CN202831762U - Self-pulling and self-locking separated combination type hoop - Google Patents
Self-pulling and self-locking separated combination type hoop Download PDFInfo
- Publication number
- CN202831762U CN202831762U CN 201220430957 CN201220430957U CN202831762U CN 202831762 U CN202831762 U CN 202831762U CN 201220430957 CN201220430957 CN 201220430957 CN 201220430957 U CN201220430957 U CN 201220430957U CN 202831762 U CN202831762 U CN 202831762U
- Authority
- CN
- China
- Prior art keywords
- self
- pulling
- hoop
- bar
- combination type
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Electric Cable Installation (AREA)
Abstract
The utility model discloses a self-pulling and self-locking separated combination type hoop which comprises support plates (3), drawplates (7), U-shaped rings (6) and a hoop plate (2). The support plates are arranged at intervals, two ends of the support plates are perpendicular to each other, the drawplates are movably arranged between one ends of two adjacent support plates, the U-shaped rings are in movable connection with the upper ends of the drawplates, hoop bodies are fixedly arranged at the lower ends of the drawplates, and the U-shaped rings are connected with one ends of draw wires. The self-pulling and self-locking separated combination type hoop can avoid longitudinal or transverse cracks of a concrete pole and falling and breakage of the concrete pole in power transmission, and not only can ensure normal power transmission and reduce power transmission cost, but also can avoid power safety accidents. The self-pulling and self-locking separated combination type hoop is compact in structure, convenient to disassemble, carry, use and maintain, durable and strong in reliability.
Description
Technical field
The utility model relate to concrete bar in the line sending road that prevents from transmitting electricity topple over and rupture certainly draw self-locking burst Combined anchor ear.
Background technology
Steel concrete concrete bar is the most frequently used electric pole during electric power is carried, particularly in the high pressure transmission line of electricity, not only transmission line of electricity is long for it, and usually to cross over the mountain ridge, river and field, because impact and the restriction of construction and geology, cause some concrete bar embedded depth of foundation inadequate, root basis and backguy are insecure, the concrete bar is subjected to pulling force and external environment condition function influence, easily produce vertical or horizontal crackle, cause the coarse stone bar that bar occurs, the situation of disconnected bar etc., not only can cause electric power to carry interrupts, the conveying cost that increases electric power, impact are produced and life, and can produce the electric power safety accident.
The utility model content
For the problem that concrete bar in the above-mentioned prior art easily produces bar, the bar that breaks brings, the utility model provides a kind of concrete bar that can not make to produce vertical or horizontal crackle, can prevent effectively that the concrete bar from falling bar and disconnected bar, guarantee that electric power carries normal from drawing self-locking burst Combined anchor ear.
The technical scheme that the technical problems to be solved in the utility model is taked is: described from drawing self-locking burst Combined anchor ear to comprise gripper shoe, strain plate, U-loop and hoop plate, described gripper shoe interval arranges, described gripper shoe two ends are mutually vertical, between the adjacent end of two gripper shoes, be movably set with strain plate with screw shaft, described strain plate movable upper end is connected with U-loop, the strain plate lower end is provided with anchor ear, and U-loop links to each other with backguy one end.
When simultaneously downward fastening backguy, the strain plate rotation moves inward anchor ear to hold tightly the concrete bar fixing simultaneously.
