CN202848881U - Space truss portal crane - Google Patents

Space truss portal crane Download PDF

Info

Publication number
CN202848881U
CN202848881U CN 201220551009 CN201220551009U CN202848881U CN 202848881 U CN202848881 U CN 202848881U CN 201220551009 CN201220551009 CN 201220551009 CN 201220551009 U CN201220551009 U CN 201220551009U CN 202848881 U CN202848881 U CN 202848881U
Authority
CN
China
Prior art keywords
steel
leading role
adjacent
prism
removable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220551009
Other languages
Chinese (zh)
Inventor
付进廷
李聚轩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Kerui Anbang Technology Co., Ltd.
Original Assignee
XINXIANG KERUI HEAVY MACHINERY TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XINXIANG KERUI HEAVY MACHINERY TECHNOLOGY Co Ltd filed Critical XINXIANG KERUI HEAVY MACHINERY TECHNOLOGY Co Ltd
Priority to CN 201220551009 priority Critical patent/CN202848881U/en
Application granted granted Critical
Publication of CN202848881U publication Critical patent/CN202848881U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a space truss portal crane. A main beam of the space truss portal crane is formed in a manner that basic units are pieced together, wherein the basic units comprise four main angle steels extending along the length direction of the main beam and occupying positions of four prisms of a regular square prism, the two adjacent basic units are correspondingly, detachably and fixedly pieced together through the main angle steels of the two adjacent basic units, a connecting rib is detachably fixed between one end of one of the two adjacent main angle steels and the other end of the other main angle steel of each basic unit on the side face of the regular square prism, straight lines where two adjacent connecting ribs on the optional side face of the regular square prism are located are intersected, support angle steels are detachably fixed at the outer end parts of the two main angle steels of the basic units located at the outer end of the on the optional side face of the regular square prism, and the support angle steels are detachably fixed between two piecing points of the main angle steel of the two adjacent basic units on the optional side face of the regular square prism. The space truss portal crane is in a spare part state before assembly, and is small in quality of the single part, strong in interchangeability and convenient for realizing lean manufacturing.

