grid switching operation standardized work training system comprises three-phase 110kV analog bus, two groups of 110kV disconnectores, one group of 110kVSF
6Isolating switch, one group of 110kV current transformer, 110kV voltage transformer (VT) and three-phase 110kV simulation outlet, between three-phase 110kV analog bus and three-phase 110kV simulation outlet, by a complete 110kV primary equipment outgoing line interval, connect successively first group of 110kV disconnector, 110kVSF
6Isolating switch, 110kV current transformer, second group of 110kV disconnector and 110kV voltage transformer (VT).
Various device in the utility model all connects by on-the-spot actual working state, form an integral body, and configurable direct current operative power source and control flow, adopted the micro_computer five_proof system, in operation circuit, install anti-misoperation locking device additional and in system, utilize power-frequency voltage generator etc., simulate electric equipment live situation, be used for the trainings such as electrical equipment electrical verification, ground connection, layout safety practice, be placed in the real training classroom, perfect in shape and function, compact conformation are used in suitable generating plant, the training of Substation Switch Changing Operation standardized work, save space, be convenient to implement.
Description of drawings
Fig. 1 is floor plan synoptic diagram of the present utility model.
Embodiment
Below in conjunction with the drawings and specific embodiments the utility model is further described.
As shown in Figure 1, a kind of grid switching operation standardized work training system has three-phase 110kV analog bus 1, two groups of 110kV disconnectores 2 and 5, one groups of 110kVSF
6Isolating switch 3, one group of 110kV current transformer 4,110kV voltage transformer (VT) 6 and three-phase 110kV simulation outlet 7, between three-phase 110kV analog bus 1 and three-phase 110kV simulation outlet 7, by a complete 110kV primary equipment outgoing line interval, connect successively first group of 110kV disconnector 2,110kVSF
6Isolating switch 3,110kV current transformer 4, second group of 110kV disconnector 5 and 110kV voltage transformer (VT) 6.
110kV disconnector 2 and 5,110kVSF
6Isolating switch 3,110kV current transformer 4 and 110kV voltage transformer (VT) 6 etc. support respectively the top of cement important actor (among the figure shown in the double dot dash line) by insulator.
Various device all connects by on-the-spot actual working state, form an integral body, and configurable direct current operative power source and control flow, adopted the micro_computer five_proof system, in operation circuit, install anti-misoperation locking device additional and in system, utilize power-frequency voltage generator etc., simulate electric equipment live situation, be used for the trainings such as electrical equipment electrical verification, ground connection, layout safety practice, be placed in the real training classroom, perfect in shape and function, compact conformation are used in suitable generating plant, the training of Substation Switch Changing Operation standardized work, save space, be convenient to implement.
Claims (2)
1. a grid switching operation standardized work training system is characterized in that: comprise three-phase 110kV analog bus, two groups of 110kV disconnectores, one group of 110kVSF
6Isolating switch, one group of 110kV current transformer, 110kV voltage transformer (VT) and three-phase 110kV simulation outlet, between three-phase 110kV analog bus and three-phase 110kV simulation outlet, by a complete 110kV primary equipment outgoing line interval, connect successively first group of 110kV disconnector, 110kVSF
6Isolating switch, 110kV current transformer, second group of 110kV disconnector and 110kV voltage transformer (VT).
2. grid switching operation standardized work training system according to claim 1 is characterized in that: 110kV disconnector, 110kVSF
6Isolating switch, 110kV current transformer and 110kV voltage transformer (VT) support respectively the top of cement important actor by insulator.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220595301 CN202887565U (en) | 2012-11-13 | 2012-11-13 | Switching operation standardized work training system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220595301 CN202887565U (en) | 2012-11-13 | 2012-11-13 | Switching operation standardized work training system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202887565U true CN202887565U (en) | 2013-04-17 |
Family
ID=48078969
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220595301 Expired - Lifetime CN202887565U (en) | 2012-11-13 | 2012-11-13 | Switching operation standardized work training system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202887565U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108899911A (en) * | 2018-08-16 | 2018-11-27 | 中国能源建设集团广东省电力设计研究院有限公司 | Direct current transformer substation system |
CN112037599A (en) * | 2020-08-27 | 2020-12-04 | 深圳供电局有限公司 | Ground wire actual operation simulation training device |
-
2012
- 2012-11-13 CN CN 201220595301 patent/CN202887565U/en not_active Expired - Lifetime
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108899911A (en) * | 2018-08-16 | 2018-11-27 | 中国能源建设集团广东省电力设计研究院有限公司 | Direct current transformer substation system |
CN108899911B (en) * | 2018-08-16 | 2021-04-06 | 中国能源建设集团广东省电力设计研究院有限公司 | Direct current power transformation system |
CN112037599A (en) * | 2020-08-27 | 2020-12-04 | 深圳供电局有限公司 | Ground wire actual operation simulation training device |
CN112037599B (en) * | 2020-08-27 | 2022-07-22 | 深圳供电局有限公司 | Ground wire actual operation simulation training device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204360672U (en) | A kind of substation equipment insulating ground failure simulation device | |
CN201893058U (en) | Safe simulation training system for distribution room | |
CN108550305A (en) | Distributed new O&M simulation training system | |
CN203745807U (en) | Same-tower double-circuit direct current engineering control protection function test system | |
CN103544857A (en) | Integrated power transformation operation and maintenance training system | |
CN201853401U (en) | Distribution room simulation system | |
CN201398029Y (en) | Main wiring structure capable of reducing scope of power failure of 220kVGIS substation | |
CN202221628U (en) | Simulation system for power grid of hybrid transformer substation | |
CN204965174U (en) | Power hardware is at ring test system | |
CN108630074A (en) | Distributed wind-power generator O&M simulation training system | |
CN102222438B (en) | Dynamic simulation experiment device for researching dynamic characteristic of direct current (DC) transmission system | |
CN108648580A (en) | Distributed photovoltaic power generation O&M simulation training system | |
CN202887565U (en) | Switching operation standardized work training system | |
CN202631662U (en) | Testing device for simulating ice coating of transmission line | |
CN105513903B (en) | A kind of breaker debugging platform | |
CN205068857U (en) | Multi-station voltage loss quick power restoration training platform for electric power system | |
CN203659303U (en) | Intelligent transformer station monitor training system | |
CN203981790U (en) | A kind of combined type backup auto-activating device tester | |
CN204229714U (en) | A kind of experimental facilities of small electrical system | |
CN102707172A (en) | Test device for simulating icing of power transmission line | |
CN202171890U (en) | Relay protection test simulation apparatus | |
CN205910921U (en) | Wind power generation simulation practical training system | |
CN106383278B (en) | Reconfigurable direct-current power grid simulation test system | |
CN210324664U (en) | Simulation test system of transformer substation training device | |
CN203085041U (en) | Electrical experiment apparatus of middle school physics |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20130417 |
|
CX01 | Expiry of patent term |