The utility model is applicable to 10KV-220KV and does not use with the steel concrete concrete bar of climbing nail, and its installation instructions using method is:
1) device checks: need check the anchor ear device outward appearance using, confirm each position especially connecting portion without damaged, without heavy wear and corrosion situation,
2) check before the bar: step on the bar operating personnel and must determine before operation whether concrete pole-footing section and backguy be firm, stringing band stressing conditions and abrasion condition etc. are determined the easy breakpoint of concrete bar,
3) two staff are enclosed within concrete pole-footing section with U-shaped ring, strain plate, gripper shoe with bolton together, and U-shaped ring is passed in 4 backguys,
4) other 4 staff are mutually 90 degree angle directions according to four of topography and geomorphology selections and lay anchoring pile.Solid soil is selected in the anchoring pile place as far as possible, and anchoring pile should become with ground 45 degree to squeeze in the soil, and the degree of depth is not less than 1 meter, in case of necessity can the stake of the company of employing etc. mode increase anchoring pile,
5) with four backguy one ends fixedly on the anchoring pile, two staff stand in the places of symmetry direction beyond 50 centimeters of the electric poles, with the strut jack-up anchor ear device that is equipped with,
6) whether four of the anchoring pile place staff's finder lifting heights put in place, slowly discharge wire rope along with anchor ear device rises, and guarantee that anchor ear steadily rises to the target location,
7) in the reason hoop device uphill process, the operating personnel forbids standing in might the break direction of bar of concrete bar,
8) so anchor ear device must rise to more than the easily broken knick point of concrete bar, generally highly be advisable more than 2/3 with the concrete bar, otherwise can't play protective action,
9) reach behind the target location should the maintenance level for device, cubic backguy should be simultaneously even slow stringing, guarantee hoop bar force balance,
10) when cubic backguy begin stressed after, two personnel unclamp strut under the bar, leave concrete pole-footing section, cubic backguy continues evenly slowly stringing, after obvious tension force is born in backguy, and device is fixing, namely stops; Such as device loosening phenomenon is arranged, should re-start adjustment,
11) in the cubic backguy stringing process, prevent concrete bar discontinuity, disconnected bar phenomenon occurs,
10) step in the bar operation process four necessary rear personnels in anchoring pile place, the fixing situation of supervision anchoring pile the maintainer.As it is stressed excessive and cause mobile situation to find that anchoring pile has, and should stop immediately working on the bar, and the operating personnel is lower beam immediately, again reinforces rear upper boom until anchoring pile,
11) work is complete, on the bar behind the whole lower beams of operating personnel, and can detaching device.Unloading process is opposite with installation process, and two staff are on symmetry direction, and device is withstood with strut in the place that stands in outside 50 centimeters of electric poles, and cubic backguy is evenly slowly loosened simultaneously.Device slow decreasing under the effect of strut arrives ground,
12) in complete, the unloading process of device dismounting, cubic backguy is forbidden to unclamp suddenly,
13) stripping device checks whether component are excellent, and if any breakage, timely and manufacturer contacts replacing, can not arbitrarily change voluntarily.
The utility model can prevent that the concrete bar from producing vertical or horizontal crackle, makes in the transmission line of electricity concrete bar not fall bar, disconnected bar, can not only guarantee that electric power carries normally, reduces electric power and carries cost, and can prevent that the electric power safety accident from occuring.The utility model compact conformation, dismounting, carry, operation and maintenance is convenient, durable reliability is strong.
Description of drawings
Fig. 1 is plan structure schematic diagram of the present utility model,
Fig. 2 is main TV structure schematic diagram of the present utility model.
In the drawings, 1, concrete bar 2, hoop plate 3, gripper shoe 4, screw shaft 5, pin 6, U-loop 7, strain plate 8, hinge cover 9, backguy.
The specific embodiment
In Fig. 1 and Fig. 2, described from drawing self-locking burst Combined anchor ear to be installed in the concrete bar from bottom to up more than 2/3rds places, it comprises gripper shoe 3, strain plate 7, U-loop 6 and hoop plate 2, described gripper shoe 3 two ends are plane and mutually vertical, be herringbone in the middle of the gripper shoe, described gripper shoe is that four block gaps arrange the approximate octagon of formation, between adjacent two gripper shoes, one end, be provided with strain plate 7, described strain plate is four, its middle part all is movably connected with gripper shoe with screw shaft 4 and hinge cover 8, described strain plate upper end is connected with U-loop 6 with pin 5, the strain plate lower end is fixedly linked with pin and anchor ear 2 one ends, described four anchor ear other ends rise can hold fixedly concrete bar 1 tightly, described U-loop links to each other with backguy 9 one ends, when simultaneously fastening four backguys downwards, strain plate rotates simultaneously and anchor ear is moved inward simultaneously the concrete bar is held tightly fixing, and the backguy other end is fixed in the stratum by anchoring pile.Described U-loop and screw shaft and pin are made of a steel, and other pieces are made with the aviation aluminium.Certainly also available three gripper shoe spaces arrange and form approximate six corner shapes.