Description

The space truss transfer crane
Technical field
The utility model relates to a kind of transfer crane, and relating in particular to a kind of girder is by the assembled space truss transfer crane of a plurality of elementary cells, belongs to the elevator machinery field.
Background technology
Transfer crane of the prior art generally has the girder of horizontally set, is provided with leg in the two end supports of girder, and leg is used for girder is supported on the ground, and install on the ground the lower end of leg, and upper end and the girder of leg are fixed.The girder of transfer crane belongs to tall and slender structure, and suffered primary load comprises hang oneself its gravity, wind loading and the relevant dynamic load of weight of the gravity of self, girder, is in curved, as to press combination complicated applied force state.In order better to distribute internal force, to optimize structure, reduce wind loading, present girder generally all is to adopt truss structure.
Consider transportation and assembly unit requirement, the girder of present transfer crane is generally according to the standard cell design manufacturing, and the standard block of girder is the framed structure of rod member welding, and the height of standard block is more than 2m, and the length of side is generally also about 2m.Standard block single-unit quality is heavy, the standard block volume is large, the traffic requirements full size vehicle, and carrying needs elevator machinery, and on-the-spot bolt or the pin of using connects.
Existing transfer crane adopts welded structure, the single-piece quality is large, maintenance cost is high, in addition, the transfer crane standard block of different model and diversified in specifications, the type steel model that uses is also different, and the transfer crane of different model needs different manufacturing process and matching tooling, makes and organizes comparatively complexity.
Simultaneously, transfer crane standard block contour dimension is large, quality is large, and transportation is inconvenient with carrying, and transportation is high with landed cost.In the mountain area or the poor area of road engineering factor use and be restricted.
Secondly, the transfer crane standard block is welded structure, when the situation such as indivedual Deformation Member, damages occurring in transportation, carrying and use procedure, can only change whole unit, and maintenance cost is high.
Moreover the transfer crane standard block is welded structure, weld defect occurs easily, affects service life, has reduced and has repeated the number of times that assembly unit is used.Have emergentness because welding destroys, occur easily because member and weld fatigue destroy the safety misadventure that causes in use procedure.
Summary of the invention
The purpose of this utility model is to provide a kind of space truss transfer crane, take solve in the prior art because of the transfer crane standard block as welded structure in transportation, carrying and use procedure in case the situations such as indivedual Deformation Member, damages occur, just can only change whole unit, cause the high problem of maintenance cost.
For achieving the above object, the utility model adopts following technical scheme: a kind of space truss transfer crane, comprise girder, and the leg of the two end supports of girder setting, described girder is assembled by elementary cell, described elementary cell comprises that four of extending along the length direction of girder occupy leading role's steel of position of four ribs of four-prism, two adjacent elementary cells fixedly are bolted together by corresponding removable between both leading role's steel, the removable dowel that is fixed with between an end of one in adjacent two leading role's steel on the side of four-prism of each elementary cell and the other end of another root, be on any side of four-prism and the straight line at two adjacent dowel places intersects, be in the removable support angle steel that is fixed with in outer end of two leading role's steel on any side of four-prism of the elementary cell of outer end, the removable support angle steel that is fixed with between two splice point of the leading role's steel on arbitrary side of four-prism of two adjacent elementary cells.
Leading role's steel of per two adjacent elementary cells is removable fixing by four pairs of connecting panels respectively, two connecting panels of every pair of connecting panel are all mutually vertical and be on two adjacent sides of four-prism, two elementary cells are mutual corresponding two leading role's steel removable two ends that are fixed on a pair of connecting panel outside respectively in twos, the two ends of corresponding support angle steel are the removable inboard that is fixed on two connecting panels respectively, be in leading role's steel of elementary cell of outer end also by the four pairs of connecting panels and corresponding four removable fixing of support angle steel, be on the external end head of each leading role's steel of elementary cell of outer end and all be fixed with a pair of connecting panel, two terminations supporting angle steel that are in the outer end are separately fixed on two corresponding connecting panels.
All pass through bolts assemblies between described leading role's steel, support angle steel and dowel and the connecting panel.
Girder of the present utility model is assembled by elementary cell, and leading role's steel of elementary cell, dowel and the annexation that supports between the angle steel are removable fixing, it is little to that is to say that the utility model was loose mail single-piece quality before assembling, interchangeability is strong, be conducive to improve the manufacturing process standardization level, be convenient to realize the lean manufacturing.And if in transportation or use procedure, rod member occurs and damage, can change the plane framework maintenance by on-the-spot, reduce owing to become section to change a wasting of resources that causes, save service expenditure.And because single-piece quality and institute's duty are all less, can realize the transportation of Container Transport or containerization, can or lack in the situation of large-scale handling machinery in the transportation difficulty, rely on manually carry and assembly unit fully, save transportation and trucking expenses.
Description of drawings
Fig. 1 is front view of the present utility model;
Fig. 2 is the left view of Fig. 1;
Fig. 3 is in leading role's steel, the dowel on side of four-prism and the mounting structure scheme drawing that supports angle steel among Fig. 1;
Fig. 4 is the perspective view of standard knot of the present utility model.
The specific embodiment
A kind of embodiment of space truss transfer crane, in Fig. 1~4, the two ends of its girder 2 are respectively arranged with a leg 1, the upper end of leg 1 and girder 2 are fixing, the lower end of leg 1 fixedly is assemblied on the basis, ground, girder in the present embodiment is truss structure, and all is to be formed by the mode of multistage elementary cell by assembly unit.Elementary cell has four leading role's steel 3 that are parallel to each other, four leading role's steel 3 occupy respectively the position of four ribs of a four-prism, the bearing of trend of leading role's steel 3 is identical with the bearing of trend of its corresponding girder, two adjacent elementary cells are bolted together by the connection of the correspondence between both leading role's steel, also just say, leading role's steel of each elementary cell is corresponding the connection successively, is spliced into four rod members corresponding with girder that be parallel to each other.Leading role's steel 3 of two adjacent elementary cells is assembled together by four pairs of connecting panels 4, two fishplate bars in the every pair of connecting panel are all mutually vertical and be in two adjacent sides of four-prism, four pairs of connecting panels 4 are in respectively four junctions of leading role's steel of two adjacent elementary cells, and two mutual four corresponding leading role's steel of elementary cell are respectively by the removable two ends that are fixed on corresponding a pair of connecting panel 4 outsides of bolt.Be provided with four in the junction of two elementary cells and support angle steel 5, these four support angle steel are in respectively on arbitrary side of four-prism, and are connected between two splice point of four root leading role steel on the face that is in four-prism.Two ends of supporting angle steel 5 are separately positioned on two leading role's steel junctions on the side that two elementary cells are in four-prism, and the two ends of supporting angle steel 5 are bolted on respectively the inboard of corresponding two connecting panels 4.
The outer end of four leading role's steel 3 that is in the elementary cell of outer end is fixed with respectively a connecting panel 4, support and connection have the four support angle steel 5 of four sides on year that are in respectively four-prism between four connecting panels 4, four leading role's steel 3 that are in the elementary cell of outer end are fixed with the outside of corresponding two connecting panels 4 by bolt respectively, the corresponding two ends of supporting angle steel 5 are bolted with the inboard of two connecting panels 4 respectively, and four of junction that are in two adjacent standards support angle steel and surround a rectangle frame.
An elementary cell between two leading role's steel 3 on any side of four-prism, be connected with dowel 6, dowel 6 is Z-shaped with corresponding two leading role's steel, 3 formations, one end of dowel 6 is bolted on the connecting panel at corresponding leading role's steel 3 one end places, the other end of dowel 6 is bolted on the connecting panel at corresponding another root leading role steel 3 other end places, and dowel 6 is in corresponding leading role's steel with connecting panel and links to each other with supporting the part between the angle steel.Be on any side of four-prism and the straight line at dowel 6 places of two adjacent elementary cells intersects.
Leading role's steel in the present embodiment, support angle steel and dowel all are fixed together by bolt is removable, also can be fixed together by pin is removable.
The junction of the leading role's steel among this city embodiment, support angle steel and dowel all is provided with connecting panel, also can connecting panel be set, directly interconnects.

