CN202865755U - Immersed tunnel pipe joint axis positioning system - Google Patents
Immersed tunnel pipe joint axis positioning system Download PDFInfo
- Publication number
- CN202865755U CN202865755U CN201220439144.3U CN201220439144U CN202865755U CN 202865755 U CN202865755 U CN 202865755U CN 201220439144 U CN201220439144 U CN 201220439144U CN 202865755 U CN202865755 U CN 202865755U
- Authority
- CN
- China
- Prior art keywords
- immersed tube
- immersed
- pipe joint
- axis positioning
- joint
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The utility model discloses an immersed tunnel pipe joint axis positioning system which comprises a first steel end casing fixedly arranged at the non-butt-joint end of an immersed pipe joint and a second steel end casing fixedly arranged at the non-butt-joint end of a to-be-immersed pipe joint. A water sealing belt is arranged between a first steel end casing and a second steel end casing, a gap is reversed between the butt joint ends of the immersed pipe joint and the to-be-immersed pipe joint, and a telescopic limit device is arranged at the butt joint end of the immersed pipe joint. The immersed tunnel pipe joint axis positioning system has a simplified system setting method, simplifies immersed pipe joint axis positioning construction work procedures, improves construction efficiency, and is convenient to operate, reliable in system operation and strong in pipe joint axis positioning capacity.
Description
Technical field
The utility model relates to the bridge construction apparatus field, refers to particularly it is a kind of immersed tube tunnel tube coupling axis positioning system.
Background technology
In bridge construction, after the installation of immersed tube tube coupling is preliminary in place, need to adopt tube coupling axis positioning system that the tube coupling misalignment of axe is carried out accurate adjustment, namely the deviation of the non-butt end of immersed tube tube coupling off-design immersed tube center line is eliminated or adjusted in the design deviation value of permission.Traditional immersed tube tunnel tube coupling axis positioning system adopts gantry type tube coupling positioning system, and the deadweight of gantry type tube coupling positioning system is larger, is unfavorable for the operation recovery, and its complex structure, is unfavorable for dismounting, therefore, is necessary prior art is improved.
The utility model content
The purpose of this utility model is exactly the deficiency that will solve the above-mentioned background technology, provides a kind of system that transposes from heavy and light, the simple immersed tube tunnel tube coupling axis positioning system that reaches convenient and reliable operation of composition.
The technical solution of the utility model is: a kind of immersed tube tunnel tube coupling axis positioning system, comprise that being fixedly installed on immersed tube saves the first steel end housing of end, non-butt end and be fixedly installed on the second steel end housing on the end, non-butt end for the treatment of the immersed tube joint, be provided with waterstop between described the first steel end housing and the second steel end housing, its special character is: described immersed tube joint and treat that the butt end of immersed tube joint leaves the space, the end, butt end of immersed tube joint is provided with device for limiting expansion.
In such scheme:
Described device for limiting expansion comprises spacing jack, and described spacing jack is fixed in the spacing jacking bracket, and spacing jacking bracket is fixedly connected on the end, butt end that immersed tube has saved by spacing jacking bracket dowel.
The first described steel end housing is fixedly connected on by the first steel end housing dowel that immersed tube saves on the end, non-butt end, and the second steel end housing is fixedly connected on the end, non-butt end for the treatment of the immersed tube joint by the second steel end housing dowel.
Described waterstop is the GINA waterstop, and the GINA waterstop can well adapt to the inhomogeneous distortion that produces of pipeline section, has good stagnant water effect.
During concrete the use, after the immersed tube joint is finished the locking backfill, by holing through survey the actual coordinate value on the butt end drift angle angle point of heavy pipe and design coordinate figure are compared, can find that the immersed tube joint exists certain misalignment of axe (deviate is in permissible value).For avoiding occurring larger axis cumulative departure, be arranged in the piston masthead amount of the stretching difference of the spacing jack on the drift angle of heavy pipe butt end by accurate control, cause and be fixed in the chrominance signal for the treatment of the GINA waterstop on the immersed tube joint steel end housing, thereby make the deviation of the non-butt end off-design immersed tube center line for the treatment of the immersed tube joint eliminate or adjust in the design deviation value of permission.
