CN202831762U - Self-pulling and self-locking separated combination type hoop - Google Patents

Self-pulling and self-locking separated combination type hoop Download PDF

Info

Publication number
CN202831762U
CN202831762U CN 201220430957 CN201220430957U CN202831762U CN 202831762 U CN202831762 U CN 202831762U CN 201220430957 CN201220430957 CN 201220430957 CN 201220430957 U CN201220430957 U CN 201220430957U CN 202831762 U CN202831762 U CN 202831762U
Authority
CN
China
Prior art keywords
self
pulling
hoop
bar
combination type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220430957
Other languages
Chinese (zh)
Inventor
侍嘉庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi Pingxiang Power Supply Co Ltd
Original Assignee
Jiangxi Pingxiang Power Supply Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangxi Pingxiang Power Supply Co Ltd filed Critical Jiangxi Pingxiang Power Supply Co Ltd
Priority to CN 201220430957 priority Critical patent/CN202831762U/en
Application granted granted Critical
Publication of CN202831762U publication Critical patent/CN202831762U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The utility model discloses a self-pulling and self-locking separated combination type hoop which comprises support plates (3), drawplates (7), U-shaped rings (6) and a hoop plate (2). The support plates are arranged at intervals, two ends of the support plates are perpendicular to each other, the drawplates are movably arranged between one ends of two adjacent support plates, the U-shaped rings are in movable connection with the upper ends of the drawplates, hoop bodies are fixedly arranged at the lower ends of the drawplates, and the U-shaped rings are connected with one ends of draw wires. The self-pulling and self-locking separated combination type hoop can avoid longitudinal or transverse cracks of a concrete pole and falling and breakage of the concrete pole in power transmission, and not only can ensure normal power transmission and reduce power transmission cost, but also can avoid power safety accidents. The self-pulling and self-locking separated combination type hoop is compact in structure, convenient to disassemble, carry, use and maintain, durable and strong in reliability.

