CN202830775U - Bridge hollow high pier internal formwork simple working platform - Google Patents

Bridge hollow high pier internal formwork simple working platform Download PDF

Info

Publication number
CN202830775U
CN202830775U CN2012204412543U CN201220441254U CN202830775U CN 202830775 U CN202830775 U CN 202830775U CN 2012204412543 U CN2012204412543 U CN 2012204412543U CN 201220441254 U CN201220441254 U CN 201220441254U CN 202830775 U CN202830775 U CN 202830775U
Authority
CN
China
Prior art keywords
pier
bridge
working platform
hollow high
internal formwork
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012204412543U
Other languages
Chinese (zh)
Inventor
穆建廷
雷军
孙炜
任晓琴
渠茂涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Original Assignee
Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd filed Critical Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Priority to CN2012204412543U priority Critical patent/CN202830775U/en
Application granted granted Critical
Publication of CN202830775U publication Critical patent/CN202830775U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to the field of bridge construction, in particular to a bridge hollow high pier internal formwork simple working platform. The bridge hollow high pier internal formwork simple working platform solves the problems that work amount of erecting steel pipe scaffolds is large, cost is high, disassembly and assembly difficulty is large, builders climb up a pier and climb down the pier inconveniently and the like in existing construction. The bridge hollow high pier internal formwork simple working platform comprises reserved installation holes arranged in two side walls of a pier body, and positioning bars inserted in the reserved installation holes in a penetrating mode. Horizontal supports close to the two side walls of the pier body and perpendicular to the longitudinal center line of a bridge are erected on the positioning bars, two horizontal supports are provided with longitudinal supports at intervals, a lower operating platform is paved on the longitudinal supports and provided with an integrated type steel pipe scaffold, and an upper operating platform is arranged on the top of the integrated type steel pipe scaffold. According to the bridge hollow high pier internal formwork simple working platform, work amount of the scaffolds is small, the cost is low, operation is simple and convenient, construction is quick, the builders can climb up the pier and climb down the pier conveniently, structural design is reasonable, use is convenient, application range is wide, installation speed and climbing speed are quick, and the bridge hollow high pier internal formwork simple working platform has high application value and wide application prospect.