Claims (1)
1. certainly draw self-locking burst Combined anchor ear, it comprises gripper shoe (3), strain plate (7), U-loop (6) and hoop plate (2), it is characterized in that: described gripper shoe interval arranges, described gripper shoe two ends are mutually vertical, between the adjacent end of two gripper shoes, be movably set with strain plate with screw shaft (4), described strain plate movable upper end is connected with U-loop, the strain plate lower end is provided with anchor ear, and described U-loop links to each other with backguy (9) one ends.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220430957 CN202831762U (en) | 2012-08-29 | 2012-08-29 | Self-pulling and self-locking separated combination type hoop |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220430957 CN202831762U (en) | 2012-08-29 | 2012-08-29 | Self-pulling and self-locking separated combination type hoop |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202831762U true CN202831762U (en) | 2013-03-27 |
Family
ID=47943505
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220430957 Expired - Fee Related CN202831762U (en) | 2012-08-29 | 2012-08-29 | Self-pulling and self-locking separated combination type hoop |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202831762U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104283152A (en) * | 2014-10-08 | 2015-01-14 | 国家电网公司 | Self-lifting rotary insulation cage |
CN104456452A (en) * | 2013-09-12 | 2015-03-25 | 海洋王(东莞)照明科技有限公司 | Hoop component |
-
2012
- 2012-08-29 CN CN 201220430957 patent/CN202831762U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104456452A (en) * | 2013-09-12 | 2015-03-25 | 海洋王(东莞)照明科技有限公司 | Hoop component |
CN104456452B (en) * | 2013-09-12 | 2019-06-07 | 海洋王(东莞)照明科技有限公司 | Hoop component |
CN104283152A (en) * | 2014-10-08 | 2015-01-14 | 国家电网公司 | Self-lifting rotary insulation cage |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204370830U (en) | A kind of electric pole centralizer | |
CN202416183U (en) | Bent cap collar-clamp type cast support | |
CN104179365B (en) | Overall steel tower displacement constructional method | |
CN105186378A (en) | Power transmission line channel crossing protection mechanism | |
CN205000721U (en) | Flange switching communication tower | |
CN202831762U (en) | Self-pulling and self-locking separated combination type hoop | |
CN105586832A (en) | Suspension type catwalk surface net mounting system | |
CN110029861A (en) | A kind of signal tower suitable for mountainous region | |
CN201102883Y (en) | Steel cable sliding and lifting device | |
CN204457043U (en) | A kind of anti-reversing device | |
CN217839669U (en) | But roof beam support is prevented falling in height-adjusting's intelligence dynamometry shock attenuation | |
CN203977421U (en) | Line of power dish | |
CN106368236B (en) | Device and method for self-adaptively adjusting foundation of goaf | |
CN104314354A (en) | High-voltage electric tower base | |
CN111894049A (en) | Loading device and test equipment for foundation pile compression-resistant static load test | |
CN209011132U (en) | A kind of fixed foundation pit berm structure of assembled two point | |
CN201459612U (en) | Squirrel-cage repairing device for bridge stay cable | |
CN202882002U (en) | Earth moving device used in deep foundation pit excavation | |
CN208183816U (en) | A kind of default section support pile experimental rig for simulating different bending strengths | |
CN105113426A (en) | Cable connector and steel truss arch bridge cable connecting method | |
CN204778228U (en) | Driving sheave protection casing | |
CN202519590U (en) | Top mounting small hanging basket | |
CN110359756A (en) | 750kV booster stations framework installation method | |
CN215626613U (en) | Lifting device for bridge tunnel maintenance | |
CN213329138U (en) | Loading device and test equipment for foundation pile pulling-resistant static load test |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130327 Termination date: 20130829 |