Hoisting clamping apparatus for jumpers of multi-bundled conductors in overhead line construction Download PDFInfo
- Publication number
- CN202817600U CN202817600U CN 201220410273 CN201220410273U CN202817600U CN 202817600 U CN202817600 U CN 202817600U CN 201220410273 CN201220410273 CN 201220410273 CN 201220410273 U CN201220410273 U CN 201220410273U CN 202817600 U CN202817600 U CN 202817600U
- Authority
- CN
- China
- Prior art keywords
- hoisting
- lifting
- overhead line
- line construction
- gripping member
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Suspension Of Electric Lines Or Cables (AREA)
Abstract
Description
【技术领域】 【Technical field】
本实用新型涉及输变电架线施工领域,特别涉及一种架空线路施工多分裂导线跳线用吊装卡具。The utility model relates to the field of wire construction for power transmission and transformation, in particular to a hoisting jig for multi-split wire jumpers in overhead line construction.
【背景技术】 【Background technique】
在架空线路施工过程中,多分裂导线的跳线多采用铝管式跳线和笼式跳线。在多分裂导线的跳线的过程中,需要将8根导线同时吊起。在以往的施工过程中,通常采用尼龙绳将8根导线捆扎在一起进行起吊的方式。这种捆扎过程较为繁琐,并存在一定安全风险。In the construction process of overhead lines, jumpers with multi-split conductors mostly use aluminum tube jumpers and cage jumpers. In the process of jumping the multi-split wires, it is necessary to lift 8 wires at the same time. In the previous construction process, nylon ropes were usually used to bundle 8 wires together for lifting. This binding process is relatively cumbersome and has certain safety risks.
因此,亟需设计一个合适的吊装卡具方便导线的吊装。Therefore, it is urgent to design a suitable lifting fixture to facilitate the lifting of the wire.
【实用新型内容】 【Content of utility model】
有鉴于此,为克服现有技术的不足,本实用新型提供一种使用简便的架空线路施工多分裂导线跳线用吊装卡具。In view of this, in order to overcome the deficiencies of the prior art, the utility model provides an easy-to-use hoisting jig for multi-split wire jumper in overhead line construction.
一种架空线路施工多分裂导线跳线用吊装卡具,包括主体圆盘、固定导线线夹的多个接头和用于起吊的吊耳,所述多个接头均匀地分布在所述圆盘的圆周上,所述吊耳焊接在所述圆盘的正中。A hoisting jig for multi-split wire jumpers in overhead line construction, including a main body disc, multiple joints for fixing wire clamps and lifting lugs for lifting, and the multiple joints are evenly distributed on the sides of the disc. On the circumference, the lifting lug is welded in the middle of the disc.
优选地,所述圆盘上接头的数量与根据所述吊装卡具所需一次性起吊的导线数一致。Preferably, the number of joints on the disc is consistent with the number of wires that need to be hoisted at one time according to the hoisting jig.
优选地,所述圆盘上均匀地开设有圆孔以减轻圆盘自身的重量。Preferably, circular holes are evenly opened on the disc to reduce the weight of the disc itself.
优选地,所述接头上上开设有安装孔,导线线夹通过螺栓安装在所述安装孔中。Preferably, an installation hole is opened on the joint, and the wire clamp is installed in the installation hole through bolts.
优选地,所述吊耳上开设有与起吊工具连接的起吊孔。Preferably, the lifting eye is provided with a lifting hole connected with a lifting tool.
本实用新型的吊装卡具的结构简单,与导线线夹配合使用,可以将架空线路施工中的多分裂导线的跳线一次性起吊成功,改变传统的绳索绑扎起吊的吊装方法,可以提高施工效率和安全系数,在现场施工过程中更加方便、科学。The hoisting jig of the utility model has a simple structure and can be used in conjunction with wire clamps to successfully hoist jumpers of multi-split wires in overhead line construction at one time, changing the traditional hoisting method of rope binding and hoisting, and improving construction efficiency And safety factor, more convenient and scientific in the process of on-site construction.
