CN202832564U - Large-section tunnel lining trolley - Google Patents

Large-section tunnel lining trolley Download PDF

Info

Publication number
CN202832564U
CN202832564U CN2012204412539U CN201220441253U CN202832564U CN 202832564 U CN202832564 U CN 202832564U CN 2012204412539 U CN2012204412539 U CN 2012204412539U CN 201220441253 U CN201220441253 U CN 201220441253U CN 202832564 U CN202832564 U CN 202832564U
Authority
CN
China
Prior art keywords
side wall
concrete
small side
construction
arch ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012204412539U
Other languages
Chinese (zh)
Inventor
穆建廷
孙炜
雷军
任晓琴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Original Assignee
Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd filed Critical Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Priority to CN2012204412539U priority Critical patent/CN202832564U/en
Application granted granted Critical
Publication of CN202832564U publication Critical patent/CN202832564U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model relates to tunnel construction machinery, in particular to a large-section tunnel lining trolley, and solves the problems that during existing tunnel lining construction, small side wall construction and arch ring concrete construction are respectively conducted, tunnel concrete structural integrity is influenced, and engineering cost is increased. The large-section tunnel lining trolley comprises a trolley body and an arch ring template, wherein the arch ring template is installed on the periphery of the trolley body through first adjustment lead screws. The arch ring template comprises a top mould and two side moulds which are connected with the top mould in a hinged mode, the lower ends of the two side moulds are respectively hinged with a small side wall curved mould, a second adjustment lead screw is installed between each small side wall curved mould and the trolley body, the tail end of each small side wall curved mould is provided with a grounding adjustment lead screw, and a guide chain is installed on each small side wall curved mould. A small side wall concrete process during construction is eliminated, connection steel bars used for connection of small side wall concrete and arch ring concrete are eliminated, labor costs and material costs are saved, the phenomenon of 'broken wall corners' is eliminated fundamentally, lining concrete quality is improved, and good economic benefits and social benefits are obtained.

