CN202830775U - Bridge hollow high pier internal formwork simple working platform - Google Patents
Bridge hollow high pier internal formwork simple working platform Download PDFInfo
- Publication number
- CN202830775U CN202830775U CN2012204412543U CN201220441254U CN202830775U CN 202830775 U CN202830775 U CN 202830775U CN 2012204412543 U CN2012204412543 U CN 2012204412543U CN 201220441254 U CN201220441254 U CN 201220441254U CN 202830775 U CN202830775 U CN 202830775U
- Authority
- CN
- China
- Prior art keywords
- pier
- bridge
- working platform
- hollow high
- internal formwork
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model relates to the field of bridge construction, in particular to a bridge hollow high pier internal formwork simple working platform. The bridge hollow high pier internal formwork simple working platform solves the problems that work amount of erecting steel pipe scaffolds is large, cost is high, disassembly and assembly difficulty is large, builders climb up a pier and climb down the pier inconveniently and the like in existing construction. The bridge hollow high pier internal formwork simple working platform comprises reserved installation holes arranged in two side walls of a pier body, and positioning bars inserted in the reserved installation holes in a penetrating mode. Horizontal supports close to the two side walls of the pier body and perpendicular to the longitudinal center line of a bridge are erected on the positioning bars, two horizontal supports are provided with longitudinal supports at intervals, a lower operating platform is paved on the longitudinal supports and provided with an integrated type steel pipe scaffold, and an upper operating platform is arranged on the top of the integrated type steel pipe scaffold. According to the bridge hollow high pier internal formwork simple working platform, work amount of the scaffolds is small, the cost is low, operation is simple and convenient, construction is quick, the builders can climb up the pier and climb down the pier conveniently, structural design is reasonable, use is convenient, application range is wide, installation speed and climbing speed are quick, and the bridge hollow high pier internal formwork simple working platform has high application value and wide application prospect.
Description
Technical field
The utility model relates to technical field of bridge construction, is specially the simple and easy working platform of a kind of bridge Hollow High Pier internal mold.
Background technology
The variable cross-section high pier is modal substructure form in mountainous area highway and the railroad bridge, and is more common when particularly bridge construction is higher, and two kinds of forms of the solid high pier of nonuniform thin-walled hollow pier and variable cross-section are generally arranged.For the internal mold construction of nonuniform thin-walled hollow pier, its traditional method is to set up steel pipe scaffold from the bottom to the top in pier, until pier construction is complete, remove again scaffold, there is following problem in this way in practice of construction, and 1, to set up the steel pipe scaffold engineering quantity large, cost is high; 2, dismounting difficulty is large; 3, pier is inconvenient about the constructor.
Summary of the invention
The utility model exist when solving existing bridge hollow pier internal mold construction set up that the steel pipe scaffold engineering quantity is large, cost is high, the dismounting difficulty large, constructor's problem such as pier inconvenience up and down, provide a kind of bridge Hollow High Pier internal mold simple and easy working platform.
The utility model is to adopt following technical scheme to realize: the simple and easy working platform of bridge Hollow High Pier internal mold, comprising that the interval is symmetricly set on the reserving installation hole of pier shaft two side and runs through is plugged in the reserving installation hole, and an end exposes the locating bar in the pier, locating bar is added to be provided with respectively near the pier shaft two side, and the horizontal support vertical with the bridge longitudinal centre line, space-stop rack is provided with the longitudinal carrier with bridge longitudinal center line parallel on two horizontal supports, be equipped with the bottom operating platform on the longitudinal carrier, the integrated steel tube scaffold identical with one-time-concreting concrete height is installed on the operating platform of bottom, and integrated steel tube scaffold top is provided with the upper operating platform.
Be provided with jacking between described integrated steel tube scaffold and the upper operating platform, jacking is used for adjusting the levelness of upper operating platform.
