CN202787190U - 一种高流速龙口的抛石合龙方法所用的框架 - Google Patents

一种高流速龙口的抛石合龙方法所用的框架 Download PDF

Info

Publication number
CN202787190U
CN202787190U CN 201220163649 CN201220163649U CN202787190U CN 202787190 U CN202787190 U CN 202787190U CN 201220163649 CN201220163649 CN 201220163649 CN 201220163649 U CN201220163649 U CN 201220163649U CN 202787190 U CN202787190 U CN 202787190U
Authority
CN
China
Prior art keywords
barrier
framework
closure
height
downstream
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220163649
Other languages
English (en)
Inventor
卢永金
李锐
刘新成
徐世昌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI QINGCAOSHA INVESTMENT CONSTRUCTION DEVELOPMENT Co Ltd
Shanghai Investigation Design and Research Institute Co Ltd SIDRI
Shanghai Water Engineering Design and Research Institute Co Ltd
Original Assignee
Shanghai Water Engineering Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Water Engineering Design and Research Institute Co Ltd filed Critical Shanghai Water Engineering Design and Research Institute Co Ltd
Priority to CN 201220163649 priority Critical patent/CN202787190U/zh
Application granted granted Critical
Publication of CN202787190U publication Critical patent/CN202787190U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

本实用新型公开的一种高流速龙口的抛石合龙方法所用的框架,其为六面体框架,高度与截流设计高水位相当,具有顶面、底面、上、下游迎流面、第一、第二侧立面,底面和顶面是透空的,上、下游迎流面成斜坡,框架的顶面顺流向宽度为框架高度与截流后龙口两侧水位差之和;在框架的上、下游迎流面上分别设有第一、第二阻拦网;在框架的第一侧立面靠近上、下游迎流面位置设有与上、下游迎流面边缘连接的第三、第四阻拦网,并在该第一侧立面靠近底板面位置设有第五阻拦网,在框架的第二侧立面靠近上、下游迎流面位置设有与上、下游迎流面边缘连接的第六、第七阻拦网。本实用新型解决了大型高流速龙口采用块石或混凝土块体难以稳定和快速的截流问题。

