CN202788940U - Underground gas storage grotto in anticline geologic structure - Google Patents

Underground gas storage grotto in anticline geologic structure Download PDF

Info

Publication number
CN202788940U
CN202788940U CN 201220382955 CN201220382955U CN202788940U CN 202788940 U CN202788940 U CN 202788940U CN 201220382955 CN201220382955 CN 201220382955 CN 201220382955 U CN201220382955 U CN 201220382955U CN 202788940 U CN202788940 U CN 202788940U
Authority
CN
China
Prior art keywords
anticline
gas storage
underground gas
grotto
geologic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220382955
Other languages
Chinese (zh)
Inventor
刘宁
陈丽芬
陈益民
邬远祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hydrochina East China Engineering Corp
Original Assignee
Hydrochina East China Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hydrochina East China Engineering Corp filed Critical Hydrochina East China Engineering Corp
Priority to CN 201220382955 priority Critical patent/CN202788940U/en
Application granted granted Critical
Publication of CN202788940U publication Critical patent/CN202788940U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The utility model relates to an underground gas storage grotto in an anticline geologic structure and aims at providing the underground gas storage grotto in the anticline geologic structure, wherein the underground gas storage grotto in the anticline geologic structure is small in engineering investment and construction difficulties and remarkable in economical benefits, so that the underground gas storage grotto is not limited by the geologic condition of salt rocks, facilitates popularization and promotes development of compressed air energy accumulation. The technical scheme includes that the underground gas storage grotto in the anticline geologic structure is characterized in that the underground gas storage grotto is placed in rocks with the anticline geologic structure, high porosity and high permeability, the grotto is placed on the core portion of the anticline and the upper portion of the rocks of the anticline geologic structure and the lower portion of the rocks of the anticline geologic structure are saturated with injected water. The underground gas storage grotto in the anticline geologic structure is applicable to the field of the compressed air energy accumulation.

Description

Underground gas storage cavern in a kind of Anticline Geologic
Technical field
The utility model relates to a kind of compressed-air actuated gas storage cavern, the underground gas storage cavern in especially a kind of Anticline Geologic.Be applicable to the compressed-air energy storage field.
Background technology
Compressed-air energy storage is a kind of new electric energy storing technology, is the electric energy storing system that can realize large capacity and long-time power storage.It when needed, discharges pressure-air by decompressor acting generating by the unnecessary electric energy of compressed-air-storing.Compressed-air actuated gas storage cavern, although structure is fairly simple, very crucial.The common addressing in this gas storage cavern also can utilize existing or discarded mine, tunnel etc. underground, yet must guarantee the high pressure sealing of gas storage cavern.In order to guarantee the tightness of structure, can adopt the rubber back boxing, also can adopt the mode of water seal, reduce cost.
Since the underground gas storage cavern have volume large, bear the high characteristics of pressure, the gas storage cavern in the compressed-air energy storage power station of abroad having moved at present is positioned at the rock salt area mostly, utilize water filling that salt is dissolved and to form the cavity, has preferably tightness, and low cost, but must have this geological conditions.If there is not this suitable geological conditions, need artificial reconstructed or the construction gasholder, cost will increase greatly.The relevant expert in Hubei, the ground such as Qinghai, the Inner Mongol, Gansu carried out geological survey, did not temporarily find suitable geological conditions, became one of key issue of restriction China development compressed-air energy storage.
Summary of the invention
The technical problems to be solved in the utility model is: for the problem of above-mentioned existence, the underground gas storage cavern that a kind of construction investment is few, difficulty of construction is little, the Anticline Geologic of remarkable in economical benefits is interior is provided, so that the underground gas storage cavern is not subjected to the restriction of rock salt geological conditions, be convenient to promote, promote the development of compressed-air energy storage.
The technical scheme that the utility model adopts is: the underground gas storage cavern in a kind of Anticline Geologic, it is characterized in that: described underground gas storage cavern be arranged on have Anticline Geologic, in the rock of high porosity and high osmosis, the cavern is located at the nuclear section of anticline, and water filling is saturated in the overlying rock of Anticline Geologic and rock stratum, bottom.
Described overlying rock and rock stratum, bottom are through grouting treatment.
Described overlying rock and rock stratum, bottom are equipped with geomembrane.
Apply curtain grouting around the described cavern.
Be provided with the turnover gas well between described Mass Near The Top of Underground Cavity and the ground.
The beneficial effects of the utility model are: 1, the utility model utilizes this Geologic Structure Feature storing compressed air of anticline, has overcome and has utilized merely rock salt as the restriction of gas storage; 2, by guaranteeing to improve the tightness of gas storage cavern to overlying rock and the water filling of rock stratum, bottom; 3, the total form takes full advantage of the physical characteristic of Geologic Structure Feature and rock stratum, utilizes degree high, cost saving, and be conducive to popularize, can provide new mentality of designing for construction and the popularization in compressed-air energy storage power station.
Description of drawings
Fig. 1 is structural representation of the present utility model.
The specific embodiment
Under the powerful squeezing action of crustal movement, plastic strain can occur in the rock stratum, produces a series of wavy bending, is called fold.The base unit of fold is fold, and fold has two kinds of grown forms, and a kind of is to tiltedly, and a kind of is anticline.Generally be the bending that projects upwards on the anticline profile wherein, the rock stratum is outward-dipping from the center, and nuclear section is old rock stratum, and both wings are new rock stratum.The trend of anticline rock stratum is natural arch, and Stability Analysis of Structures is stressed even, and is difficult for storing underground water, constructability.
As shown in Figure 1, present embodiment is a kind of underground gas storage cavern that utilizes this special geological structure of anticline and saturated rock to come storing compressed air, cavern 1 is located at the nuclear section of anticline, and water filling is saturated in the overlying rock 2 of Anticline Geologic and rock stratum, bottom 3, to stop the leakage of air, guarantee the tightness of cavern, and play the effect of regulating cavern's volume and pressure.Between 1 top, cavern and ground, be provided with two turnover gas wells 4 in this example, can by this pass in and out gas well with air compressing to the cavern in 1 or in the cavern, discharge.
The specific implementation method of present embodiment is as follows:
1, at first carry out geological exploration, the trend of clear and definite geological structure, particularly arch structure and length, and the rock stratum attribute in the anticline are preferably high porosity, high osmosis rock;
2, according to compressed-air actuated volume and definite volume and the buried depth that stores the cavern of pressure;
3, excavation underground gas storage cavern 1 in anticlinal nucleus;
4, overlying rock 2 and 3 water fillings of rock stratum, bottom of arch structure are saturated, improve the tightness of whole gas storage cavern, prevent air leakage.
In order to guarantee the water content in the rock stratum, can be by in overlying rock 2 and rock stratum, bottom 3, being in the milk, installing geomembrane, applying the mode such as curtain grouting around in the cavern and prevent that the current in the rock stratum from losing.