Description

The simple and easy working platform of bridge Hollow High Pier internal mold
Technical field
The utility model relates to technical field of bridge construction, is specially the simple and easy working platform of a kind of bridge Hollow High Pier internal mold.
Background technology
The variable cross-section high pier is modal substructure form in mountainous area highway and the railroad bridge, and is more common when particularly bridge construction is higher, and two kinds of forms of the solid high pier of nonuniform thin-walled hollow pier and variable cross-section are generally arranged.For the internal mold construction of nonuniform thin-walled hollow pier, its traditional method is to set up steel pipe scaffold from the bottom to the top in pier, until pier construction is complete, remove again scaffold, there is following problem in this way in practice of construction, and 1, to set up the steel pipe scaffold engineering quantity large, cost is high; 2, dismounting difficulty is large; 3, pier is inconvenient about the constructor.
Summary of the invention
The utility model exist when solving existing bridge hollow pier internal mold construction set up that the steel pipe scaffold engineering quantity is large, cost is high, the dismounting difficulty large, constructor's problem such as pier inconvenience up and down, provide a kind of bridge Hollow High Pier internal mold simple and easy working platform.
The utility model is to adopt following technical scheme to realize: the simple and easy working platform of bridge Hollow High Pier internal mold, comprising that the interval is symmetricly set on the reserving installation hole of pier shaft two side and runs through is plugged in the reserving installation hole, and an end exposes the locating bar in the pier, locating bar is added to be provided with respectively near the pier shaft two side, and the horizontal support vertical with the bridge longitudinal centre line, space-stop rack is provided with the longitudinal carrier with bridge longitudinal center line parallel on two horizontal supports, be equipped with the bottom operating platform on the longitudinal carrier, the integrated steel tube scaffold identical with one-time-concreting concrete height is installed on the operating platform of bottom, and integrated steel tube scaffold top is provided with the upper operating platform.
Be provided with jacking between described integrated steel tube scaffold and the upper operating platform, jacking is used for adjusting the levelness of upper operating platform.
Adopt structure design of the present utility model, in pier shaft, set up by the bottom operating platform, the internal mold working platform of the reusable edible that integrated steel tube scaffold and upper operating platform consist of, this working platform can along with pier shaft build the height rising and constantly climb, utilize tower crane whole to promote up and down operating platform and steel pipe scaffold, so circulation, until finish the construction of whole pier shaft, wherein be convenient to tie up reinforcing bar and vertical internal mold at the bottom operating platform, according to one-time-concreting concrete height, establish the integrated steel tube scaffold that not dismounting can be recycled thereon, the scaffolding steel pipe top is upper by behind the jacking adjustment height, set up the upper operating platform, be convenient to tie up reinforcing bar, found internal mold and lay distributing device, concreting, by practical proof, the utlity model has following advantage:
1, do not need to set up steel pipe scaffold from the bottom to the top in pier, only need according to the disposable integrated steel tube scaffold of setting up of one-time-concreting concrete height, the scaffolding work amount is little, and cost is low;
2, the workman operates at the upper and lower part operating platform, and is time saving and energy saving, easy and simple to handle, and construction fast;
3, constantly rise owing to whole working platform, pier inner platform lower space can in time apply permanent spireme cat ladder in the pier by design, like this pier about the constructability personnel.
In a word, the utility model reasonable in design, easy to use, applied widely, the hollow pier of all compound sections all can adopt this working platform to carry out the internal mold construction, and installation rate is fast, climbing speed is fast, has higher using value and comparatively wide application prospect.
Description of drawings
Fig. 1 is structural representation of the present utility model;
Among the figure: the 1-reserving installation hole; The 2-locating bar; The 3-horizontal support; The 4-longitudinal carrier; 5-bottom operating platform; 6-integrated steel tube scaffold; 7-upper operating platform; The 8-jacking; 9-permanent spireme cat ladder.
The specific embodiment
The simple and easy working platform of bridge Hollow High Pier internal mold, as shown in Figure 1, comprising that the interval is symmetricly set on the reserving installation hole 1 of pier shaft two side and runs through is plugged in the reserving installation hole, and an end exposes the locating bar 2 in the pier, locating bar is added to be provided with respectively near the pier shaft two side, and the horizontal support 3 vertical with the bridge longitudinal centre line, space-stop rack is provided with the longitudinal carrier 4 with bridge longitudinal center line parallel on two horizontal supports, be equipped with bottom operating platform 5 on the longitudinal carrier, the integrated steel tube scaffold 6 identical with one-time-concreting concrete height is installed on the operating platform of bottom, and integrated steel tube scaffold top is provided with upper operating platform 7.Be provided with jacking 8 between integrated steel tube scaffold 6 and the upper operating platform 7.
During Specific construction, reserve φ 60 reserving installation holes at pier shaft to the two side along bridge, pitch of holes 100cm, insert L-100cm φ 50 locating bars in the hole, in pier, expose 50cm, 18 i iron are respectively set up in the direction across bridge two side on locating bar, as longitudinal carrier, vertical bridge is to setting up 18 i iron as horizontal support thereon, and 18 i iron spacings are 50 cm, lays 5 cm planks on it, form the bottom job platform, be convenient to tie up reinforcing bar and vertical internal mold, according to one-time-concreting concrete height, establish the φ 50 integrated steel tube scaffolds that not dismounting can be recycled thereon, the scaffolding steel pipe top is upper by behind the jacking adjustment height, set up the top job platform with plank, be convenient to tie up reinforcing bar, found internal mold and lay distributing device, concreting.
Application example
The special stone of Beijing-to-Shijiazhuang visitor too direct-through line is striden 307 national highway bridge total length 459.13m, have 5 piers and adopt construction equipment construction described in the utility model, be respectively: No. 3 piers (the high 43m of pier), No. 4 piers (the high 61m of pier), No. 5 piers (the high 74m of pier), No. 6 piers (the high 72m of pier), No. 7 piers (the high 65m of pier).Adopt the utility model, scaffold reduces engineering quantity 13048m3, saves 86.1 ten thousand yuan of costs, and easy and simple to handle, construction safety is quick, and the constructability personnel are pier up and down, is built, the consistent favorable comment of design, supervisor.

