CN202805067U - Broken belt connecting device for silicon steel continuous drawing heat treatment unit - Google Patents
Broken belt connecting device for silicon steel continuous drawing heat treatment unit Download PDFInfo
- Publication number
- CN202805067U CN202805067U CN201220467230.5U CN201220467230U CN202805067U CN 202805067 U CN202805067 U CN 202805067U CN 201220467230 U CN201220467230 U CN 201220467230U CN 202805067 U CN202805067 U CN 202805067U
- Authority
- CN
- China
- Prior art keywords
- broken belt
- heat treatment
- treatment unit
- steel plate
- plate groove
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Heat Treatments In General, Especially Conveying And Cooling (AREA)
Abstract
The utility model discloses a broken belt connecting device for a silicon steel continuous drawing heat treatment unit. The broken belt connecting device comprises a support frame, a lower clamp plate connected to the upper end of the support frame, an upper clamping plate hinged with one end of the lower clamping plate, a locking bar connected with the other end of the upper clamping plate and a lock catch arranged on the other end of the lower clamping plate and matched with the locking bar, wherein a steel plate groove I is arranged in the lower clamping plate, and a connecting and positioning groove I is arranged in the clamping plate groove; and a steel plate groove II corresponding to the steel plate groove I in the location and the shape is arranged in the upper clamping plate, and a connecting and positioning groove II corresponding to the connecting and positioning groove I is arranged in the steel plate groove II. The broken belt connecting device for the silicon steel continuous drawing heat treatment unit has the advantages of rapidness and convenience for connecting a broken belt, greatly lightened labor intensity, reliable and attractive connecting quality of the broken belt, simple structure and easy operation.
Description
Technical field
The utility model relates to a kind of steel plate jockey, specifically belongs to a kind of broken belt jockey for the continuously elongated heat treatment unit of silicon steel.
Background technology
In process of production, the broken belt accident occurs in silicon steel plate sometimes in the heat treatment unit, and at this moment, the steel band that must will rupture is connected, and requires to finish efficiently, in high quality tape splicing work under the prerequisite of safety, reduces loss due to spoiled work.At present, when this broken belt accident occured, the mode that all adopts crawl and artificial traction was overlapping and be placed on the plank with two broken ends, tramps with one's feet and fixes, and then manually makes a call to two rounds, wore the iron wire seam that will break end.The deficiency of its existence:
1) dangerous.When stepping on fixedly steel band by artificial pin, can produce steel band and be pulled because of certain situation, can cause the people injured; In the seam steel band, operating personnel since to stir up and down steel band with iron wire from one side through another side, scratch easily operating personnel, have hidden danger;
2) efficient is low.Owing to will lean on manually and beat connecting hole at plank, labour intensity is large, both wasted time and energy, and when stitching steel band, threading is slow, causes connecting the broken belt inefficiency;
3) the tape splicing quality is not good enough.It is irregular lack of standardization to punch, and affects presentation quality, even also can cause the tape splicing head again to disconnect;
4) waste product is increased.Have artificial pin to step on and fixing steel band, can make steel band produce very long one section and crease, this a part of steel band can become waste product and can't use, and reduces qualification rate.
The utility model content
The purpose of this utility model is to overcome the deficiency that prior art exists, provide a kind of broken belt connect quick and easy, alleviate hand labor intensity in a large number, the broken belt quality of connection is reliable and attractive in appearance, simple in structure, the broken belt jockey that is used for the continuously elongated heat treatment unit of silicon steel easy to operate, as to eliminate safe hidden trouble.
Realize the technical measures of above-mentioned purpose:
The broken belt jockey that is used for the continuously elongated heat treatment unit of silicon steel, it comprises bracing frame, is connected in the lower plate of bracing frame upper end, be the train wheel bridge that is articulated and connected with lower plate one end, the locking bar that is connected at the train wheel bridge other end, at the snap close that cooperates with locking bar of the other end setting of lower plate; Be provided with steel plate groove one at lower plate, be provided with connection locating slot one at the clamping plate groove; Be provided with the steel plate groove two corresponding with steel plate groove one position and shape at train wheel bridge, be provided with the connection locating slot two corresponding with connecting locating slot one at steel plate groove two.