Description

The large cross-section tunnel lining trolley
Technical field
The utility model relates to a kind of tunnel construction machinery, is specially a kind of large cross-section tunnel lining trolley.
Background technology
In recent years, along with the development of China railways economic construction, the continuous acceleration of urbanization process in continuous increase, a large amount of construction of tunnel occur, and scale is increasing to the demand of infrastructure, especially Transport Facility Construction.At present, in the large cross-section tunnel engineering, adopt lining template trolley for baffle to construct more, generally comprise chassis and template revenue and expenditure system and operating platform in the chassis arch template, trolley formwork, wherein the chassis arch template is by backform and two side templates are hinged forms.During lining construction, lay first little abutment wall part splash guard, apply again little side wall concrete, little abutment wall and arch ring are concrete to be connected in order to strengthen, and pre-buried Φ 22 connects a batch indented bars at little abutment wall top, re-lays at last the arch ring splash guard, after lining trolley is in place, build the arch ring concrete.This construction technology is because have vertical constuction joint at little abutment wall between the arch ring concrete, thereby affected the globality of tunnel concrete structure, thereby increase labour cost because apply this procedure of little abutment wall in addition, be connected batch reinforcing bar that connects that arranges with the arch ring concrete and increased cost of materials for strengthening little side wall concrete.In sum, traditional lining construction technique and lining trolley not only have larger harm to the globality of tunnel concrete structure, and have increased engineering cost.
Summary of the invention
The utility model little abutment wall construction and arch ring concrete construction when solving the existing tunnel lining construction are carried out respectively, are produced constuction joint, affect the tunnel concrete structural integrity and increase the problem of engineering cost, and a kind of large cross-section tunnel lining trolley is provided.
The utility model is to adopt following technical scheme to realize: the large cross-section tunnel lining trolley, comprise the chassis main body, be installed in the arch template of chassis main body periphery by the first adjusting screw, arch template comprises backform and two side forms hinged with backform, innovative point of the present utility model is to be hinged with respectively little abutment wall Qu Mo two side form lower ends; be provided with the second adjusting screw between little abutment wall Qu Mo and the chassis main body, and the bent mould end of little abutment wall is provided with over the ground adjusting screw.Adopt structure design of the present utility model, increase by a little abutment wall Qu Mo at former little abutment wall place, consist of full section punching block, and through Force Calculation, after increasing little abutment wall Qu Mo the lining trolley stressing conditions is affected also not quite, the intensity of lining trolley, rigidity and stability can satisfy the large section concrete construction requirement of railway of passengers' private line tunnel fully.
Described little abutment wall Qu Mo is provided with guide chain, when the lining trolley demoulding, with guide chain the bent die drawing of little abutment wall is risen first, and then takes off arch template.
Compared with prior art, when adopting described lining trolley of the present utility model to construct, cancel this procedure of little side wall concrete of constructing and reached as little side wall concrete is connected batch reinforcing bar that connects that arranges with the arch ring concrete, greatly saved labour cost and material cost expense; Cancelled little abutment wall because of lining cutting in addition, thereby fundamentally stopped the appearance of " mashed corner " phenomenon, the quality of lining concrete is greatly improved, and has obtained good economic benefit and social benefit.
Description of drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the partial enlarged drawing of A section among Fig. 1;
Among the figure: 1-chassis main body; 2-the first adjusting screw; The 3-backform; The 4-side form; The little abutment wall Qu Mo of 5-; 6-the second adjusting screw; 7-is adjusting screw over the ground; The 8-guide chain.
The specific embodiment
The large cross-section tunnel lining trolley, as shown in Figure 1, comprise chassis main body 1, be installed in the arch template of chassis main body periphery by the first adjusting screw 2, arch template comprises backform 3 and two side forms 4 hinged with backform, be hinged with respectively the bent mould 5 of little abutment wall two side form 4 lower ends, as shown in Figure 2, be provided with the second adjusting screw 6 between little abutment wall Qu Mo and the chassis main body; the bent mould end of little abutment wall is provided with over the ground adjusting screw 7, the bent mould 5 of little abutment wall is provided with guide chain 8.
During construction, add man-hour in the lining trolley template, process a little abutment wall Qu Mo by design size, little abutment wall Qu Mo and arch template are hinged, during the lining trolley demoulding, with guide chain the bent die drawing of little abutment wall are risen first, and then take off arch template.
Case history:
Project profile: tunnel, Jinzhai County and correlation engineering thereof be newly-built Hefei to the part of Wuhan Railway, the bid section mileage is DK148+630~DK160+725,12.093 kilometers of main track total lengths.Tunnel, Jinzhai County is one of all fronts Control Engineering, also is the heavy difficult point engineering of this bid section, the beginning and the end mileage DK149+959~DK160+725, and total length 10766m, 350 meters of the maximum buried depths of barrel, the minimum depth 32m, longitudinal gradient is established 4.34 ‰ single slope upward slopes in the tunnel.Tunnel, Jinzhai County inclined shaft and Zheng Dong intersect at the DK154+380 place, with tunnel little mileage direction angle of cut 45o, and 482.24 meters of total lengths, the comprehensive gradient 9.30%, inclined shaft adopts the two-way traffic section, adopts the oblique twin to intersect with positive hole.
Jinzhai County's tunnel lining trolley template length is 10.5m, every plate lining cutting length of on average constructing is 10.4m, every plate lining cutting applies little abutment wall and needs artificial 10 work days; little side wall concrete and arch ring concrete joint stubble reinforcing bar adopt Φ 22 screw-thread steels of L=1m; longitudinal pitch 0.5m; every plate lining cutting need meet batch reinforcing bar 42 m, meter 125.16kg.
Tunnel, Jinzhai County total length 10766m applies little side wall concrete and needs labour cost:
10 the work day * (10766m ÷ 10.4m)=10352 work days
10352 work day * 25.8 yuan/work day=267081.6 yuan
The required batch reinforcing bar cost of materials that connects of little side wall concrete and arch ring concrete:
125.16kg×(10766m÷10.4m)=129564.7?kg
129564.7 1000 * 4100 yuan/t of kg ÷=531215.3 yuan
Conventional tunnel lining construction technique need increase cost:
267081.6+531215.3=798296.9 yuan
Can be found out by above analysis, adopt lining trolley described in the utility model to construct, can save 267081.6 yuan of labour costs, save 531215.3 yuan of cost of materials, add up to 798296.9 yuan of reduce project costs, obtained good economic results in society,, be subject to the favorable comment of owner, design, supervisor.