Description

一种高流速龙口的抛石合龙方法所用的框架
技术领域
本实用新型涉及水利施工方法及用具,特别涉及一种适用于将潮汐作用的水域或滩涂圈围成陆或封闭水域,或江河筑坝合龙截流的高流速龙口的抛石合龙方法所用的框架。 
背景技术
潮汐区圈围或江河截流的合龙过程,往往在龙口上有较大的水位差和较高的流速,合龙材料(块石,混凝土块体、充泥管袋等)难以稳定,施工困难,合龙过程人力与机械的安全风险也很高,往往不得不采取一些极端的措施,造价很高。 
实用新型内容
本实用新型所要解决的技术问题在于针对潮汐区圈围或江河截流的合龙过程所存在的问题而提供一种用框架集积散抛石块石的高流速龙口的抛石合龙方法所用的框架。该框架既解决了小块石抗冲能力差的问题,又解决了特大块石或混凝土块体吊运困难的问题;框架上可铺行车道板解决平堵合龙的交通问题,也可船上抛石;一般情况下本工艺比常规工艺更经济,施工更安全。 
本实用新型所要解决的技术问题可以通过以下技术方案来实现: 
一种高流速龙口的抛石合龙方法所用的框架,为一六面体框架,该六面体框架具有顶面、底面、上、下游迎流面、第一侧立面和第二侧立面,其中底面和顶面是透空的,该六面体框架的高度与截流设计高水位相当;所述上、下游迎流面成斜坡,所述框架的顶面顺流向宽度为框架高度与截流后龙口两侧水位差之和;在所述框架的上、下游迎流面上分别设置有第一阻拦网和第二阻拦网;在所述框架的第一侧立面靠近上、下游迎流面位置设置有与上、下游迎流面边缘连接的第三阻拦网和第四阻拦网,并在该第一侧立面靠近底板面位置设置有第五阻拦网,在所述框架的第二侧立面靠近上、下游迎流面位置设置有与上、下游迎流面边缘连接的第六阻拦网和第七阻拦网。 
所述上、下游迎流面与底面之间的夹角为70°~85°。 
所述第一阻拦网和第二阻拦网高度分别小于框架的上、下游迎流面的高度。 
所述第三阻拦网、第四阻拦网的宽度为1m,高度与第一侧立面高度相同,第六阻拦网和第七阻拦网的宽度为1m,高度与第二侧立面高度相同。 
所述第五阻拦网的两端与所述第三阻拦网和第四阻拦网相连接,高度为框架高度的1/4。 
所述第一阻拦网、第二阻拦网、第三阻拦网、第四阻拦网、第五阻拦网、第六阻拦网和第七阻拦网均为钢筋网或高强度土工合成材料网。 
本实用新型的抛石合龙方法解决了大型高流速龙口采用块石或混凝土块体难以稳定的问题和快速截流问题。 
附图说明
图1为本实用新型的框架立体结构示意图。 
具体实施方式
为使本实用新型实现的技术手段、创作特征、达成目的与功效易于明白了解,下面结合具体图示,进一步阐述本实用新型。 
参见图1,图中给出的框架100为一六面体框架,该六面体框架具有顶面110、底面120、上、下游迎流面130、140、第一侧立面150和第二侧立面160,其中底面120和顶面110是透空的,尤其是底面120除加劲梁勒之外有不少于70%的透空面积,以满足框架100内的抛石与龙口基础上的护底块石自由咬合。 
该六面体框架的高度与截流设计高水位相当。框架100的上、下游迎流面130、140成与底面120之间的夹角为70°~85°的斜坡,这样可以增加框架100的底面120宽度,有利于稳定。 
框架100的顶面110顺流向宽度为框架100高度与截流后龙口两侧水位差之和。 
在框架100的上、下游迎流面130、140上分别设置有阻拦网131、141,以阻止框架100内块石流失;阻拦网131、141的高度分别小于框架100的上、下游迎流面130、140的高度。 
在框架100的第一侧立面150靠近上、下游迎流面130、140位置设置有与上、下游迎流面130、140边缘连接的阻拦网151、152,阻拦网151、152的宽度为1m,在该第一侧立面150靠近底面120位置设置有阻拦网153,阻拦网153的高度为框架高度的1/4。在框架100的第二侧立面160靠近上、下游迎流面130、140位置设置有与上、下游迎流面130、140边缘连接的阻拦网161、162。阻拦网161、162的宽度为1m。本实用新型在第一侧立面150和第二侧立面160上设置不同的阻挡网,这样可以在框架100吊装到截流坝位置时不出错,即框架100吊装时,下一个框架100的第二侧立面160与上一个框架100的第一侧立面150对接。本实用新型在第一侧立面150和第二侧立面160上设置阻挡网151、152、153、161、162的主要目的一是为防止此初期抛石由框架100的第一侧立面150和第二侧立面160流失;二是可以使框架100安放初期稳定压载抛石厚度达到框架100高度的1/4。 
上述阻挡网151、152、153、161、162均为钢筋网或高强度土工合成材料网。 
采用本实用新型的框架100对潮汐区圈围或江河截流的龙口合龙时,其首先在龙口基础(护底)构建后,在适宜的时机,即潮差小、无台风浪影响的时段,且整个龙口框架全部安放完成的时机设定在一个天文月中的小潮汛之初或之前,将预制的框架吊装到截流坝位置,整齐排列成一条龙;每一个框架100安装前需在该框架100内抛石压载。抛石压载的高度为框架高度的1/4。 
然后进行正式截流。开始正式截流,从由框架一字排列的龙首尾的一端或两端开始向龙身中段抛块石推进,进行立堵或平堵直至合龙。还可以结合船吊抛石在龙身段多点作业,以加快截流进度。截流后迅速加固框架100傍宽至与框架高度相当。其中立堵是指由框架100一字排列的龙首尾的一端或两端或一端抛石出水后逐步龙身中段推进。平堵是指在每一框架100中抛石至一定厚度后,在框架顶铺设走道板,车辆在走道板上向前推进进行抛石直至出水。本抛石合龙方法解决了大型高流速龙口采用块石或混凝土块体难以稳定的问题和快速截流问题。 
以上显示和描述了本实用新型的基本原理、主要特征和本实用新型的优点。本行业的技术人员应该了解,本实用新型不受上述实施例的限制,上述实施例和说明书中描述的只是说明本实用新型的原理,在不脱离本实用新型精神 和范围的前提下本实用新型还会有各种变化和改进,这些变化和改进都落入要求保护的本实用新型范围内。本实用新型要求保护范围由所附的权利要求书及其等同物界定。 