The utility model has the advantage of:
1, system is from heavy and light: compared to traditional gantry type tube coupling positioning system, the deadweight of novel positioning system greatly alleviates easy disassembly;
2, system forms simple: the system that simplifies arranges form, has simplified immersed tube tube coupling axis positioning working procedure, has improved efficiency of construction;
3, quantize correction control: owing to can accurately control the piston masthead amount of stretching that is arranged in the spacing jack on the drift angle of heavy pipe butt end, can make accurately control of tube coupling axis positioning.
4, compared to traditional gantry type tube coupling positioning system, novel positioning system architecture deadweight greatly alleviates, and is beneficial to the recovery operation.
The utlity model has the system that simplifies form is set, simplified immersed tube tube coupling axis positioning working procedure, improved efficiency of construction, system features in convenient is reliable, and tube coupling axis positioning ability is strong.
Description of drawings
Fig. 1 is the utility model general arrangement schematic.
Fig. 2 is that the details of positioning system in the utility model is arranged schematic diagram.
Among the figure: the immersed tube joint-1, waterstop-2, the first steel end housing-3; The first steel end housing dowel-4.1, the second steel end housing dowel-4.2, spacing jacking bracket dowel-5, spacing jacking bracket-6, spacing jack-7 is treated immersed tube joint the-8, second steel end housing-9.
The specific embodiment
The present invention is described in further detail below in conjunction with the drawings and specific embodiments, be convenient to be well understood to the present invention, but they do not consist of restriction to the present invention.
A kind of immersed tube tunnel tube coupling axis positioning system as shown in Figure 2, comprise that being fixedly installed on immersed tube saves the first steel end housing 3 of end, 1 non-butt end and be fixedly installed on the second steel end housing 9 on the end, non-butt end for the treatment of immersed tube joint 8, the first steel end housing 3 is fixedly connected on by the first steel end housing dowel 4.1 that immersed tube saves on the end, 1 non-butt end, and the second steel end housing 9 is fixedly connected on the end, non-butt end for the treatment of immersed tube joint 8 by the second steel end housing dowel 4.2.Be provided with waterstop 2 between the first steel end housing 3 and the second steel end housing 9, the waterstop 2 in the present embodiment is the GINA waterstop, and the GINA waterstop can well adapt to the inhomogeneous distortion that produces of pipeline section, has good stagnant water effect.Immersed tube joint 1 leaves the space with the butt end for the treatment of immersed tube joint 8, the end, butt end of immersed tube joint 1 is provided with device for limiting expansion, described device for limiting expansion comprises spacing jack 7, spacing jack 7 is fixed in the spacing jacking bracket 6, and spacing jacking bracket 6 is fixedly connected on the end, butt end of the joint of immersed tube 1 by spacing jacking bracket dowel 5.
As described in Figure 1, the described immersed tube tunnel tube coupling of present embodiment axis positioning system layout is on four drift angles in heavy pipe 1 butt end.
During implementation, after immersed tube joint 1 is finished the locking backfill, by holing through survey the actual coordinate value on four the drift angle angle points in heavy pipe 1 butt end and design coordinate figure are compared, find that immersed tube joint 1 exists certain misalignment of axe (deviate is in permissible value).For avoiding occurring larger axis cumulative departure, be arranged in the piston masthead amount of the stretching difference of the spacing jack (7) on four drift angles in heavy pipe 1 butt end by accurate control, cause to be fixed in and treat that immersed tube saves the chrominance signal of the GINA waterstop 2 on the 8 steel end housings 3, treat that the deviation that immersed tube saves 8 non-butt end off-design immersed tube center lines eliminates or adjust in the design deviation value of permission thereby make.
Present embodiment has the system that simplifies form is set, simplified immersed tube tube coupling axis positioning working procedure, improve efficiency of construction the present invention and optimized tube coupling axis positioning systematic parameter, by to being arranged in the accurate control of the spacing jack 7 on four drift angles in heavy pipe 1 butt end, make system features in convenient reliable, tube coupling axis positioning ability is strong, and compared to traditional gantry type tube coupling positioning system, novel positioning system architecture deadweight greatly alleviates, and is beneficial to the recovery operation.
