CN202865851U - Inclined bracing steel enclosing purlin shear pedal reinforcement system - Google Patents
Inclined bracing steel enclosing purlin shear pedal reinforcement system Download PDFInfo
- Publication number
- CN202865851U CN202865851U CN201220551781.XU CN201220551781U CN202865851U CN 202865851 U CN202865851 U CN 202865851U CN 201220551781 U CN201220551781 U CN 201220551781U CN 202865851 U CN202865851 U CN 202865851U
- Authority
- CN
- China
- Prior art keywords
- steel
- purlin
- steel plate
- shearing resistance
- pedals
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Butt Welding And Welding Of Specific Article (AREA)
Abstract
Description
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201220551781.XU CN202865851U (en) | 2012-10-26 | 2012-10-26 | Inclined bracing steel enclosing purlin shear pedal reinforcement system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201220551781.XU CN202865851U (en) | 2012-10-26 | 2012-10-26 | Inclined bracing steel enclosing purlin shear pedal reinforcement system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202865851U true CN202865851U (en) | 2013-04-10 |
Family
ID=48032582
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201220551781.XU Expired - Fee Related CN202865851U (en) | 2012-10-26 | 2012-10-26 | Inclined bracing steel enclosing purlin shear pedal reinforcement system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202865851U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104018509A (en) * | 2014-06-25 | 2014-09-03 | 华东建筑设计研究院有限公司 | Anti-shearing structure for connecting reinforced concrete enclosing purlin with fender posts |
CN105780782A (en) * | 2016-05-18 | 2016-07-20 | 中铁第四勘察设计院集团有限公司 | Oblique support and steel retaining purlin slip preventing device with piles constructed by SMW construction process |
CN107700490A (en) * | 2017-09-12 | 2018-02-16 | 中国建筑第八工程局有限公司 | Gunite concrete makes up constructing structure and its construction method in advance between the stratum stake of sand ovum |
-
2012
- 2012-10-26 CN CN201220551781.XU patent/CN202865851U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104018509A (en) * | 2014-06-25 | 2014-09-03 | 华东建筑设计研究院有限公司 | Anti-shearing structure for connecting reinforced concrete enclosing purlin with fender posts |
CN105780782A (en) * | 2016-05-18 | 2016-07-20 | 中铁第四勘察设计院集团有限公司 | Oblique support and steel retaining purlin slip preventing device with piles constructed by SMW construction process |
CN105780782B (en) * | 2016-05-18 | 2018-05-22 | 中铁第四勘察设计院集团有限公司 | A kind of SMW engineering methods stake bearing diagonal steel purlin antiskid moving device |
CN107700490A (en) * | 2017-09-12 | 2018-02-16 | 中国建筑第八工程局有限公司 | Gunite concrete makes up constructing structure and its construction method in advance between the stratum stake of sand ovum |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202865851U (en) | Inclined bracing steel enclosing purlin shear pedal reinforcement system | |
CN203531147U (en) | Embedded type anchor bolt connecting structure for I-shaped steel column | |
CN206189275U (en) | Bridge pier bent cap cast -in -situ construction's awl beiLei beam formula of climbing support | |
CN202347446U (en) | Supporting structure for construction of zero block of reinforced concrete continuous beam | |
CN201924289U (en) | Bracket structure for 0# block of high-pier long-span continuous rigid frame bridge | |
CN204738236U (en) | Pier vertical reinforcement installation mould | |
CN110409624B (en) | Reverse calculation and construction method for large equipment installation and main body structure | |
CN203174621U (en) | Tower crane foundation | |
CN207159834U (en) | A kind of device of constructing continuous beam end bay Cast-in-Situ Segment | |
CN203640061U (en) | Node connecting structure of reinforced concrete column of basement | |
CN103967332B (en) | The construction method of a kind of building site enclosing | |
CN103882808B (en) | Ramp bridge and main line bridge join the construction method across erecting beam support system | |
CN203684102U (en) | Supporting system for precast beam formed by connecting span erection of ramp bridge and main line bridge | |
CN204510215U (en) | For the steel platform of foundation pit construction | |
CN203855992U (en) | Novel foundation strengthening structure | |
CN202520007U (en) | Joint construction for combination and reinforcement of frame structure | |
CN203569485U (en) | Steel truss beam elevation adjusting device | |
CN206971253U (en) | Column bottom bindiny mechanism | |
CN206418817U (en) | A kind of assembled arch steel machining shed | |
CN204418423U (en) | A kind of built-in steel plate composite support shear wall structure | |
CN204716252U (en) | Gate type support frame | |
CN103741857A (en) | Floor system with U-shaped steel beams, steel bar trusses and floor bearing plates | |
CN202509500U (en) | Steel purlin support structure | |
CN204938757U (en) | The connection structure of a kind of crane girder and bracket | |
CN204326490U (en) | A kind of construction of lift well operating platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee |
Owner name: 3RD ENGINEERING CO., LTD. OF CHINA RAILWAY URBAN C Free format text: FORMER NAME: THE NO.6 ENGINEERING CO., LTD. OF CHINA RAILWAY 22TH BUREAU GROUP |
|
CP03 | Change of name, title or address |
Address after: 300451 Tianjin Binhai New Area, Tanggu new North Road, No. 4668 Patentee after: 3RD ENGINEERING COMPANY LTD. OF CHINA RAILWAY URBAN CONSTRUCTION Group Patentee after: China Railway 22nd Bureau Group Co.,ltd. Address before: 150016, Heilongjiang, Nangang Province, Harbin District, 128 trees Street Patentee before: 6TH ENGINEERING CO LTD OF CHINA RAILWAY 22TH BUREAU Group Patentee before: China Railway 22nd Bureau Group Co.,ltd. |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130410 Termination date: 20211026 |