Claims (5)

1. the underground gas storage cavern in the Anticline Geologic, it is characterized in that: described underground gas storage cavern be arranged on have Anticline Geologic, in the rock of high porosity and high osmosis, cavern (1) is located at the nuclear section of anticline, and water filling is saturated in the overlying rock (2) of Anticline Geologic and rock stratum, bottom (3).
2. the underground gas storage cavern in the Anticline Geologic according to claim 1, it is characterized in that: described overlying rock (2) and rock stratum, bottom (3) are through grouting treatment.
3. the underground gas storage cavern in the Anticline Geologic according to claim 2, it is characterized in that: described overlying rock (2) and rock stratum, bottom (3) are equipped with geomembrane.
4. the underground gas storage cavern in the Anticline Geologic according to claim 1, it is characterized in that: described cavern (1) applies curtain grouting all around.
5. the underground gas storage cavern in the described Anticline Geologic of any one is characterized in that: be provided with turnover gas well (4) between (1) top, described cavern and the ground according to claim 1-4.
CN 201220382955 2012-08-03 2012-08-03 Underground gas storage grotto in anticline geologic structure Expired - Lifetime CN202788940U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220382955 CN202788940U (en) 2012-08-03 2012-08-03 Underground gas storage grotto in anticline geologic structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220382955 CN202788940U (en) 2012-08-03 2012-08-03 Underground gas storage grotto in anticline geologic structure

Publications (1)

Publication Number Publication Date
CN202788940U true CN202788940U (en) 2013-03-13

Family

ID=47816215

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220382955 Expired - Lifetime CN202788940U (en) 2012-08-03 2012-08-03 Underground gas storage grotto in anticline geologic structure

Country Status (1)

Country Link
CN (1) CN202788940U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105334544A (en) * 2015-11-27 2016-02-17 榆林学院 Device for detecting underground hole through compressed air and detecting method
CN114458380A (en) * 2022-02-17 2022-05-10 北京中海能大储能技术有限公司 Method for storing energy by utilizing compressed air in underground waste space

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105334544A (en) * 2015-11-27 2016-02-17 榆林学院 Device for detecting underground hole through compressed air and detecting method
CN114458380A (en) * 2022-02-17 2022-05-10 北京中海能大储能技术有限公司 Method for storing energy by utilizing compressed air in underground waste space

Similar Documents

Publication Publication Date Title
AU2017408795B2 (en) Method of utilizing downhole roadway in coal mine for compressed air energy storage
CN104763449B (en) A kind of underground water seal cave depot water curtain system method for designing
CN102937011B (en) Mash gas pumping drilling group regional crack field secondary grouting plugging device and method
CN105003299B (en) A kind of gob side entry retaining flexible filling bag and its application method
CN106988780B (en) A kind of girdle goaf paste body filling construction method
CN103195390A (en) Mining-coal bed nearly horizontal gas extraction borehole sealing method
CN102561989A (en) Coal mine underground hydraulic fracturing hole sealing method
CN112727535A (en) Liquid CO2Coal body cracking and permeability increasing method with cooperative drilling and water filling
CN108678721A (en) Packaged type hydraulic fracturing and injection hole sealing integrated apparatus and its construction method
CN102808641A (en) Compression resistant air door in underground mine
CN102102518B (en) Top coal caving coordinated mining method for thick coal seam under dam body of reservoir
CN205176021U (en) Tunnelling simulation modeling experiment device
CN202788940U (en) Underground gas storage grotto in anticline geologic structure
CN208653679U (en) A kind of hydrofracturing detecting earth stress unit protection device
CN202132053U (en) VI-level surrounding-rock double track tunnel lining support structure
CN109779634A (en) Coal mine ground vertical well pressure break tight roof location determining method
CN202466345U (en) Karst foundation solidifying structure of high speed railway
CN206562937U (en) A kind of colliery driving suspension device with regulatory function
CN106979033B (en) A kind of high goaf paste body filling construction method of thick seam large mining
CN106801609B (en) A method of with jack up ∏ shape steel tube concrete support system gob side entry retainings
Li et al. Failure mechanism and support system of roofs in advance areas affected by mining under the condition of soft rock stratum
CN214997812U (en) Anti-bottom-bulging flexible film bag device
CN204356797U (en) The pull-up Cantilever Retaining Wall structure of anchor
CN106368717A (en) Tunnel collapse-prevention supporting structure
CN202946099U (en) Gas extraction drill hole group regional fracture field secondary grouting plugging device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20130313