CN202784699U - Segmented unloading sliding type gangue dump frame head - Google Patents
Segmented unloading sliding type gangue dump frame head Download PDFInfo
- Publication number
- CN202784699U CN202784699U CN 201220511360 CN201220511360U CN202784699U CN 202784699 U CN202784699 U CN 202784699U CN 201220511360 CN201220511360 CN 201220511360 CN 201220511360 U CN201220511360 U CN 201220511360U CN 202784699 U CN202784699 U CN 202784699U
- Authority
- CN
- China
- Prior art keywords
- unloading
- discharge
- slide board
- frame head
- sliding type
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model discloses a segmented unloading sliding type gangue dump frame head and belongs to mining gangue unloading device. The gangue dump frame head comprises a frame body and two parallel traveling tracks which are arranged on the frame body and is characterized in that a rope support wheel slide board and a discharge slide board are arranged between opposite H-shaped grooves of the two parallel traveling tracks, fixing pins for connection are arranged between the rope support wheel slide board and the two traveling tracks, as well as between the discharge slide board and the two traveling tracks, a main rope wheel is arranged on the rope support wheel slide board, and a discharge hook is arranged on the discharge slide board. According to the segmented unloading sliding type gangue dump frame head, a support basal plane is naturally formed by using successive discharge, a rear segment discharge area automatically prepares foreshadowing for forward shift construction of a front end unloading area in front of the rear segment discharge area, the disadvantage that time and labors are wasted for wood cribs which are manually constructed for support in the past is overcome, manpower is saved greatly, and the production efficiency is improved.
Description
Technical field:
The utility model belongs to mining spoil unloading equipment, is specifically related to the sliding hillock shelf of a kind of segmentation offloading head.
Background technology:
In mining process, can produce a large amount of spoil waste materials, these spoils need be transported to ground stacking, after Gangue is put into certain height, just formed hillock, for the Lifting Convey of spoil need to, will lay track on hillock, the track front end arranges the shelf head, lifts car with the main rope sheave of shelf head front end and unloads to shelf head place, after this section is unloaded full spoil, just need to be with the reach of shelf head and track, it moves inconvenience, and the shelf head of reach also need adopt manually to be set up grillage in the bottom and supports, its labour intensity is large, wastes time and energy.
Summary of the invention:
The utility model provides the sliding hillock shelf of a kind of segmentation offloading head for overcoming the deficiencies in the prior art.
The purpose of this utility model is achieved in the following ways: the sliding hillock shelf of this segmentation offloading head, comprise two parallel Crane Rails that support body and its top are provided with, it is characterized in that: be provided with holder rope sheave sliding plate and unloading slide plate between the relative I shape groove of two Crane Rails, both with Crane Rail between be equipped with the set pin that links to each other, holder rope sheave sliding plate is provided with main rope sheave, and the unloading slide plate is provided with the unloading hook.
Preferably, described unloading slide plate is provided with hook with safety tong.
Preferably, described Crane Rail is fixed on the support body 1 by end beam, and end beam is provided with the beam brace panel.
The sliding hillock shelf of segmentation offloading of the present utility model head has the following advantages:
1, can divide 12 sections unloading areas to unload successively before backward, whole unloading length reaches 12.5 meters, greatly reduces the shelf head and moves number of times, saves man-hour and working out.
2, each unloading area utilization unloads successively, the self-assembling formation support floors, the unloading area of back segment is built for the reach of the front end unloading area in its place ahead and is carried out voluntarily the place mat preparation, saved in the past and need manually build the drawback that grillage is done support, wasted time and energy, greatly save manpower, improved production efficiency.
3, consist of integral structure with the support body in 12 sections unloading areas, design light firm, integral slipping side
Just, need not to set up supplemental support, save material.
4, be used three self-unloading cars, can realize Self-tipping, need not manually to unload spoil, fall
Low workman's labour intensity need not to improve workman's operating condition with car.
5, the unloading hook and the hook with safety tong that arrange greatly reduce and fall down the hillock generation when car is pulled through volume
The possibility of accident, the safety that has improved unloading operation.
6, adopt 1.2 meters gauges between the driving gauge, more originally the 0.6m gauge has increased hillock and has held
The spoil ability lowers the speed that hillock stretches forward, the suitable especially contradictory problems of going back dilatation when hillock the place ahead is taken up an area near end position that solves.
