CN202813750U - Double-heating chamber boiler - Google Patents

Double-heating chamber boiler Download PDF

Info

Publication number
CN202813750U
CN202813750U CN 201220436540 CN201220436540U CN202813750U CN 202813750 U CN202813750 U CN 202813750U CN 201220436540 CN201220436540 CN 201220436540 CN 201220436540 U CN201220436540 U CN 201220436540U CN 202813750 U CN202813750 U CN 202813750U
Authority
CN
China
Prior art keywords
heating chamber
chamber
combustion chamber
heating
boiler
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220436540
Other languages
Chinese (zh)
Inventor
郭丰亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 201220436540 priority Critical patent/CN202813750U/en
Application granted granted Critical
Publication of CN202813750U publication Critical patent/CN202813750U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Solid-Fuel Combustion (AREA)

Abstract

The utility model discloses a double-heating chamber boiler which comprises a heat preservation housing, a combustion chamber in the heat preservation housing, a fire grate below the combustion chamber, an ash deposit chamber below the fire grate, an ash discharge port at a side face of the ash deposit chamber, a blower communicated with the combustion chamber, a fire watching window at a side wall of the combustion chamber, a material feeding device communicated with the combustion chamber and a material feeding port on the material feeding device; and further comprises a first heating chamber and a second heating chamber above the combustion chamber, a hot water outlet communicated with the first heating chamber, a cold water inlet communicated with the second heating chamber, an exhaust gas emission passage at one side of the second heating chamber, and a water inlet connecting the first heating chamber and the second heating chamber. By using the double-heating chamber boiler of the utility model, heat of exhaust gas generated from combustion can be fully utilized, thereby raising heat efficiency of the boiler and saving energy.

Description

A kind of pair of heating clamber boiler
Technical field
The utility model relates to field of boilers, particularly relates to a kind of pair of heating clamber boiler.
Background technology
The global Energy Consumption total amount is constantly soaring, known to Baidupedia, reaches 1.2 hundred million thousand ten thousand tons of crude oil in 2008, is 2002 years 1.2 times.Developing country is becoming the main body of energy resource consumption.The average speedup of global energy consumption was 2.5% in 2000 to 2009, and developing country is 5.8%, exceeded global average level and was about 4 percentage points, and the Asia-Pacific of development is 5.4%, and by contrast, Europe only has 0.8%, and the U.S. only has 0.2%.Fast-developing China improves constantly energy demand, and Chinese energy consumption in 2008 is 2,002 hundred ten thousand tons of crude oil, accounts for 16% of global energy total amount consumed.Energy reserve and the industrial technology level of China have determined the dependence of energy resource consumption to traditional energy.Therefore, the development low-carbon economy adjusting under the limited condition of energy consumption structure, is not only reducing fossil energy consumption in a short time, and prior being improved efficiency of energy utilization, reduces " carbon emission " of unit output value.Therefore, focusing on of development low-carbon economy is that the development and utilization of new forms of energy and regenerative resource is the existing raising such as traditional energy service efficiencies such as coal oils, and the development and utilization of relevant green technology on the other hand on the one hand.
The utility model content
The technical problem that the utility model mainly solves provides a kind of pair of heating clamber boiler, can take full advantage of the heat in the tail gas that burning produces, and has improved the thermal efficiency of equipment, has saved the energy.
For solving the problems of the technologies described above, the technical scheme that the utility model adopts is: a kind of pair of heating clamber boiler is provided, comprise: insulation shell, combustion chamber in the insulation shell, the fire grate of combustion chamber below, ash accumulating chamber under the fire grate, the ash discharging hole of ash accumulating chamber side, the blower fan of connection combustion chamber, the sight fire window of combustion chamber sidewall, connect the pay-off of combustion chamber, the charging aperture on the described pay-off also comprises: the first heating chamber and second heating chamber of combustion chamber top, the hot water outlet that connects the first heating chamber, the cooling water inlet that connects the second heating chamber, the exhaust emissions passage of the second heating chamber side connects the water inlet of the first heating chamber and the second heating chamber.
In preferred embodiment of the utility model, described hot water exit has a temperature sensor.
In preferred embodiment of the utility model, also comprise a liquid level gauge in described the first heating chamber.
The beneficial effects of the utility model are: the utility model can take full advantage of the heat in the tail gas that burning produces, and has improved the thermal efficiency of equipment, has saved the energy.
Description of drawings
Fig. 1 is the perspective view of a kind of pair of heating clamber boiler one preferred embodiment of the utility model;
The mark of each parts is as follows in the accompanying drawing: 1, insulation shell, 2, combustion chamber, the 3, first heating chamber, 4, the second heating chamber, 5, fire grate, 6, ash accumulating chamber, 7, ash discharging hole, 8, blower fan, 9, see fiery window, 10, liquid level gauge, 11, pay-off, 12, cooling water inlet, 13, hot water outlet, 14, temperature sensor, 15, water inlet, 16, liquid level gauge, 17, the exhaust emissions passage.
The specific embodiment
Below in conjunction with accompanying drawing preferred embodiment of the present utility model is described in detail, thereby so that advantage of the present utility model and feature can be easier to be it will be appreciated by those skilled in the art that protection domain of the present utility model is made more explicit defining.
See also the perspective view of a kind of pair of heating clamber boiler one preferred embodiment of Fig. 1 the utility model, the utility model embodiment comprises:
A kind of pair of heating clamber boiler, comprise: insulation shell 1, combustion chamber 2 in the insulation shell, the fire grate 5 of combustion chamber below, ash accumulating chamber 6 under the fire grate, the ash discharging hole 7 of ash accumulating chamber side, the blower fan 8 that connects combustion chamber 2, the sight fire window 9 of combustion chamber 2 sidewalls, connect the pay-off 11 of combustion chamber 2, the charging aperture 10 on the described pay-off also comprises: the first heating chamber 3 of combustion chamber 2 tops and the second heating chamber 4, the hot water outlet 13 that connects the first heating chamber 3, the exhaust emissions passage 17 that connects cooling water inlet 12, the second heating chamber sides of the second heating chamber 4 connects the water inlet 15 of the first heating chamber 3 and the second heating chamber 4, the tail gas that combustion chamber 2 produces enters exhaust emissions passage 17, realizes exchange heat with the water in the second heating chamber 4.
Further, there is a temperature sensor 14 at described hot water outlet 13 places, are used for monitoring the temperature of the first heating chamber 3 interior hot water.
Further, also comprise a liquid level gauge 16 in described the first heating chamber 3, be used for monitoring the water level in the first heating chamber.
Compared with prior art, the utility model is many second heating chamber 4, described the second heating chamber 4 heats by the waste heat in the exhaust emissions passage 17, when the water level in the first heating chamber 3 is low, send into cold water to the second heating chamber 4 from cooling water inlet 12, original hot water is mixed into warm water in the cold water of newly sending into and the second heating chamber, and flows into the first heating chamber 3 from the water inlet 15 of top, has improved the heat utilization efficiency of system.
The above only is embodiment of the present utility model; be not so limit claim of the present utility model; every equivalent structure or equivalent flow process conversion that utilizes the utility model specification and accompanying drawing content to do; or directly or indirectly be used in other relevant technical fields, all in like manner be included in the scope of patent protection of the present utility model.

