CN202831697U - Modularization standard plant - Google Patents

Modularization standard plant Download PDF

Info

Publication number
CN202831697U
CN202831697U CN201220421610.5U CN201220421610U CN202831697U CN 202831697 U CN202831697 U CN 202831697U CN 201220421610 U CN201220421610 U CN 201220421610U CN 202831697 U CN202831697 U CN 202831697U
Authority
CN
China
Prior art keywords
courtyard
house type
factory building
building body
open yard
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201220421610.5U
Other languages
Chinese (zh)
Inventor
董升顺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ARTIE INDUSTRIAL CO LTD CHINA
Original Assignee
ARTIE INDUSTRIAL CO LTD CHINA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ARTIE INDUSTRIAL CO LTD CHINA filed Critical ARTIE INDUSTRIAL CO LTD CHINA
Priority to CN201220421610.5U priority Critical patent/CN202831697U/en
Application granted granted Critical
Publication of CN202831697U publication Critical patent/CN202831697U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Residential Or Office Buildings (AREA)

Abstract

The utility model discloses a modularization standard plant which comprises a plant body, wherein the plant body at least comprises two floors. A first open yard and a second open yard are longitudinally arranged in the middle of the interior of the plant body, and a third open yard and a fourth open yard are horizontally arranged in the middle of the interior of the plant body. A wall body is arranged in each floor in the plant body. The wall body is matched with the first open yard, the second open yard, the third open yard and the fourth open yard to separate eight independently closed house type sections which are communicated with the first open yard, the second open yard, the third open yard and the fourth open yard. Each closed house type section in the plant body is provided with a pedestrian stair and a cargo elevator, and the pedestrian stair and the cargo elevator are communicated with upstairs and downstairs. The modularization standard plant is large in unit plot ratio, and beatified in lighting, ventilation and environment, and working sections can not be interfered in a crossed mode.