【附图说明】 【Description of drawings】
图1A为本实用新型的第一优选实施例吊装卡具的结构示意图。Fig. 1A is a structural schematic diagram of the first preferred embodiment of the lifting jig of the present utility model.
图1B为图1中的吊装卡具的沿线B-B的截面视图。FIG. 1B is a cross-sectional view of the lifting fixture in FIG. 1 along line B-B.
图2为图1中吊装卡具与导线线夹装配完成后的示意图。Fig. 2 is a schematic diagram of the hoisting clamp and wire clamp in Fig. 1 after the assembly is completed.
图3为本实用新型的第二优选实施例吊装卡具的结构示意图。Fig. 3 is a structural schematic diagram of the second preferred embodiment of the lifting fixture of the present invention.
图4为图3中的吊装卡具与导线线夹装配完成后的示意图。FIG. 4 is a schematic diagram of the hoisting clamp and wire clamp in FIG. 3 after assembly.
图5为本实用新型的第三优选实施例吊装卡具的结构示意图。Fig. 5 is a schematic structural view of the lifting jig of the third preferred embodiment of the present invention.
【具体实施方式】 【Detailed ways】
为更好地理解本实用新型,以下将结合具体实例对本实用新型进行详细的说明。In order to better understand the utility model, the utility model will be described in detail below in conjunction with specific examples.
为了避免传统的绳索绑扎起吊的吊装方法的弊端,本实用新型提供一种架空线路施工多分裂导线用吊装卡具。吊装卡具主要由Q235钢加工而成,需配合导线线夹使用。使用时,将导线线夹固定在卡具上,再由导线线夹卡好导线,即可实现多根分裂导线跳线的一次性起吊。本实用新型的吊装卡具的具体结构详细陈述如下。In order to avoid the disadvantages of the traditional hoisting method of rope binding and hoisting, the utility model provides a hoisting clamp for overhead line construction with multiple split conductors. The hoisting fixture is mainly made of Q235 steel and needs to be used with wire clamps. When in use, the wire clamp is fixed on the jig, and then the wire is clamped by the wire clamp, so that the one-time lifting of multiple split wire jumpers can be realized. The specific structure of the lifting fixture of the present utility model is stated in detail as follows.
请参阅图1A和1B,其为本实用新型的第一优选实施例吊装卡具10的结构示意图。吊装卡具10主要呈圆盘状,在其主体圆盘12的四周均匀分布着8个用于连接导线线夹的接头14,即每两个接头之间的角度间隔为45°,圆盘12正中焊接一个用于起吊的吊耳16。圆盘12可均匀地开设圆孔120以减轻吊装卡具10自身的重量,此外开成圆孔的样式加工方便,样式美观。每一接头14上开设有线夹安装孔140,用于与导线线夹进行连接。吊耳16上开设有起吊孔160,方便绳索或其它起吊工具穿过。Please refer to FIGS. 1A and 1B , which are schematic diagrams of the structure of a
请结合参阅图2,其为吊装卡具10与导线线夹40装配之后的示意图。使用时,首先将导线线夹40与对应的接头14的安装孔140通过螺栓或其它紧固件进行安装固定。然后,将导线用对应的导线线夹40卡好。最后,通过起吊工具对吊耳16进行固定可将整个吊装卡具10、导线线夹40及线夹40内的导线一同起吊,即吊装卡具10可一次性将八根导线一同成功起吊。Please refer to FIG. 2 , which is a schematic view after the assembly of the
请参阅图3和图4,其为本实用新型的第二优选实施例吊装卡具20的结构示意图和吊装卡具20与导线线夹40装配后的示意图。当需同时起吊的导线为六根时,可采用图3中吊装卡具20。吊装卡具20与吊装卡具10的大致结构基本相同,包括圆盘22、接头24和吊耳26。不同之处在于,接头24的数量为6个,即每两个接头24之间的角度间隔为60°。同样地,接头24均匀地分布在圆盘22的圆周上,吊耳26焊接在圆盘22的正中,圆盘22均匀开设圆孔220以减轻吊装卡具20自身的重量,每一接头24上开设有线夹安装孔240,用于与导线线夹40进行连接,吊耳26上开设有起吊孔260以方便方便绳索或其它起吊工具穿过。使用时,吊装卡具20与吊装卡具10的使用方法相同,可一次性将六根导线同时起吊。Please refer to FIG. 3 and FIG. 4 , which are schematic diagrams of the structure of the hoisting
请参阅图5,其为本实用新型的第三优选实施例吊装卡具30的结构示意图。当需同时起吊的导线为四根时,可采用图4中吊装卡具30。吊装卡具30与吊装卡具10的大致结构基本相同,包括圆盘32、接头34和吊耳36。不同之处在于,接头34的数量为四个,即每两个接头34之间的角度间隔为90°。同样地,接头34均匀地分布在圆盘32的圆周上,吊耳36焊接在圆盘32的正中,圆盘32均匀开设圆孔320以减轻吊装卡具30自身的重量,每一接头34上开设有线夹安装孔340,用于与导线线夹40进行连接,吊耳36上开设有起吊孔360以方便方便绳索或其它起吊工具穿过。使用时,吊装卡具30与吊装卡具10和吊装卡具20的使用方法相同,可一次性将四根导线同时起吊。Please refer to FIG. 5 , which is a schematic structural diagram of a
通过对上述三个实施例的叙述可知,本实用新型的吊装卡具上接头的数目可根据需要同时起吊的导线根数来进行确定。It can be seen from the description of the above three embodiments that the number of joints on the lifting jig of the present utility model can be determined according to the number of wires that need to be lifted at the same time.