Adopt structure design of the present utility model, in pier shaft, set up by the bottom operating platform, the internal mold working platform of the reusable edible that integrated steel tube scaffold and upper operating platform consist of, this working platform can along with pier shaft build the height rising and constantly climb, utilize tower crane whole to promote up and down operating platform and steel pipe scaffold, so circulation, until finish the construction of whole pier shaft, wherein be convenient to tie up reinforcing bar and vertical internal mold at the bottom operating platform, according to one-time-concreting concrete height, establish the integrated steel tube scaffold that not dismounting can be recycled thereon, the scaffolding steel pipe top is upper by behind the jacking adjustment height, set up the upper operating platform, be convenient to tie up reinforcing bar, found internal mold and lay distributing device, concreting, by practical proof, the utlity model has following advantage:
1, do not need to set up steel pipe scaffold from the bottom to the top in pier, only need according to the disposable integrated steel tube scaffold of setting up of one-time-concreting concrete height, the scaffolding work amount is little, and cost is low;
2, the workman operates at the upper and lower part operating platform, and is time saving and energy saving, easy and simple to handle, and construction fast;
3, constantly rise owing to whole working platform, pier inner platform lower space can in time apply permanent spireme cat ladder in the pier by design, like this pier about the constructability personnel.
In a word, the utility model reasonable in design, easy to use, applied widely, the hollow pier of all compound sections all can adopt this working platform to carry out the internal mold construction, and installation rate is fast, climbing speed is fast, has higher using value and comparatively wide application prospect.
Description of drawings
Fig. 1 is structural representation of the present utility model;
Among the figure: the 1-reserving installation hole; The 2-locating bar; The 3-horizontal support; The 4-longitudinal carrier; 5-bottom operating platform; 6-integrated steel tube scaffold; 7-upper operating platform; The 8-jacking; 9-permanent spireme cat ladder.
The specific embodiment
The simple and easy working platform of bridge Hollow High Pier internal mold, as shown in Figure 1, comprising that the interval is symmetricly set on the reserving installation hole 1 of pier shaft two side and runs through is plugged in the reserving installation hole, and an end exposes the locating bar 2 in the pier, locating bar is added to be provided with respectively near the pier shaft two side, and the horizontal support 3 vertical with the bridge longitudinal centre line, space-stop rack is provided with the longitudinal carrier 4 with bridge longitudinal center line parallel on two horizontal supports, be equipped with bottom operating platform 5 on the longitudinal carrier, the integrated steel tube scaffold 6 identical with one-time-concreting concrete height is installed on the operating platform of bottom, and integrated steel tube scaffold top is provided with upper operating platform 7.Be provided with jacking 8 between integrated steel tube scaffold 6 and the upper operating platform 7.
During Specific construction, reserve φ 60 reserving installation holes at pier shaft to the two side along bridge, pitch of holes 100cm, insert L-100cm φ 50 locating bars in the hole, in pier, expose 50cm, 18 i iron are respectively set up in the direction across bridge two side on locating bar, as longitudinal carrier, vertical bridge is to setting up 18 i iron as horizontal support thereon, and 18 i iron spacings are 50 cm, lays 5 cm planks on it, form the bottom job platform, be convenient to tie up reinforcing bar and vertical internal mold, according to one-time-concreting concrete height, establish the φ 50 integrated steel tube scaffolds that not dismounting can be recycled thereon, the scaffolding steel pipe top is upper by behind the jacking adjustment height, set up the top job platform with plank, be convenient to tie up reinforcing bar, found internal mold and lay distributing device, concreting.
Application example
The special stone of Beijing-to-Shijiazhuang visitor too direct-through line is striden 307 national highway bridge total length 459.13m, have 5 piers and adopt construction equipment construction described in the utility model, be respectively: No. 3 piers (the high 43m of pier), No. 4 piers (the high 61m of pier), No. 5 piers (the high 74m of pier), No. 6 piers (the high 72m of pier), No. 7 piers (the high 65m of pier).Adopt the utility model, scaffold reduces engineering quantity 13048m3, saves 86.1 ten thousand yuan of costs, and easy and simple to handle, construction safety is quick, and the constructability personnel are pier up and down, is built, the consistent favorable comment of design, supervisor.