It is characterized in that: connect locating slot one or connect locating slot two on the steel plate groove one of correspondence or steel plate groove two per four be one group, two of every sides and relative layouts in each group.
It is characterized in that: be connected with the enhancing bar on the bracing frame.
It is characterized in that: train wheel bridge is provided with anti-slip tank or non-slipping block.
Characteristics of the present utility model are:
When 1) fixing two broken ends, need not manually to step on steel band, not only guaranteed personal safety, and greatly reduced labour intensity;
2) improved the steel band qualification rate, namely each tape splicing almost produces without waste product, and waste product reduced 100 kilograms at least than originally;
3) the neat standard of the connecting hole on the steel band presentation quality of junction is improved, and joint is firm, can not produce obscission;
4) efficient that connects broken belt has improved at least 50%, and namely need only be shortened in 2 hours by original tape splicing needs 1 hour;
5) simple in structure, easy to operate, and easy to carry.
Description of drawings
Fig. 1 is structural representation of the present utility model
Among the figure: 1-bracing frame, 2-lower plate, 3-steel plate groove one, 4-connection locating slot one, 5-locking bar, 6-train wheel bridge, 7-steel plate groove two, 8-connection locating slot two, 9-snap close, 10-enhancing bar, 11-anti-slip tank or non-slipping block, 12-bearing pin or latch.
The specific embodiment
Be described further below in conjunction with accompanying drawing:
The broken belt jockey that is used for the continuously elongated heat treatment unit of silicon steel: adopt welding or bolt to connect lower plate 2 in bracing frame 1 upper end, machined steel board slot 1 on the lower plate 2, and at two long sides of steel plate groove 1 to becoming processing to connect locating slot 1, adopt welding or embed at the other end of lower plate 2 to connect locking bar 5; Adopt bearing pin or latch to connect train wheel bridge 6 at an end of lower plate 2, machined steel board slot 27 on train wheel bridge 6, and at two long sides of steel plate groove 27 to becoming processing to connect locating slot 28, connect the snap close 9 that cooperates with locking bar 5 at train wheel bridge 6 other ends.Be strong degree and the aesthetic property that further guarantees to connect, with connect locating slot 1 or connect locating slot 28 on the steel plate groove 1 of correspondence or steel plate groove 27 per four to be made as be one group, two of every sides and relative layouts in each group make each tie point of broken belt junction become X-shaped and get final product; For making the firm of bracing frame 1, be connected with enhancing bar 10 in bracing frame 1 welding or bolt; For guaranteeing operating personnel's safety, be processed with anti-slip tank or non-slipping block 11 at train wheel bridge 6.
Operating principle
Carry out broken belt when connecting, locking bar 5 is thrown off from snap close 9, train wheel bridge 6 is opened around bearing pin or latch 12, at this moment, will connect broken belt and place on the lower plate 2, and make the termination that will connect broken belt in alignment with the midline position of steel plate groove 1; Being pressed in train wheel bridge 6 on the broken belt that will connect and locking bar 5 is assemblied in the snap close 9 makes steel plate compacted; The connection locating slot 28 punching press connecting hole on steel plate by arranging on the train wheel bridge 6 again pierces into iron wire and passes from these holes, make every group of tie point form X-shaped.After connecting end, make locking bar 5 throw off snap closes 9, train wheel bridge 6 is opened, the steel plate that fech connection is good gets final product.
Claims (4)
1. be used for the broken belt jockey of the continuously elongated heat treatment unit of silicon steel, it is characterized in that: it comprises bracing frame, is connected in the lower plate of bracing frame upper end, be the train wheel bridge that is articulated and connected with lower plate one end, the locking bar that is connected at the train wheel bridge other end, at the snap close that cooperates with locking bar of the other end setting of lower plate; Be provided with steel plate groove one at lower plate, be provided with connection locating slot one at the clamping plate groove; Be provided with the steel plate groove two corresponding with steel plate groove one position and shape at train wheel bridge, be provided with the connection locating slot two corresponding with connecting locating slot one at steel plate groove two.