Claims (4)
1. immersed tube tunnel tube coupling axis positioning system, comprise the first steel end housing (3) that is fixedly installed on the joint of immersed tube end, (1) non-butt end and be fixedly installed on and treat that immersed tube saves the second steel end housing (9) on the end, non-butt end of (8), be provided with waterstop (2) between described the first steel end housing (3) and the second steel end housing (9), it is characterized in that: described immersed tube joint (1) and treat that the butt end of immersed tube joint (8) leaves the space, the immersed tube end, butt end of saving (1) is provided with device for limiting expansion.
2. a kind of immersed tube tunnel tube coupling axis positioning according to claim 1 system, it is characterized in that: described device for limiting expansion comprises spacing jack (7), described spacing jack (7) is fixed in the spacing jacking bracket (6), and spacing jacking bracket (6) is fixedly connected on the end, butt end of the joint of immersed tube (1) by spacing jacking bracket dowel (5).
3. a kind of immersed tube tunnel tube coupling axis positioning according to claim 1 system, it is characterized in that: the first described steel end housing (3) is fixedly connected on the immersed tube joint end, (1) non-butt end by the first steel end housing dowel (4.1), and the second steel end housing (9) is fixedly connected on by the second steel end housing dowel (4.2) and treats that immersed tube saves on the end, non-butt end of (8).
4. a kind of immersed tube tunnel tube coupling axis positioning according to claim 1 system, it is characterized in that: described waterstop (2) is the GINA waterstop.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201220439144.3U CN202865755U (en) | 2012-08-31 | 2012-08-31 | Immersed tunnel pipe joint axis positioning system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201220439144.3U CN202865755U (en) | 2012-08-31 | 2012-08-31 | Immersed tunnel pipe joint axis positioning system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202865755U true CN202865755U (en) | 2013-04-10 |
Family
ID=48032486
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201220439144.3U Expired - Lifetime CN202865755U (en) | 2012-08-31 | 2012-08-31 | Immersed tunnel pipe joint axis positioning system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202865755U (en) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103321248A (en) * | 2013-06-06 | 2013-09-25 | 交通运输部广州打捞局 | Recycling external immersed tube tunnel vertical supporting device and supporting method thereof |
CN104775449A (en) * | 2015-02-16 | 2015-07-15 | 中交四航局第二工程有限公司 | Water stop belt installing method for large-scale sunken pipe |
CN106337439A (en) * | 2015-07-31 | 2017-01-18 | 合肥工业大学 | Method for achieving underwater butt joint of submerged floating tunnel through butt joint device |
CN107476342A (en) * | 2017-08-31 | 2017-12-15 | 上海振华重工(集团)股份有限公司 | A kind of immersed tube tunnel final joint pipe bending cylinder bearing installation method |
CN107587522A (en) * | 2017-08-30 | 2018-01-16 | 中交公路规划设计院有限公司 | A kind of connection supports system and play movement support adjusting method |
CN107687181A (en) * | 2017-09-01 | 2018-02-13 | 中交第航务工程局有限公司 | FS final spice entirety fine adjustment method |
CN108316282A (en) * | 2017-12-29 | 2018-07-24 | 中国建筑第八工程局有限公司 | The piecing devices and its construction method of diaphram wall |
CN108360384A (en) * | 2018-02-28 | 2018-08-03 | 浙江省交通规划设计研究院 | Underway push construction method |
CN108360567A (en) * | 2018-01-25 | 2018-08-03 | 中铁二十三局集团有限公司 | The reversed construction method in precast assembly tunnel |
CN108411938A (en) * | 2018-01-25 | 2018-08-17 | 中铁二十三局集团建筑设计研究院有限公司 | A kind of precast assembly tunnel |
CN114293589A (en) * | 2022-01-28 | 2022-04-08 | 华中科技大学 | Intelligent waterproof and anti-seismic immersed tunnel pipe joint |
-
2012
- 2012-08-31 CN CN201220439144.3U patent/CN202865755U/en not_active Expired - Lifetime
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103321248A (en) * | 2013-06-06 | 2013-09-25 | 交通运输部广州打捞局 | Recycling external immersed tube tunnel vertical supporting device and supporting method thereof |