Claims (2)

1. large cross-section tunnel lining trolley, comprise chassis main body (1), be installed in the arch template of chassis main body periphery by the first adjusting screw (2), arch template comprises backform (3) and two side forms (4) hinged with backform, it is characterized in that being hinged with respectively little abutment wall Qu Mo (5) in two side forms (4) lower end; be provided with the second adjusting screw (6) between little abutment wall Qu Mo and the chassis main body, the bent mould end of little abutment wall is provided with over the ground adjusting screw (7).
2. large cross-section tunnel lining trolley according to claim 1 is characterized in that little abutment wall Qu Mo (5) is provided with guide chain (8).
CN2012204412539U 2012-09-02 2012-09-02 Large-section tunnel lining trolley Expired - Fee Related CN202832564U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012204412539U CN202832564U (en) 2012-09-02 2012-09-02 Large-section tunnel lining trolley

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012204412539U CN202832564U (en) 2012-09-02 2012-09-02 Large-section tunnel lining trolley

Publications (1)

Publication Number Publication Date
CN202832564U true CN202832564U (en) 2013-03-27

Family

ID=47944296

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012204412539U Expired - Fee Related CN202832564U (en) 2012-09-02 2012-09-02 Large-section tunnel lining trolley

Country Status (1)

Country Link
CN (1) CN202832564U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104389622A (en) * 2014-09-26 2015-03-04 甘肃万泰建设工程有限公司 Construction method of arched steel lifting molds of tunnel secondary lining arch foot curved wall

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104389622A (en) * 2014-09-26 2015-03-04 甘肃万泰建设工程有限公司 Construction method of arched steel lifting molds of tunnel secondary lining arch foot curved wall

Similar Documents

Publication Publication Date Title
CN101230785B (en) Construction method for large section and multiple sections tunnel lining
CN103032078B (en) Parallel construction method for shield arrival tunnel portal ring beam and shield crossing station
CN102345461B (en) Subsequent project and shield driving parallel construction method for long-distance railway tunnel
CN104564102B (en) A kind of tunnel lining concrete grouting device
CN206873792U (en) A kind of assembled staircase structure
CN203476349U (en) One-time forming lining trolley for tunnel ventilation inclined shaft
CN102704948A (en) Formworking jumbo construction process for long and large box culvert
CN111911194A (en) Multifunctional two-lining trolley construction equipment and method for long and wide tunnel
CN203948107U (en) Whole self-propelled formula hydraulic lining trolley
CN103233424A (en) Hanging-basket-method support-free anti-collision wall construction method, construction hanging basket and template for construction
CN109518544A (en) A kind of subway precast track plate railway roadbed laying method
CN205364148U (en) PC track beam mold
CN203200656U (en) Light corrugated steel-high strength reactive powder concrete combined bridge deck slab
CN106638183A (en) Urban rail transit assembly board type high precision rail base cast-in-place construction method
CN203174510U (en) Movable assembly type hanging basket for bridge anti-collision guardrail construction and formwork for construction
CN202659247U (en) Back templates and combined steel die for tunnel inverted arch construction
CN203248170U (en) Lining trolley for secondary lining construction of pedestrian crosswalk
CN202832564U (en) Large-section tunnel lining trolley
CN204662270U (en) A kind of case girder transferring system
CN204267046U (en) A kind of tunnel lining concrete grouting device
CN102561117B (en) Logistical method for conveying ballastless tracks in twin-track tunnel in construction
CN209066480U (en) A kind of precast hollow module block type concrete retaining wall
CN202148694U (en) Prefabricated T-shaped beam steel bar colligation positioning device
CN205348214U (en) Column formula reinforced concrete and shaped steel hybrid portal crane basis
CN206374017U (en) It is a kind of to fix linear cross-saddle single-track traffic pre-track beam forms system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130327

Termination date: 20200902

CF01 Termination of patent right due to non-payment of annual fee