Claims (6)

1.一种高流速龙口的抛石合龙方法所用的框架,其特征在于,为一六面体框架,该六面体框架具有顶面、底面、上、下游迎流面、第一侧立面和第二侧立面,其中底面和顶面是透空的,该六面体框架的高度与截流设计高水位相当;所述上、下游迎流面成斜坡,所述框架的顶面顺流向宽度为框架高度与截流后龙口两侧水位差之和;在所述框架的上、下游迎流面上分别设置有第一阻拦网和第二阻拦网;在所述框架的第一侧立面靠近上、下游迎流面位置设置有与上、下游迎流面边缘连接的第三阻拦网和第四阻拦网,并在该第一侧立面靠近底板面位置设置有第五阻拦网,在所述框架的第二侧立面靠近上、下游迎流面位置设置有与上、下游迎流面边缘连接的第六阻拦网和第七阻拦网。 
2.如权利要求1所述的高流速龙口的抛石合龙方法所用的框架,其特征在于,所述上、下游迎流面与底面之间的夹角为70°~85°。 
3.如权利要求1所述的高流速龙口的抛石合龙方法所用的框架,其特征在于,所述第一阻拦网和第二阻拦网高度分别小于框架的上、下游迎流面的高度。 
4.如权利要求1所述的高流速龙口的抛石合龙方法所用的框架,其特征在于,所述第三阻拦网、第四阻拦网的宽度为1m,高度与第一侧立面高度相同,第六阻拦网和第七阻拦网的宽度为1m,高度与第二侧立面高度相同。 
5.如权利要求1所述的高流速龙口的抛石合龙方法所用的框架,其特征在于,所述第五阻拦网的两端与所述第三阻拦网和第四阻拦网相连接,高度为框架高度的1/4。 
6.如权利要求1所述的高流速龙口的抛石合龙方法所用的框架,其特征在于,所述第一阻拦网、第二阻拦网、第三阻拦网、第四阻拦网、第五阻拦网、第六阻拦网和第七阻拦网均为钢筋网或高强度土工合成材料网。 
CN 201220163649 2012-04-17 2012-04-17 一种高流速龙口的抛石合龙方法所用的框架 Expired - Fee Related CN202787190U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220163649 CN202787190U (zh) 2012-04-17 2012-04-17 一种高流速龙口的抛石合龙方法所用的框架

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220163649 CN202787190U (zh) 2012-04-17 2012-04-17 一种高流速龙口的抛石合龙方法所用的框架

Publications (1)

Publication Number Publication Date
CN202787190U true CN202787190U (zh) 2013-03-13

Family

ID=47814472

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220163649 Expired - Fee Related CN202787190U (zh) 2012-04-17 2012-04-17 一种高流速龙口的抛石合龙方法所用的框架

Country Status (1)

Country Link
CN (1) CN202787190U (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102619194A (zh) * 2012-04-17 2012-08-01 上海市水利工程设计研究院 一种高流速龙口的抛石合龙方法及所用的框架
CN104179186A (zh) * 2013-05-21 2014-12-03 山东省水利科学研究院 海堤静水抛填堵口方法
CN109371935A (zh) * 2018-11-06 2019-02-22 中水电第十工程局(郑州)有限公司 一种360t混凝土抛投体截流的施工方法
CN115434349A (zh) * 2022-10-09 2022-12-06 中冶城市投资控股有限公司 挡水围堰

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102619194A (zh) * 2012-04-17 2012-08-01 上海市水利工程设计研究院 一种高流速龙口的抛石合龙方法及所用的框架
CN104179186A (zh) * 2013-05-21 2014-12-03 山东省水利科学研究院 海堤静水抛填堵口方法
CN109371935A (zh) * 2018-11-06 2019-02-22 中水电第十工程局(郑州)有限公司 一种360t混凝土抛投体截流的施工方法
CN115434349A (zh) * 2022-10-09 2022-12-06 中冶城市投资控股有限公司 挡水围堰
CN115434349B (zh) * 2022-10-09 2023-08-29 中冶城市投资控股有限公司 挡水围堰