CN103321248B (en) * | 2013-06-06 | 2015-05-20 | 交通运输部广州打捞局 | Recycling external immersed tube tunnel vertical supporting device and supporting method thereof |
CN104775449A (en) * | 2015-02-16 | 2015-07-15 | 中交四航局第二工程有限公司 | Water stop belt installing method for large-scale sunken pipe |
CN104775449B (en) * | 2015-02-16 | 2017-01-11 | 中交四航局第二工程有限公司 | Water stop belt installing method for large-scale sunken pipe |
CN106337439B (en) * | 2015-07-31 | 2018-05-01 | 合肥工业大学 | The method that submerged floating tunnel underwater mating in water is realized using docking facilities |
CN106337439A (en) * | 2015-07-31 | 2017-01-18 | 合肥工业大学 | Method for achieving underwater butt joint of submerged floating tunnel through butt joint device |
CN107587522A (en) * | 2017-08-30 | 2018-01-16 | 中交公路规划设计院有限公司 | A kind of connection supports system and play movement support adjusting method |
CN107476342A (en) * | 2017-08-31 | 2017-12-15 | 上海振华重工(集团)股份有限公司 | A kind of immersed tube tunnel final joint pipe bending cylinder bearing installation method |
CN107476342B (en) * | 2017-08-31 | 2019-09-13 | 上海振华重工(集团)股份有限公司 | A kind of immersed tube tunnel final connector pipe bending cylinder support installation method |
CN107687181A (en) * | 2017-09-01 | 2018-02-13 | 中交第航务工程局有限公司 | FS final spice entirety fine adjustment method |
CN108316282A (en) * | 2017-12-29 | 2018-07-24 | 中国建筑第八工程局有限公司 | The piecing devices and its construction method of diaphram wall |
CN108360567A (en) * | 2018-01-25 | 2018-08-03 | 中铁二十三局集团有限公司 | The reversed construction method in precast assembly tunnel |
CN108411938A (en) * | 2018-01-25 | 2018-08-17 | 中铁二十三局集团建筑设计研究院有限公司 | A kind of precast assembly tunnel |
CN108360384A (en) * | 2018-02-28 | 2018-08-03 | 浙江省交通规划设计研究院 | Underway push construction method |
CN114293589A (en) * | 2022-01-28 | 2022-04-08 | 华中科技大学 | Intelligent waterproof and anti-seismic immersed tunnel pipe joint |
CN114293589B (en) * | 2022-01-28 | 2022-11-18 | 华中科技大学 | Intelligent waterproof and anti-seismic immersed tunnel pipe joint |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202865755U (en) | Immersed tunnel pipe joint axis positioning system | |
CN102776826B (en) | A kind of pavement concrete channel-section steel typified form | |
CN103173582A (en) | Method for integral in-position mounting of blast-furnace five-way ball and eduction tubes thereof aloft | |
CN204530761U (en) | A kind of tube coupling butt guiding devices | |
CN203374989U (en) | Groove type fixing device for pipeline | |
CN204252165U (en) | The artificial upper pipe working well of a kind of two way alternate | |
CN103994277B (en) | Circular top pipe deviation correcting regulation pipe | |
CN204912358U (en) | Aerogenerator flange ovality adjusting device | |
CN203449213U (en) | Pipe connector | |
CN104775526A (en) | Novel method for connecting steel bar and section steel column connector | |
CN102738758B (en) | A kind of cable expansion arc dog-ear device | |
CN202580351U (en) | Oil pipe assembly | |
CN103286742B (en) | Pipeline centering device | |
CN205600511U (en) | Anchor clamps of immersible pump casing processing | |
CN105773410A (en) | Fixture for machining of submersible pump housing | |
CN202927323U (en) | Rubber expansion joint | |
CN203880229U (en) | Correcting and adjusting pipe for circular jacking pipe | |
CN203471650U (en) | Assembling jig for mounting transfer case | |
CN207364004U (en) | Neutron oil hydraulic cylinder mounting structure | |
CN203023632U (en) | Non-excavation sensing-type jacking pipe for bridge construction | |
CN105155368B (en) | A kind of lash adjusting device of the magnetic-levitation section of track | |
CN205078916U (en) | Steel ring is used in push pipe construction with steel hoop | |
CN204877310U (en) | Machine of lifting is right stand pipe and is used this machine of lifting of rightting stand pipe | |
CN206539122U (en) | A kind of easy mounted-dismounted type foundation pit support device | |
CN204213000U (en) | Submerged Motor Pumps rapid installation device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20130410 |
|
CX01 | Expiry of patent term |