Claims (3)

1. space truss transfer crane, comprise girder, and the leg of the two end supports of girder setting, it is characterized in that: described girder is assembled by elementary cell, described elementary cell comprises that four of extending along the length direction of girder occupy leading role's steel of position of four ribs of four-prism, two adjacent elementary cells fixedly are bolted together by corresponding removable between both leading role's steel, the removable dowel that is fixed with between an end of one in adjacent two leading role's steel on the side of four-prism of each elementary cell and the other end of another root, be on any side of four-prism and the straight line at two adjacent dowel places intersects, be in the removable support angle steel that is fixed with in outer end of two leading role's steel on any side of four-prism of the elementary cell of outer end, the removable support angle steel that is fixed with between two splice point of the leading role's steel on arbitrary side of four-prism of two adjacent elementary cells.
2. space truss transfer crane according to claim 1, it is characterized in that: leading role's steel of per two adjacent elementary cells is removable fixing by four pairs of connecting panels respectively, two connecting panels of every pair of connecting panel are all mutually vertical and be on two adjacent sides of four-prism, two elementary cells are mutual corresponding two leading role's steel removable two ends that are fixed on a pair of connecting panel outside respectively in twos, the two ends of corresponding support angle steel are the removable inboard that is fixed on two connecting panels respectively, be in leading role's steel of elementary cell of outer end also by the four pairs of connecting panels and corresponding four removable fixing of support angle steel, be on the external end head of each leading role's steel of elementary cell of outer end and all be fixed with a pair of connecting panel, two terminations supporting angle steel that are in the outer end are separately fixed on two corresponding connecting panels.
3. space truss transfer crane according to claim 2 is characterized in that: all pass through bolts assemblies between described leading role's steel, support angle steel and dowel and the connecting panel.
CN 201220551009 2012-10-25 2012-10-25 Space truss portal crane Expired - Fee Related CN202848881U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220551009 CN202848881U (en) 2012-10-25 2012-10-25 Space truss portal crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220551009 CN202848881U (en) 2012-10-25 2012-10-25 Space truss portal crane