Similar Documents

Publication Publication Date Title
CN202787190U (zh) 一种高流速龙口的抛石合龙方法所用的框架
CN101713178A (zh) 黄河下游游荡性河道三级流路塑造方法
CN108824351A (zh) 增强河道地表水地下水交换的生态丁坝
CN206090470U (zh) 一种组合式水利工程护坡
CN201581381U (zh) 清淤分沙坝
CN102619194A (zh) 一种高流速龙口的抛石合龙方法及所用的框架
CN102561260A (zh) 一种透水型河道整治丁坝
CN100347377C (zh) 一种模袋排帘及其江河崩岸防治方法
CN205296100U (zh) 一种水库分段排沙设备
CN103938592A (zh) 在拦沙坎上开设分流孔进行截流分流的方法
CN204728261U (zh) 用于沟水处理及泥石流防护的拦挡组合结构
CN201614571U (zh) 生态堤岸护坡专用砌块
CN203007961U (zh) 石笼围堰结构
CN205399343U (zh) 一种加固型防水防渗护坡
CN110965519B (zh) 一种解决城市群水体流动不畅的方法
CN103614986A (zh) 一种适用于尾矿库排洪的无压流进水方法
CN101798804B (zh) 河道上游围堰拆除的导流明渠截流进占戗堤
CN203546740U (zh) 河道截流戗堤结构
CN206784336U (zh) 一种防止水利水库泥沙淤积坝体结构
CN2856164Y (zh) 截砂网
CN206581219U (zh) 一种抗洪三角形圆钢结构
KR20110083935A (ko) 친환경 복합 사방댐
CN205999842U (zh) 一种竖井式退水口
CN205088645U (zh) 用于水电站的回水沉沙引水结构
CN110952496B (zh) 一种城市水体水流生态导控及分流系统

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: SHANGHAI QING CAO SHA WATER ENGINEERING COL, LTD.;

Effective date: 20140213

CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Lu Yongjin

Inventor after: Xu Shichang

Inventor after: Lu Xiaoru

Inventor after: Lu Zhongmin

Inventor after: Tong Hongwei

Inventor after: Li Rui

Inventor after: Liu Hanzhong

Inventor after: Ye Yuanxin

Inventor after: Liu Xincheng

Inventor after: Wu Caie

Inventor before: Lu Yongjin

Inventor before: Li Rui

Inventor before: Liu Xincheng

Inventor before: Xu Shichang

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: GENG YINGHUA ZHANG RUILIN ZHANG MAOQI ZHANG GUIYONG TO: GENG YINGHUA ZHANG MAOQI WANG XIWEI YU ZHONGXUN ZHANG RUILIN WANG YANG WANG LIANGLIANG ZHANG MAOQI ZHANG BINGWA ZHANG GUIYONG

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20140213

Address after: 200000 No. 193, Hankou Road, the Bund street, Shanghai, Huangpu District

Patentee after: Shanghai Water Engineering Design & Research Institute

Patentee after: Shanghai Qingcaosha Investment Construction Development Co., Ltd.

Patentee after: Shanghai Investigation Design & Research Institute

Address before: 200000 No. 193, Hankou Road, the Bund street, Shanghai, Huangpu District

Patentee before: Shanghai Water Engineering Design & Research Institute

C56 Change in the name or address of the patentee

Owner name: SHANGHAI WATER ENGINEERING DESIGN + RESEARCH INSTI

Free format text: FORMER NAME: SHANGHAI WATER ENGINEERING DESIGN + RESEARCH INSTITUTE

CP01 Change in the name or title of a patent holder

Address after: 200000 No. 193, Hankou Road, the Bund street, Shanghai, Huangpu District

Patentee after: Shanghai Water Engineering Design & Research Institute Co., Ltd.

Patentee after: Shanghai Qingcaosha Investment Construction Development Co., Ltd.

Patentee after: Shanghai Investigation Design & Research Institute

Address before: 200000 No. 193, Hankou Road, the Bund street, Shanghai, Huangpu District

Patentee before: Shanghai Water Engineering Design & Research Institute

Patentee before: Shanghai Qingcaosha Investment Construction Development Co., Ltd.

Patentee before: Shanghai Investigation Design & Research Institute

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130313

Termination date: 20200417