Description

From drawing self-locking burst Combined anchor ear
Technical field
The utility model relate to concrete bar in the line sending road that prevents from transmitting electricity topple over and rupture certainly draw self-locking burst Combined anchor ear.
Background technology
Steel concrete concrete bar is the most frequently used electric pole during electric power is carried, particularly in the high pressure transmission line of electricity, not only transmission line of electricity is long for it, and usually to cross over the mountain ridge, river and field, because impact and the restriction of construction and geology, cause some concrete bar embedded depth of foundation inadequate, root basis and backguy are insecure, the concrete bar is subjected to pulling force and external environment condition function influence, easily produce vertical or horizontal crackle, cause the coarse stone bar that bar occurs, the situation of disconnected bar etc., not only can cause electric power to carry interrupts, the conveying cost that increases electric power, impact are produced and life, and can produce the electric power safety accident.
The utility model content
For the problem that concrete bar in the above-mentioned prior art easily produces bar, the bar that breaks brings, the utility model provides a kind of concrete bar that can not make to produce vertical or horizontal crackle, can prevent effectively that the concrete bar from falling bar and disconnected bar, guarantee that electric power carries normal from drawing self-locking burst Combined anchor ear.
The technical scheme that the technical problems to be solved in the utility model is taked is: described from drawing self-locking burst Combined anchor ear to comprise gripper shoe, strain plate, U-loop and hoop plate, described gripper shoe interval arranges, described gripper shoe two ends are mutually vertical, between the adjacent end of two gripper shoes, be movably set with strain plate with screw shaft, described strain plate movable upper end is connected with U-loop, the strain plate lower end is provided with anchor ear, and U-loop links to each other with backguy one end.
When simultaneously downward fastening backguy, the strain plate rotation moves inward anchor ear to hold tightly the concrete bar fixing simultaneously.
The utility model is applicable to 10KV-220KV and does not use with the steel concrete concrete bar of climbing nail, and its installation instructions using method is:
1) device checks: need check the anchor ear device outward appearance using, confirm each position especially connecting portion without damaged, without heavy wear and corrosion situation,
2) check before the bar: step on the bar operating personnel and must determine before operation whether concrete pole-footing section and backguy be firm, stringing band stressing conditions and abrasion condition etc. are determined the easy breakpoint of concrete bar,
3) two staff are enclosed within concrete pole-footing section with U-shaped ring, strain plate, gripper shoe with bolton together, and U-shaped ring is passed in 4 backguys,
4) other 4 staff are mutually 90 degree angle directions according to four of topography and geomorphology selections and lay anchoring pile.Solid soil is selected in the anchoring pile place as far as possible, and anchoring pile should become with ground 45 degree to squeeze in the soil, and the degree of depth is not less than 1 meter, in case of necessity can the stake of the company of employing etc. mode increase anchoring pile,
5) with four backguy one ends fixedly on the anchoring pile, two staff stand in the places of symmetry direction beyond 50 centimeters of the electric poles, with the strut jack-up anchor ear device that is equipped with,
6) whether four of the anchoring pile place staff's finder lifting heights put in place, slowly discharge wire rope along with anchor ear device rises, and guarantee that anchor ear steadily rises to the target location,
7) in the reason hoop device uphill process, the operating personnel forbids standing in might the break direction of bar of concrete bar,
8) so anchor ear device must rise to more than the easily broken knick point of concrete bar, generally highly be advisable more than 2/3 with the concrete bar, otherwise can't play protective action,
9) reach behind the target location should the maintenance level for device, cubic backguy should be simultaneously even slow stringing, guarantee hoop bar force balance,
10) when cubic backguy begin stressed after, two personnel unclamp strut under the bar, leave concrete pole-footing section, cubic backguy continues evenly slowly stringing, after obvious tension force is born in backguy, and device is fixing, namely stops; Such as device loosening phenomenon is arranged, should re-start adjustment,
11) in the cubic backguy stringing process, prevent concrete bar discontinuity, disconnected bar phenomenon occurs,
10) step in the bar operation process four necessary rear personnels in anchoring pile place, the fixing situation of supervision anchoring pile the maintainer.As it is stressed excessive and cause mobile situation to find that anchoring pile has, and should stop immediately working on the bar, and the operating personnel is lower beam immediately, again reinforces rear upper boom until anchoring pile,
11) work is complete, on the bar behind the whole lower beams of operating personnel, and can detaching device.Unloading process is opposite with installation process, and two staff are on symmetry direction, and device is withstood with strut in the place that stands in outside 50 centimeters of electric poles, and cubic backguy is evenly slowly loosened simultaneously.Device slow decreasing under the effect of strut arrives ground,
12) in complete, the unloading process of device dismounting, cubic backguy is forbidden to unclamp suddenly,
13) stripping device checks whether component are excellent, and if any breakage, timely and manufacturer contacts replacing, can not arbitrarily change voluntarily.
The utility model can prevent that the concrete bar from producing vertical or horizontal crackle, makes in the transmission line of electricity concrete bar not fall bar, disconnected bar, can not only guarantee that electric power carries normally, reduces electric power and carries cost, and can prevent that the electric power safety accident from occuring.The utility model compact conformation, dismounting, carry, operation and maintenance is convenient, durable reliability is strong.
Description of drawings
Fig. 1 is plan structure schematic diagram of the present utility model,
Fig. 2 is main TV structure schematic diagram of the present utility model.
In the drawings, 1, concrete bar 2, hoop plate 3, gripper shoe 4, screw shaft 5, pin 6, U-loop 7, strain plate 8, hinge cover 9, backguy.
The specific embodiment
In Fig. 1 and Fig. 2, described from drawing self-locking burst Combined anchor ear to be installed in the concrete bar from bottom to up more than 2/3rds places, it comprises gripper shoe 3, strain plate 7, U-loop 6 and hoop plate 2, described gripper shoe 3 two ends are plane and mutually vertical, be herringbone in the middle of the gripper shoe, described gripper shoe is that four block gaps arrange the approximate octagon of formation, between adjacent two gripper shoes, one end, be provided with strain plate 7, described strain plate is four, its middle part all is movably connected with gripper shoe with screw shaft 4 and hinge cover 8, described strain plate upper end is connected with U-loop 6 with pin 5, the strain plate lower end is fixedly linked with pin and anchor ear 2 one ends, described four anchor ear other ends rise can hold fixedly concrete bar 1 tightly, described U-loop links to each other with backguy 9 one ends, when simultaneously fastening four backguys downwards, strain plate rotates simultaneously and anchor ear is moved inward simultaneously the concrete bar is held tightly fixing, and the backguy other end is fixed in the stratum by anchoring pile.Described U-loop and screw shaft and pin are made of a steel, and other pieces are made with the aviation aluminium.Certainly also available three gripper shoe spaces arrange and form approximate six corner shapes.

