CN202849880U - A magnetic suspension track section measuring and adjusting system - Google Patents
A magnetic suspension track section measuring and adjusting system Download PDFInfo
- Publication number
- CN202849880U CN202849880U CN 201220115873 CN201220115873U CN202849880U CN 202849880 U CN202849880 U CN 202849880U CN 201220115873 CN201220115873 CN 201220115873 CN 201220115873 U CN201220115873 U CN 201220115873U CN 202849880 U CN202849880 U CN 202849880U
- Authority
- CN
- China
- Prior art keywords
- track
- section
- bolt
- adjusting
- track section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Machines For Laying And Maintaining Railways (AREA)
Abstract
Description
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220115873 CN202849880U (en) | 2012-03-26 | 2012-03-26 | A magnetic suspension track section measuring and adjusting system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220115873 CN202849880U (en) | 2012-03-26 | 2012-03-26 | A magnetic suspension track section measuring and adjusting system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202849880U true CN202849880U (en) | 2013-04-03 |
Family
ID=47981097
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220115873 Expired - Lifetime CN202849880U (en) | 2012-03-26 | 2012-03-26 | A magnetic suspension track section measuring and adjusting system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202849880U (en) |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105019320A (en) * | 2015-08-13 | 2015-11-04 | 中铁十一局集团有限公司 | Position control system and method for magnetic levitation track laying |
CN105155368A (en) * | 2015-09-11 | 2015-12-16 | 安徽兴宇轨道装备有限公司 | Gap adjustment device for track sections of magnetic levitation track |
CN105200877A (en) * | 2014-06-18 | 2015-12-30 | 系统7-铁路维护有限责任公司 | Railway track calibration system |
CN105484115A (en) * | 2015-11-23 | 2016-04-13 | 中铁十一局集团有限公司 | Quality detecting method and system for track panel |
CN105821726A (en) * | 2016-03-24 | 2016-08-03 | 上海市机械施工集团有限公司 | Position adjustment method for low-speed magnetic levitation track skeleton and track |
CN106590698A (en) * | 2017-01-23 | 2017-04-26 | 中冶焦耐(大连)工程技术有限公司 | Track foundation bracket accurate adjustment apparatus |
CN107142796A (en) * | 2017-07-19 | 2017-09-08 | 中铁局集团有限公司 | A kind of positioning tool installed for the type telescopic joints of medium-and low-speed maglev track J III |
WO2017215303A1 (en) * | 2016-06-12 | 2017-12-21 | 中铁第四勘察设计院集团有限公司 | Method for detecting assembling precision of medium-low speed maglev track panel |
CN110173270A (en) * | 2019-06-28 | 2019-08-27 | 晏强 | A kind of shield measurement total station hanging basket equipment |
CN110318308A (en) * | 2019-08-14 | 2019-10-11 | 中铁十一局集团第三工程有限公司 | A kind of complex ground magnetic floats section of track paving system and method |
CN110552260A (en) * | 2019-09-10 | 2019-12-10 | 中国铁建重工集团股份有限公司 | Method for manufacturing magnetic suspension track and track panel |
CN111497893A (en) * | 2020-04-17 | 2020-08-07 | 中建五局土木工程有限公司 | Track beam linear measuring system and method |
-
2012
- 2012-03-26 CN CN 201220115873 patent/CN202849880U/en not_active Expired - Lifetime
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105200877A (en) * | 2014-06-18 | 2015-12-30 | 系统7-铁路维护有限责任公司 | Railway track calibration system |
CN105200877B (en) * | 2014-06-18 | 2019-12-31 | Hp3真实有限责任公司 | Track calibration system |
CN105019320A (en) * | 2015-08-13 | 2015-11-04 | 中铁十一局集团有限公司 | Position control system and method for magnetic levitation track laying |
CN105155368A (en) * | 2015-09-11 | 2015-12-16 | 安徽兴宇轨道装备有限公司 | Gap adjustment device for track sections of magnetic levitation track |
CN105484115B (en) * | 2015-11-23 | 2018-02-13 | 中铁十一局集团有限公司 | The quality determining method and system of a kind of section of track |
CN105484115A (en) * | 2015-11-23 | 2016-04-13 | 中铁十一局集团有限公司 | Quality detecting method and system for track panel |
CN105821726A (en) * | 2016-03-24 | 2016-08-03 | 上海市机械施工集团有限公司 | Position adjustment method for low-speed magnetic levitation track skeleton and track |
WO2017215303A1 (en) * | 2016-06-12 | 2017-12-21 | 中铁第四勘察设计院集团有限公司 | Method for detecting assembling precision of medium-low speed maglev track panel |
CN106590698A (en) * | 2017-01-23 | 2017-04-26 | 中冶焦耐(大连)工程技术有限公司 | Track foundation bracket accurate adjustment apparatus |