Claims (2)
1. simple and easy working platform of bridge Hollow High Pier internal mold, it is characterized in that comprising that the interval is symmetricly set on the reserving installation hole of pier shaft two side (1) and runs through is plugged in the reserving installation hole, and an end exposes the locating bar (2) in the pier, locating bar is added to be provided with respectively near the pier shaft two side, and the horizontal support vertical with the bridge longitudinal centre line (3), space-stop rack is provided with the longitudinal carrier (4) with bridge longitudinal center line parallel on two horizontal supports, be equipped with bottom operating platform (5) on the longitudinal carrier, the integrated steel tube scaffold (6) identical with one-time-concreting concrete height is installed on the operating platform of bottom, and integrated steel tube scaffold top is provided with upper operating platform (7).
2. the simple and easy working platform of bridge Hollow High Pier internal mold according to claim 1 is characterized in that being provided with jacking (8) between integrated steel tube scaffold (6) and the upper operating platform (7).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012204412543U CN202830775U (en) | 2012-09-02 | 2012-09-02 | Bridge hollow high pier internal formwork simple working platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012204412543U CN202830775U (en) | 2012-09-02 | 2012-09-02 | Bridge hollow high pier internal formwork simple working platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202830775U true CN202830775U (en) | 2013-03-27 |
Family
ID=47942521
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012204412543U Expired - Fee Related CN202830775U (en) | 2012-09-02 | 2012-09-02 | Bridge hollow high pier internal formwork simple working platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202830775U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106087751A (en) * | 2016-06-30 | 2016-11-09 | 中交航局第四工程有限公司 | Operating platform in a kind of hollow thin-walled high pier |
-
2012
- 2012-09-02 CN CN2012204412543U patent/CN202830775U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106087751A (en) * | 2016-06-30 | 2016-11-09 | 中交航局第四工程有限公司 | Operating platform in a kind of hollow thin-walled high pier |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206971719U (en) | A kind of construction hydraulic formwork climbing device | |
CN201826525U (en) | Climbing shuttering system device for buildings | |
CN202830776U (en) | Bridge variable cross-section rectangular high pier cantilever creeping formwork construction device | |
CN101481944A (en) | Method for mounting high pier, tower over-form construction reinforced bar and movable support thereof | |
CN103410320B (en) | The tower silo flexibility platform bitubular connects sliding construction method | |
CN103485574B (en) | A kind of granulation tower tower top structure of reinforced concrete method | |
CN102912981B (en) | Gate type high-rise building connected structure construction device | |
CN202247703U (en) | Sliding form turning device of hydraulic climbing frame for high pier | |
CN206873307U (en) | Movable type bridge justifies pier stud work high above the ground operating platform | |
CN102286932B (en) | Construction method for off-site assembling and automatic mounting on bridge of mobile mould bridge abutment | |
CN202830775U (en) | Bridge hollow high pier internal formwork simple working platform | |
CN203200664U (en) | Slip-form construction device for variable cross-section hollow high pier | |
CN110792038B (en) | Self-propelled mold hanging tool and method for high-altitude cast-in-place of tie rod arch bridge beam | |
CN202215006U (en) | Tool-type fixed ladder for construction | |
CN204359161U (en) | A kind of cooling stack with horizontal adapter ring girder construction | |
CN101457587B (en) | Template mutually lifting climbing apparatus and method | |
CN204780925U (en) | City gate hole type inclined shaft slipform platform truck pulls removal structure | |
CN204662929U (en) | A kind of cross-line walking fence operation device | |
CN203248173U (en) | Detachable trestle for pouring tunnel inverted arch concrete | |
CN205934962U (en) | A system of sliding for underground pipe gallery cast -in -situ construction | |
CN201588172U (en) | Integral single-tower non-dorsal-cord cable-stayed-bridge king tower lifting template | |
CN104948206B (en) | Slip form trolley for concrete casting of arched inclined shaft | |
CN206267039U (en) | A kind of jack support platform of hollow slab girder jack-up construction | |
CN209307842U (en) | Hollow High Pier template system | |
CN106522542A (en) | Single-station hydraulic formwork climbing system and climbing method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130327 Termination date: 20200902 |
|
CF01 | Termination of patent right due to non-payment of annual fee |