Description

The modularization Standard Factory Room
Technical field
The utility model relates to a kind of factory building, particularly relates to a kind of modularization Standard Factory Room.
Background technology
The defective of present industry park Standard Factory Room: floorarea ratio is low, and general floorarea ratio is about 0.76; Administrative Area reaches from function with the workshop and can not separate fully in form, disturbs each other larger; Workshop daylighting, deficiency in draught; People's Bank of China, logistics access and passage are same outlet and passage; Without the separate space of relative separation, disturb each other larger between the enterprise.
The utility model content
It is large that technical problem to be solved in the utility model provides a kind of unit floorarea ratio, and operation interval can not intersect interference, the modularization Standard Factory Room of daylighting, ventilation and landscaping.
In order to solve the problems of the technologies described above, the modularization Standard Factory Room that the utility model provides, comprise the factory building body, described factory building body is made of two floors at least, the middle part vertically is provided with the first courtyard and the second courtyard in described factory building body, the middle part laterally is provided with the 3rd courtyard and the 4th courtyard, in described factory building body, be provided with body of wall and described the first courtyard in every floor layer, the second courtyard, the 3rd courtyard and the 4th courtyard cooperate be divided in the described factory building body 8 independent sealings and respectively with described the first courtyard, the house type that the second courtyard the 3rd courtyard and the 4th courtyard communicate is interval, and the described house type of each of described factory building body interval is equipped with in the perforation, People's Bank of China's stair and baggage elevator downstairs.
Described factory building body is made of three floors.
Each described house type interval all can adopt compartment wall to be separated out some intervals.
Adopt the modularization Standard Factory Room of technique scheme, because the middle part vertically is provided with the first courtyard and the second courtyard in the factory building body, the middle part laterally is provided with the 3rd courtyard and the 4th courtyard, in the factory building body, be provided with body of wall and the first courtyard in every floor layer, the second courtyard, the 3rd courtyard and the 4th courtyard cooperate be divided in the described factory building body 8 independent sealings and respectively with the first courtyard, the second courtyard, the house type that the 3rd courtyard and the 4th courtyard communicate is interval, the described house type of each of factory building body interval is equipped with in the perforation, People's Bank of China's stair and baggage elevator downstairs, the floorarea ratio of unit can reach 0.97, is 1.05 if courtyard is calculated the area floorarea ratio; The Administrative Area in each house type interval, life zone and production department, storage etc. all reach from function and separate fully in form, have avoided mutual intersection to disturb; Standard Factory Room is equipped with separately independently traffic access point, People's Bank of China's Vomitory, does not interfere with each other between enterprise; The traffic access point in each house type interval, People's Bank of China's Vomitory all separate, and be noiseless each other; Each house type interval is equipped with Cargo Lift, has satisfied storage, the logistics transportation demand of customer service material; The demand of factory building daylighting, ventilation and landscaping that the courtyard design is perfect.
In sum, the utility model is that a kind of unit floorarea ratio is large, and operation interval can not intersect interference, the modularization Standard Factory Room of daylighting, ventilation and landscaping.
Description of drawings
Fig. 1 is Stall structural representation of the present utility model.
Fig. 2 is second floor structural representation of the present utility model.
Fig. 3 is three building structural representations of the present utility model.
The specific embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.
Referring to Fig. 1, Fig. 2 and Fig. 3, factory building body 1 is made of three floors, vertically be provided with the first courtyard 2 and the second courtyard 4 at factory building body 1 interior middle part, the middle part laterally is provided with the 3rd courtyard 3 and the 4th courtyard 5, in factory building body 1 interior every floor layer, be provided with body of wall 6 and the first courtyard 2, the second courtyard 4, the 3rd courtyard 3 and the 4th courtyard 5 cooperate and will be divided into the first house type interval 7 of 8 independent sealings in the factory building body, the second house type interval 8, the 3rd house type interval 9, the 4th house type interval 10, the 5th house type interval 11, the 6th house type interval 12, interval the 13 and the 8th house type interval 14 of the 7th house type, the first house type interval 7 communicates with the first courtyard 2, the second house type interval 8 communicates with the first courtyard 2 and the 3rd courtyard 3, the 3rd house type interval 9 communicates with the second courtyard 4 and the 3rd courtyard 3, the 4th house type interval 10 communicates with the second courtyard 4, the 5th house type interval 11 communicates with the second courtyard 4, the 6th house type interval 12 communicates with the second courtyard 4 and the 4th courtyard 5, the 7th house type interval 13 communicates with the first courtyard 2 and the 4th courtyard 5, the 8th house type interval 8 communicates with the first courtyard 2, the first house type interval 7 is provided with and connects Stall to first People's Bank of China's stair 17 and first baggage elevator 18 in the 3rd buildings, the second house type interval 8 is provided with and connects Stall to second People's Bank of China's stair 27 and second baggage elevator 19 in the 3rd buildings, the 3rd house type interval 9 is provided with and connects Stall to the 3rd People's Bank of China's stair 28 and the 3rd baggage elevator 21 in the 3rd buildings, the 4th house type interval 10 is provided with and connects Stall to first People's Bank of China's stair 25 and the 4th baggage elevator 23 in the 3rd buildings, the 5th house type interval 11 is provided with and connects Stall to the 5th People's Bank of China's stair 26 and the 5th baggage elevator 24 in the 3rd buildings, the 6th house type interval 12 is provided with and connects Stall to the capable stair 29 of Sixth Man and the 6th baggage elevator 22 in the 3rd buildings, the 7th house type interval 13 is provided with and connects Stall to the 7th People's Bank of China's stair 30 and the 7th baggage elevator 20 in the 3rd buildings, the 8th house type interval 14 is provided with and connects Stall to the 8th People's Bank of China's stair 16 and the 8th baggage elevator 15 in the 3rd buildings, and each house type interval all can adopt compartment wall to be separated out some intervals.
Referring to Fig. 1, Fig. 2 and Fig. 3, owing to vertically be provided with the first courtyard 2 and the second courtyard 4 at factory building body 1 interior middle part, the middle part laterally is provided with the 3rd courtyard 3 and the 4th courtyard 5, in factory building body 1 interior every floor layer, be provided with body of wall 6 and the first courtyard 2, the second courtyard 4, the 3rd courtyard 3 and the 4th courtyard 5 cooperate be divided in the factory building body 18 independent sealings and respectively with the first courtyard 2, the second courtyard 4, the house type that the 3rd courtyard 3 and the 4th courtyard 5 communicate is interval, each house type interval of factory building body 1 is equipped with in the perforation, People's Bank of China's stair and baggage elevator downstairs, the floorarea ratio of unit can reach 0.97, is 1.05 if courtyard is calculated the area floorarea ratio; The Administrative Area in each house type interval, life zone and production department, storage etc. all reach from function and separate fully in form, have avoided mutual intersection to disturb; Standard Factory Room is equipped with separately independently traffic access point, People's Bank of China's Vomitory, does not interfere with each other between enterprise; The traffic access point in each house type interval, People's Bank of China's Vomitory all separate, and be noiseless each other; Each house type interval is equipped with Cargo Lift, has satisfied storage, the logistics transportation demand of customer service material; The demand of factory building daylighting, ventilation and landscaping that the courtyard design is perfect.