2. the broken belt jockey for the continuously elongated heat treatment unit of silicon steel as claimed in claim 1, it is characterized in that: connect locating slot one or connect locating slot two on the steel plate groove one of correspondence or steel plate groove two per four be one group, two of every sides and relative layouts in each group.
3. the broken belt jockey for the continuously elongated heat treatment unit of silicon steel as claimed in claim 1 is characterized in that: be connected with the enhancing bar on the bracing frame.
4. the broken belt jockey for the continuously elongated heat treatment unit of silicon steel as claimed in claim 1, it is characterized in that: train wheel bridge is provided with anti-slip tank or non-slipping block.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201220467230.5U CN202805067U (en) | 2012-09-14 | 2012-09-14 | Broken belt connecting device for silicon steel continuous drawing heat treatment unit |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201220467230.5U CN202805067U (en) | 2012-09-14 | 2012-09-14 | Broken belt connecting device for silicon steel continuous drawing heat treatment unit |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202805067U true CN202805067U (en) | 2013-03-20 |
Family
ID=47864010
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201220467230.5U Expired - Lifetime CN202805067U (en) | 2012-09-14 | 2012-09-14 | Broken belt connecting device for silicon steel continuous drawing heat treatment unit |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202805067U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104384364A (en) * | 2014-07-29 | 2015-03-04 | 西安理工大学 | Device and method for riveting broken color coating strip coil steel plate |
-
2012
- 2012-09-14 CN CN201220467230.5U patent/CN202805067U/en not_active Expired - Lifetime
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104384364A (en) * | 2014-07-29 | 2015-03-04 | 西安理工大学 | Device and method for riveting broken color coating strip coil steel plate |
CN104384364B (en) * | 2014-07-29 | 2016-08-24 | 西安理工大学 | The device riveted after coloured coating band coiled steel plate broken belt and clinching method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202805067U (en) | Broken belt connecting device for silicon steel continuous drawing heat treatment unit | |
CN202098968U (en) | Dedicated lifting appliance for balance beam of gantry crane | |
CN201144633Y (en) | 220kv multifunctional overhaul ladder | |
CN205519363U (en) | Copper wire bending apparatus | |
CN209710976U (en) | Trees felling orientation bracket | |
CN204863540U (en) | Novel milk cow practise midwifery apparatus | |
CN204905764U (en) | Novel unwrapping wire has a power failure and turns over line device | |
CN202706749U (en) | Device for connecting building safety protection door and scaffold | |
CN213449395U (en) | General stable scaffold frame of gate-type | |
CN208423628U (en) | Cross tractor | |
CN114843973A (en) | Rapid fixing device and method for overhead conductor | |
CN203867453U (en) | Lock head type ladder stand | |
CN208502296U (en) | The safe rope support of steel structure high-altitude operation | |
CN208749208U (en) | Communicate shaft tower | |
CN205577598U (en) | Improvement type security fence | |
CN205867456U (en) | Portable climbers of climbing tree | |
CN110441134A (en) | The clamping tooling and detection method of cross spot welding workpiece tensile property detection | |
CN205863747U (en) | A kind of disconnecting link overhaul support platform | |
CN204840721U (en) | Safety belts | |
CN205273155U (en) | Car battery wraps fixing device | |
CN210592588U (en) | Packing device for packing goods | |
CN108612330A (en) | The safe rope support of steel structure high-altitude operation and its construction method of installation | |
CN215717453U (en) | Oblique roofing construction safety device | |
CN219355143U (en) | Anti-falling hanging plate device for iron tower foot nails | |
CN211620408U (en) | Dry quenching steel wire rope connecting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20170711 Address after: 430083 Qingshan District, Hubei, Wuhan factory before the door No. 2 Patentee after: WUHAN IRON AND STEEL Co.,Ltd. Address before: 430080 Wuhan, Hubei Friendship Road, No. 999, Wuchang Patentee before: WUHAN IRON AND STEEL (GROUP) Corp. |
|
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20130320 |