Claims (2)

1. simple and easy working platform of bridge Hollow High Pier internal mold, it is characterized in that comprising that the interval is symmetricly set on the reserving installation hole of pier shaft two side (1) and runs through is plugged in the reserving installation hole, and an end exposes the locating bar (2) in the pier, locating bar is added to be provided with respectively near the pier shaft two side, and the horizontal support vertical with the bridge longitudinal centre line (3), space-stop rack is provided with the longitudinal carrier (4) with bridge longitudinal center line parallel on two horizontal supports, be equipped with bottom operating platform (5) on the longitudinal carrier, the integrated steel tube scaffold (6) identical with one-time-concreting concrete height is installed on the operating platform of bottom, and integrated steel tube scaffold top is provided with upper operating platform (7).
2. the simple and easy working platform of bridge Hollow High Pier internal mold according to claim 1 is characterized in that being provided with jacking (8) between integrated steel tube scaffold (6) and the upper operating platform (7).
CN2012204412543U 2012-09-02 2012-09-02 Bridge hollow high pier internal formwork simple working platform Expired - Fee Related CN202830775U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012204412543U CN202830775U (en) 2012-09-02 2012-09-02 Bridge hollow high pier internal formwork simple working platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012204412543U CN202830775U (en) 2012-09-02 2012-09-02 Bridge hollow high pier internal formwork simple working platform

Publications (1)

Publication Number Publication Date
CN202830775U true CN202830775U (en) 2013-03-27

Family

ID=47942521

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012204412543U Expired - Fee Related CN202830775U (en) 2012-09-02 2012-09-02 Bridge hollow high pier internal formwork simple working platform

Country Status (1)

Country Link
CN (1) CN202830775U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106087751A (en) * 2016-06-30 2016-11-09 中交航局第四工程有限公司 Operating platform in a kind of hollow thin-walled high pier

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106087751A (en) * 2016-06-30 2016-11-09 中交航局第四工程有限公司 Operating platform in a kind of hollow thin-walled high pier

Similar Documents

Publication Publication Date Title
CN206971719U (en) A kind of construction hydraulic formwork climbing device
CN201826525U (en) Climbing shuttering system device for buildings
CN202830776U (en) Bridge variable cross-section rectangular high pier cantilever creeping formwork construction device
CN101481944A (en) Method for mounting high pier, tower over-form construction reinforced bar and movable support thereof
CN103410320B (en) The tower silo flexibility platform bitubular connects sliding construction method
CN103485574B (en) A kind of granulation tower tower top structure of reinforced concrete method
CN102912981B (en) Gate type high-rise building connected structure construction device
CN202247703U (en) Sliding form turning device of hydraulic climbing frame for high pier
CN206873307U (en) Movable type bridge justifies pier stud work high above the ground operating platform
CN102286932B (en) Construction method for off-site assembling and automatic mounting on bridge of mobile mould bridge abutment
CN202830775U (en) Bridge hollow high pier internal formwork simple working platform
CN203200664U (en) Slip-form construction device for variable cross-section hollow high pier
CN110792038B (en) Self-propelled mold hanging tool and method for high-altitude cast-in-place of tie rod arch bridge beam
CN202215006U (en) Tool-type fixed ladder for construction
CN204359161U (en) A kind of cooling stack with horizontal adapter ring girder construction
CN101457587B (en) Template mutually lifting climbing apparatus and method
CN204780925U (en) City gate hole type inclined shaft slipform platform truck pulls removal structure
CN204662929U (en) A kind of cross-line walking fence operation device
CN203248173U (en) Detachable trestle for pouring tunnel inverted arch concrete
CN205934962U (en) A system of sliding for underground pipe gallery cast -in -situ construction
CN201588172U (en) Integral single-tower non-dorsal-cord cable-stayed-bridge king tower lifting template
CN104948206B (en) Slip form trolley for concrete casting of arched inclined shaft
CN206267039U (en) A kind of jack support platform of hollow slab girder jack-up construction
CN209307842U (en) Hollow High Pier template system
CN106522542A (en) Single-station hydraulic formwork climbing system and climbing method thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130327

Termination date: 20200902

CF01 Termination of patent right due to non-payment of annual fee