Claims (3)

1. modularization Standard Factory Room, comprise the factory building body, described factory building body is made of two floors at least, it is characterized in that: the middle part vertically is provided with the first courtyard and the second courtyard in described factory building body, the middle part laterally is provided with the 3rd courtyard and the 4th courtyard, in described factory building body, be provided with body of wall and described the first courtyard in every floor layer, the second courtyard, the 3rd courtyard and the 4th courtyard cooperate be divided in the described factory building body 8 independent sealings and respectively with described the first courtyard, the house type that the second courtyard the 3rd courtyard and the 4th courtyard communicate is interval, and the described house type of each of described factory building body interval is equipped with in the perforation, People's Bank of China's stair and baggage elevator downstairs.
2. modularization Standard Factory Room according to claim 1, it is characterized in that: described factory building body is made of three floors.
3. modularization Standard Factory Room according to claim 1 and 2, it is characterized in that: each described house type interval all can adopt compartment wall to be separated out some intervals.
CN201220421610.5U 2012-08-23 2012-08-23 Modularization standard plant Expired - Lifetime CN202831697U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201220421610.5U CN202831697U (en) 2012-08-23 2012-08-23 Modularization standard plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201220421610.5U CN202831697U (en) 2012-08-23 2012-08-23 Modularization standard plant

Publications (1)

Publication Number Publication Date
CN202831697U true CN202831697U (en) 2013-03-27

Family

ID=47943440

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201220421610.5U Expired - Lifetime CN202831697U (en) 2012-08-23 2012-08-23 Modularization standard plant

Country Status (1)

Country Link
CN (1) CN202831697U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110725397A (en) * 2019-12-18 2020-01-24 沈阳建筑大学 Space building cavity ventilation daylighting structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110725397A (en) * 2019-12-18 2020-01-24 沈阳建筑大学 Space building cavity ventilation daylighting structure
CN110725397B (en) * 2019-12-18 2020-03-27 沈阳建筑大学 Space building cavity ventilation daylighting structure

Similar Documents

Publication Publication Date Title
CN202831697U (en) Modularization standard plant
CN203175064U (en) Double-layer sleeved mobile barrack
CN202787502U (en) Combined house box
CN201694713U (en) Special elevator for fifth, sixth and seventh floors of multi-storey residential building
CN102296836A (en) Outdoor multi-elevator multistoried corridor high-rise building
CN201087564Y (en) Villa type dwelling building
CN201627382U (en) Duplex superposed laminated single-family residential building
CN201090034Y (en) Stairway structure of multi-layer building architecture
CN201024682Y (en) Stair and elevator integrated linkage structure for residence building
CN204282880U (en) A kind of business buildings being provided with escape stair
CN203474172U (en) Layered elevator with inner lift cars and outer lift cars
CN201649695U (en) Box unit combined building
CN200989064Y (en) Cross gallery-spanning apartment houses arranged in two or more levels
CN200978531Y (en) Drawing room elevated composite structure house
CN216893649U (en) Comfortable small house type and flat-storey apartment with elevated space
CN200975112Y (en) Civil alley, type dwelling building
CN211923663U (en) High-rise commercial residential building community structure based on aerial commercial ecology
CN210288703U (en) Combined structure of modularized integrated movable house
CN220414969U (en) Residential structure
CN2660034Y (en) Multiple apartment
CN203769364U (en) Double-layer double-faced storeroom based on base soil channel
CN202596193U (en) Multi-household type duplex building structure
CN206829672U (en) The jump formula of one kind occlusion half folds villa house structure in the air
CN204418719U (en) The novel staggered sight garden residence moving back platform
CN202611269U (en) Multi-apartment-type combined residence

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Modularization standard plant

Effective date of registration: 20200623

Granted publication date: 20130327

Pledgee: Changsha Bank city branch of Limited by Share Ltd.

Pledgor: ARTIE INDUSTRIAL Co.,Ltd. CHINA

Registration number: Y2020980003434

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20220331

Granted publication date: 20130327

Pledgee: Changsha Bank city branch of Limited by Share Ltd.

Pledgor: ARTIE INDUSTRIAL Co.,Ltd. CHINA

Registration number: Y2020980003434

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20130327