此外,吊装卡具的接头的样式是根据导线线夹的接头来进行设计的。若改变导线线夹,则吊装卡具的接头的样式可随之进行更改。本实用新型的吊装卡具的结构简单,配合导线线夹使用,可以将架空线路施工中的多分裂导线的跳线一次性起吊成功,改变传统的绳索绑扎起吊的吊装方法,可以提高施工效率和安全系数,在现场施工过程中更加方便、科学。In addition, the style of the joint of the lifting clamp is designed according to the joint of the wire clamp. If the wire clamp is changed, the style of the joint of the lifting fixture can be changed accordingly. The hoisting jig of the utility model has a simple structure and can be used together with wire clips to successfully hoist jumpers of multi-split wires in overhead line construction at one time, changing the traditional hoisting method of rope binding and hoisting, which can improve construction efficiency and The safety factor is more convenient and scientific during on-site construction.
本实用新型的跳线吊装卡具加工简单,使用方便,为特高压试验示范工程服务,具有重大意义,同时也可以借鉴到其他送电线路工程多分裂导线跳线吊装施工中。The wire jumper hoisting jig of the utility model is simple in processing and easy to use, and is of great significance for serving UHV test demonstration projects, and can also be used for reference in the hoisting construction of multi-split wire jumper wires in other power transmission line projects.
以上所述实施示例仅表达了本实用新型的部分实施方式,其描述较为具体和详细,但并不能因此而理解为对本实用新型专利范围的限制。应当指出的是,对于本领域的普通技术人员来说,在不脱离本实用新型构思的前提下,还可以做出若干变形和改进,这些都属于本实用新型的保护范围。因此,本实用新型专利的保护范围应以所附权利要求为准。The above-mentioned implementation examples only express some implementations of the present utility model, and the description thereof is relatively specific and detailed, but it should not be construed as limiting the patent scope of the present utility model. It should be noted that those skilled in the art can make several modifications and improvements without departing from the concept of the present invention, and these all belong to the protection scope of the present invention. Therefore, the scope of protection of the utility model patent should be based on the appended claims.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201220410273 CN202817600U (en) | 2012-08-17 | 2012-08-17 | Hoisting clamping apparatus for jumpers of multi-bundled conductors in overhead line construction |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201220410273 CN202817600U (en) | 2012-08-17 | 2012-08-17 | Hoisting clamping apparatus for jumpers of multi-bundled conductors in overhead line construction |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN202817600U true CN202817600U (en) | 2013-03-20 |
Family
ID=47876418
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN 201220410273 Expired - Lifetime CN202817600U (en) | 2012-08-17 | 2012-08-17 | Hoisting clamping apparatus for jumpers of multi-bundled conductors in overhead line construction |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN202817600U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104555702A (en) * | 2014-12-25 | 2015-04-29 | 国家电网公司 | Insulated hoisting support |
| CN107910804A (en) * | 2017-05-11 | 2018-04-13 | 国网浙江省电力公司湖州供电公司 | A kind of rotating disc type insulating bar hanger |
| CN105807099B (en) * | 2016-04-19 | 2018-08-31 | 浙江华电器材检测研究所有限公司 | Split conductor stringer |
-
2012
- 2012-08-17 CN CN 201220410273 patent/CN202817600U/en not_active Expired - Lifetime