Publications (1)

Publication Number Publication Date
CN202848881U true CN202848881U (en) 2013-04-03

Family

ID=47980101

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220551009 Expired - Fee Related CN202848881U (en) 2012-10-25 2012-10-25 Space truss portal crane

Country Status (1)

Country Link
CN (1) CN202848881U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107082364A (en) * 2017-05-10 2017-08-22 河南新科起重机股份有限公司 Crane beam and crane
CN111017758A (en) * 2019-12-24 2020-04-17 浙江浙建钢结构有限公司 Building construction hoist and mount frame that reliability is high

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107082364A (en) * 2017-05-10 2017-08-22 河南新科起重机股份有限公司 Crane beam and crane
CN111017758A (en) * 2019-12-24 2020-04-17 浙江浙建钢结构有限公司 Building construction hoist and mount frame that reliability is high

Similar Documents

Publication Publication Date Title
CN105932191A (en) Battery fixing device and electric vehicle
CN202848923U (en) Space truss tower crane convenient to maintain
CN202848881U (en) Space truss portal crane
CN203995669U (en) A kind of 8 bottles of steel bottle filled with compressed natural gas fixed support assemblies
CN202864744U (en) Space truss type tower crane
CN202913357U (en) Conveniently maintained space truss bridge erecting machine
CN203021207U (en) Large-load multifunctional gantry crane capable of being flexibly spliced
CN202704880U (en) Plane truss tower crane
CN202848922U (en) Space truss tower crane
CN202848879U (en) Space truss type portal crane
CN202575714U (en) Plane truss portal crane
CN202912594U (en) Tower crane
CN202848880U (en) Space truss portal crane convenient to maintain
CN202849953U (en) Space trussed type bridge girder erection machine
CN202687784U (en) Planar truss type gantry crane
CN204198300U (en) Ultra-large type tower machine assembling standard knot structure
CN202704834U (en) Portal crane with plane truss
CN102561195B (en) Assembled wire strand bracket
CN202718041U (en) Plane truss bridge girder erection machine
CN215751868U (en) Battery mounting frame
CN202687812U (en) Tower crane
CN210365423U (en) Trestle support with light steel structure
CN202849946U (en) Bridge girder erection machine of space truss
CN202687786U (en) Portal crane convenient to maintain
CN202575715U (en) Gantry crane

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: BEIJING KERUI ANBANG TECHNOLOGY CO., LTD.

Free format text: FORMER OWNER: XINXIANG KERUI HEAVY MACHINERY TECHNOLOGY CO., LTD.

Effective date: 20150104

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 453400 XINXIANG, HENAN PROVINCE TO: 100000 SHIJINGSHAN, BEIJING

TR01 Transfer of patent right

Effective date of registration: 20150104

Address after: 100000, No. 8, building 30, Shijingshan District Hing Street, Beijing

Patentee after: Beijing Kerui Anbang Technology Co., Ltd.

Address before: The western part of Changyuan County, Xinxiang City People's road 453400 in Henan Province

Patentee before: Xinxiang Kerui Heavy Machinery Technology Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130403

Termination date: 20151025

EXPY Termination of patent right or utility model