Claims (1)

1. certainly draw self-locking burst Combined anchor ear, it comprises gripper shoe (3), strain plate (7), U-loop (6) and hoop plate (2), it is characterized in that: described gripper shoe interval arranges, described gripper shoe two ends are mutually vertical, between the adjacent end of two gripper shoes, be movably set with strain plate with screw shaft (4), described strain plate movable upper end is connected with U-loop, the strain plate lower end is provided with anchor ear, and described U-loop links to each other with backguy (9) one ends.
CN 201220430957 2012-08-29 2012-08-29 Self-pulling and self-locking separated combination type hoop Expired - Fee Related CN202831762U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220430957 CN202831762U (en) 2012-08-29 2012-08-29 Self-pulling and self-locking separated combination type hoop

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220430957 CN202831762U (en) 2012-08-29 2012-08-29 Self-pulling and self-locking separated combination type hoop

Publications (1)

Publication Number Publication Date
CN202831762U true CN202831762U (en) 2013-03-27

Family

ID=47943505

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220430957 Expired - Fee Related CN202831762U (en) 2012-08-29 2012-08-29 Self-pulling and self-locking separated combination type hoop

Country Status (1)

Country Link
CN (1) CN202831762U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104283152A (en) * 2014-10-08 2015-01-14 国家电网公司 Self-lifting rotary insulation cage
CN104456452A (en) * 2013-09-12 2015-03-25 海洋王(东莞)照明科技有限公司 Hoop component

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104456452A (en) * 2013-09-12 2015-03-25 海洋王(东莞)照明科技有限公司 Hoop component
CN104456452B (en) * 2013-09-12 2019-06-07 海洋王(东莞)照明科技有限公司 Hoop component
CN104283152A (en) * 2014-10-08 2015-01-14 国家电网公司 Self-lifting rotary insulation cage

Similar Documents

Publication Publication Date Title
CN204370830U (en) A kind of electric pole centralizer
CN202416183U (en) Bent cap collar-clamp type cast support
CN104179365B (en) Overall steel tower displacement constructional method
CN105186378A (en) Power transmission line channel crossing protection mechanism
CN205000721U (en) Flange switching communication tower
CN202831762U (en) Self-pulling and self-locking separated combination type hoop
CN105586832A (en) Suspension type catwalk surface net mounting system
CN110029861A (en) A kind of signal tower suitable for mountainous region
CN201102883Y (en) Steel cable sliding and lifting device
CN204457043U (en) A kind of anti-reversing device
CN217839669U (en) But roof beam support is prevented falling in height-adjusting's intelligence dynamometry shock attenuation
CN203977421U (en) Line of power dish
CN106368236B (en) Device and method for self-adaptively adjusting foundation of goaf
CN104314354A (en) High-voltage electric tower base
CN111894049A (en) Loading device and test equipment for foundation pile compression-resistant static load test
CN209011132U (en) A kind of fixed foundation pit berm structure of assembled two point
CN201459612U (en) Squirrel-cage repairing device for bridge stay cable
CN202882002U (en) Earth moving device used in deep foundation pit excavation
CN208183816U (en) A kind of default section support pile experimental rig for simulating different bending strengths
CN105113426A (en) Cable connector and steel truss arch bridge cable connecting method
CN204778228U (en) Driving sheave protection casing
CN202519590U (en) Top mounting small hanging basket
CN110359756A (en) 750kV booster stations framework installation method
CN215626613U (en) Lifting device for bridge tunnel maintenance
CN213329138U (en) Loading device and test equipment for foundation pile pulling-resistant static load test

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130327

Termination date: 20130829