Claims (3)

1. two heating clamber boiler, comprise: insulation shell (1), combustion chamber (2) in the insulation shell, the fire grate (5) of combustion chamber below, ash accumulating chamber under the fire grate (6), the ash discharging hole of ash accumulating chamber side (7), the blower fan (8) that connects combustion chamber (2), the sight fire window (9) of combustion chamber (2) sidewall, the pay-off (11) that connects combustion chamber (2), charging aperture on the described pay-off (10) is characterized in that, also comprises: first heating chamber (3) and the second heating chamber (4) of combustion chamber (2) top, the hot water outlet (13) that connects the first heating chamber (3), the cooling water inlet (12) that connects the second heating chamber (4), the exhaust emissions passage (17) of the second heating chamber (4) side connects the water inlet (15) of the first heating chamber (3) and the second heating chamber (4).
2. a kind of pair of heating clamber boiler according to claim 1 is characterized in that, described hot water outlet (13) has been located a temperature sensor (14).
3. a kind of pair of heating clamber boiler according to claim 1 is characterized in that, also comprises a liquid level gauge (16) in described the first heating chamber (3).
CN 201220436540 2012-08-30 2012-08-30 Double-heating chamber boiler Expired - Fee Related CN202813750U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220436540 CN202813750U (en) 2012-08-30 2012-08-30 Double-heating chamber boiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220436540 CN202813750U (en) 2012-08-30 2012-08-30 Double-heating chamber boiler

Publications (1)

Publication Number Publication Date
CN202813750U true CN202813750U (en) 2013-03-20

Family

ID=47872613

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220436540 Expired - Fee Related CN202813750U (en) 2012-08-30 2012-08-30 Double-heating chamber boiler

Country Status (1)

Country Link
CN (1) CN202813750U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104949346A (en) * 2015-06-25 2015-09-30 芜湖鸣人热能设备有限公司 Heat energy water boiler

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104949346A (en) * 2015-06-25 2015-09-30 芜湖鸣人热能设备有限公司 Heat energy water boiler

Similar Documents

Publication Publication Date Title
CN101793433B (en) Hot-air air conditioner using biomass fuel
CN202133096U (en) Energy-saving low pressure hot water boiler
CN202813750U (en) Double-heating chamber boiler
CN202203970U (en) Secondary energy saving and utilizing device for furnace exhaust gas waste heat
CN102330966B (en) Energy-saving heat-supplying device of condensation steam boiler
CN202328178U (en) Energy-saving and emission-reducing combustion boiler device
CN104359142A (en) Heat accumulation type solar, electric and coal firing heat combined heating source system
CN203928382U (en) A kind of combustion gas vacuum hot water unit
CN204214136U (en) Heat conducting oil boiler waste heat recovery device
CN204007180U (en) A kind of waste gas residual heat recycling and processing device
CN102853532A (en) Boiler with double heating chambers
CN203396100U (en) Inversely-arranged stainless steel condensing type gas water heater
CN202973534U (en) Boiler heat supplying device
CN201637097U (en) Hot air conditioner using biomass fuel
CN201680592U (en) Water temperature preheating device of gas water heater
CN202125941U (en) Horizontal backfire coal burning boiler with double-layer water pipe grate
CN204830960U (en) Water side adopts heat pipe energy -saving appliance of fin
CN103629817A (en) Biomass vacuum boiler
CN204806367U (en) Utilize boiler economizer of hydrophobic heating cold wind
CN203443097U (en) Energy-saving environment-friendly boiler
CN202692237U (en) Warm air furnace
CN203595279U (en) Biomass vacuum boiler
CN204757352U (en) Small -size civilian intelligent environmental protection and energy saving boiler
CN203560878U (en) Condensing type steam boiler
CN211261252U (en) Novel biomass boiler

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130320

Termination date: 20130830