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104555702A (en) * | 2014-12-25 | 2015-04-29 | 国家电网公司 | Insulated hoisting support |
| CN105807099B (en) * | 2016-04-19 | 2018-08-31 | 浙江华电器材检测研究所有限公司 | Split conductor stringer |
| CN107910804A (en) * | 2017-05-11 | 2018-04-13 | 国网浙江省电力公司湖州供电公司 | A kind of rotating disc type insulating bar hanger |
| CN107910804B (en) * | 2017-05-11 | 2020-01-10 | 国网浙江省电力公司湖州供电公司 | Rotating disc type insulating operating rod hanging frame |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN202817600U (en) | Hoisting clamping apparatus for jumpers of multi-bundled conductors in overhead line construction | |
| CN203967713U (en) | For the terminal clamping device of crane cable | |
| CN204150945U (en) | Track clamper and arc orbit rail clamping device | |
| CN202094528U (en) | Wire picking device for power transmission line construction | |
| CN205346627U (en) | Simple and easy quick fixed wire pole plays gallows | |
| CN202094562U (en) | Suspension type synchronous hoisting system for pipe type bus | |
| CN203850726U (en) | Wire lifter on 10 kV power distribution telegraph pole | |
| CN203806962U (en) | Cable terminal head lifting fixture | |
| CN202197048U (en) | Double angle steel hanging point lifting and connecting tool for tower use | |
| CN220317073U (en) | TRD shaped steel hoist and mount stability fixture and hoist thereof | |
| CN202429868U (en) | Novel hoisting and positioning device for prefabricated part | |
| CN103567922A (en) | Transformer fixture | |
| CN203607750U (en) | Suspension ring device for loosening-tightening line pulley | |
| CN203193189U (en) | Portable overhead ground wire lifting device | |
| CN103500963B (en) | A kind of suspension arrangement of " one leads four+one leads two " releasing pulley | |
| CN202737386U (en) | Insulator string fixing traction tool | |
| CN205595731U (en) | Strain wire clamp used for 10kV overhead power distribution line | |
| CN107706832B (en) | Rapid threading device in reinforcement cage and working method | |
| CN103286706A (en) | Movable plate clamp | |
| CN202627464U (en) | Steel pipe rod connection hoop | |
| CN203674590U (en) | Stand construction platform | |
| CN203367892U (en) | Automatic laying device for cables | |
| CN202949198U (en) | Paying-off pulley for cable overhead installation | |
| CN204835440U (en) | Suspension wire clip | |
| CN202872298U (en) | Clamping device of cable fixing device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| ASS | Succession or assignment of patent right |
Owner name: STATE ELECTRIC NET CROP. Effective date: 20130326 |
|
| C41 | Transfer of patent application or patent right or utility model | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20130326 Address after: Yang Yuansheng 430063 Hubei province Wuhan city Wuchang District Road No. 5 Patentee after: HUBEI ELECTRIC POWER TRANSMISSION & DISTRIBUTION ENGINEERING Co. Patentee after: State Grid Corporation of China Address before: Yang Yuansheng 430063 Hubei province Wuhan city Wuchang District Road No. 5 Patentee before: HUBEI ELECTRIC POWER TRANSMISSION & DISTRIBUTION ENGINEERING Co. |
|
| CX01 | Expiry of patent term | ||
| CX01 | Expiry of patent term |
Granted publication date: 20130320 |