CN107142796A (en) * | 2017-07-19 | 2017-09-08 | 中铁局集团有限公司 | A kind of positioning tool installed for the type telescopic joints of medium-and low-speed maglev track J III |
CN107142796B (en) * | 2017-07-19 | 2023-03-14 | 中铁一局集团有限公司 | Positioning tool for mounting J-III type expansion joint of medium-low speed magnetic levitation track |
CN110173270A (en) * | 2019-06-28 | 2019-08-27 | 晏强 | A kind of shield measurement total station hanging basket equipment |
CN110318308A (en) * | 2019-08-14 | 2019-10-11 | 中铁十一局集团第三工程有限公司 | A kind of complex ground magnetic floats section of track paving system and method |
CN110318308B (en) * | 2019-08-14 | 2024-02-20 | 中铁十一局集团第三工程有限公司 | System and method for paving magnetic levitation track panel in complex section |
CN110552260A (en) * | 2019-09-10 | 2019-12-10 | 中国铁建重工集团股份有限公司 | Method for manufacturing magnetic suspension track and track panel |
CN111497893A (en) * | 2020-04-17 | 2020-08-07 | 中建五局土木工程有限公司 | Track beam linear measuring system and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202849880U (en) | A magnetic suspension track section measuring and adjusting system | |
CN202031179U (en) | Centre line aligning and elevation adjusting device of basic embedded bolts | |
CN103174068A (en) | Straddle type single-rail traffic rigid frame system manufacturing construction method and linear control system | |
CN203440753U (en) | Multifunctional steel bar locating framework | |
CN103243621B (en) | Method for mounting integrated steel rail supporting frame for adjustment of groove type steel rails of tramcar | |
CN102912693B (en) | Floating track bed precast slab and construction method for precast slab assembled floating track bed | |
CN102680942A (en) | Blast furnace frame measuring positioning method based on total station | |
CN105821726A (en) | Position adjustment method for low-speed magnetic levitation track skeleton and track | |
CN103470003B (en) | A kind of intelligent super-large spliced plateform system | |
CN102287058A (en) | Method for installing and leveling large-plane high-precision embedded part | |
CN201224857Y (en) | Plate adjusting apparatus for measuring rail plate | |
CN105297561B (en) | Low speed magnetic suspension beam and its production method in prefabricated reinforced concrete | |
CN202509350U (en) | Three-dimensional adjusting device for installing and adjusting track panels of mid-low-speed maglev train track | |
CN105350407A (en) | Three-dimensional adjusting device for magnetic suspension track | |
CN219637592U (en) | Device for simulating integral ballast bed steel rail and measuring system | |
CN202099699U (en) | Elastic supporting vibration isolation component ballast bed | |
CN110241735B (en) | Positioning and adjusting device and method for main tower cable guide pipe of cable-stayed bridge | |
CN101428729B (en) | Connecting apparatus and mounting method for roof truss and suspension type travelling overhead crane rails | |
CN102587252A (en) | Wavy high-precision curve cement concrete pavement construction method | |
CN109505413A (en) | The movement of roofing truss system modular and installation method | |
CN102733270A (en) | Accurate adjusting frame of high-speed railway ballastless track plate | |
CN116590967A (en) | Method for controlling pushing connection precision of magnetic levitation turnout in overhead section | |
CN205077343U (en) | Magnetic levitation track's three -dimensional adjusting device | |
CN110470193B (en) | Method for monitoring relative displacement between box girder and pier | |
CN203583835U (en) | Intelligent ultra-large spliced platform system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Owner name: LAIWU IRON + STEEL GROUP CORP., LTD. Free format text: FORMER OWNER: JIANG DAIGENG Effective date: 20141102 |
|
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20141102 Address after: Friendship Street 271104 Shandong province Laiwu City Gangcheng District No. 38 Patentee after: Laiwu Iron & Steel Group Corp., Ltd. Address before: 271104 Shandong province Laiwu Steel Steel Street No. 2 Patentee before: Jiang Daigeng |
|
DD01 | Delivery of document by public notice |
Addressee: Yang Fudong Document name: Notification of Passing Examination on Formalities |
|
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20130403 |