7, adopt three ton of self lighting type car, unloading spoil ability is strengthened greatly, improves the ability of mine discharge refuse stone.
Description of drawings:
Fig. 1 is birds-eye view of the present utility model.
Fig. 2 be along A-A among Fig. 1 to cutaway view.
Fig. 3 be along B-B among Fig. 1 to cutaway view.
The specific embodiment:
Below in conjunction with Fig. 1, Fig. 2 and Fig. 3 the specific embodiment of the present utility model is described further:
The sliding hillock shelf of segmentation offloading of the present utility model head, comprise two parallel Crane Rails 2 that support body 1 and its top are provided with, it is characterized in that: be provided with holder rope sheave sliding plate 3 and unloading slide plate 4 between the relative I shape groove of two Crane Rails 2, both with Crane Rail 2 between be equipped with the set pin that links to each other, holder rope sheave sliding plate 3 is provided with main rope sheave 5, and unloading slide plate 4 is provided with unloading hook 6.Unloading slide plate 4 is provided with hook with safety tong 7.Crane Rail 2 fixes on the support body 1 by end beam solid 8, and end beam is provided with beam brace panel 9.
During implementation, set up one section support body 1 as the first paragraph unloading area in unloading place of car conveying track, be equipped with the pin-and-hole vertical with Crane Rail on the side of the Crane Rail 2 on the support body 1, pin-and-hole can cooperate with set pin; Gauge between the Crane Rail 2 is 1.2 meters, and the mine car that is mated use is three self lighting type cars.Before the unloading operation, will ask first rope sheave sliding plate 3 and unloading slide plate 4 to slide in the unloading area of rearmost end, then both will be fixed on the Crane Rail 2 by set pin; During unloading, main rope sheave 5 is by hauling rope tractive car, when car runs on the unloading slide plate 4, the discharging gear that unloading hook 6 starts on the car, make car carry out unloading operation, hook with safety tong 7 can prevent that car is pulled through the possibility that falls down hillock when rolling up and have an accident, the safety that has improved unloading operation by main rope sheave 5 in this process.After the spoil in this section zone unloads completely, set up the second segment unloading area at this section unloading area front end, pull out again the set pin of fixing holder rope sheave sliding plate 3 and unloading slide plate 4, and with both slippages in the second segment unloading area, then repeat abovely to install and fix operation and carry out unloading operation, after so in corresponding unloading area, unloading full spoil, set up new unloading area at its front end, before backward, unload successively spoil like this, and build successively new support body 1 as new unloading area, the last period, unloading area unloaded full spoil as support floors in one section unloading area later on, each unloading area is the support body 1 of building that relatively moves forward in next unloading area and carries out voluntarily the place mat preparation, when building the 12nd section unloading area, can lay down the support body 1 in each unloading area, change it into fixing conveying track, then build successively again support body 1 at the front end of this conveying track, consist of each unloading area, repeat above unloading and build operation.The total length of per 12 sections unloading areas is 12.5 meters.
Claims (3)
1. the sliding hillock shelf of segmentation offloading head, comprise two parallel Crane Rails (2) that support body (1) and its top are provided with, it is characterized in that: be provided with holder rope sheave sliding plate (3) between the relative I shape groove of two Crane Rails (2) and unload slide plate (4), both with Crane Rail (2) between be equipped with the set pin that links to each other, holder rope sheave sliding plate (3) is provided with main rope sheave (5), and unloading slide plate (4) is provided with unloading hook (6).
2. the sliding hillock shelf of segmentation offloading as claimed in claim 1 head is characterized in that: unload slide plate (4) and be provided with hook with safety tong (7).
3. the sliding hillock shelf of segmentation offloading as claimed in claim 1 head is characterized in that: Crane Rail (2) fixes on the support body (1) by end beam solid (8), and end beam is provided with beam brace panel (9).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220511360 CN202784699U (en) | 2012-10-08 | 2012-10-08 | Segmented unloading sliding type gangue dump frame head |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220511360 CN202784699U (en) | 2012-10-08 | 2012-10-08 | Segmented unloading sliding type gangue dump frame head |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202784699U true CN202784699U (en) | 2013-03-13 |
Family
ID=47812011
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220511360 Expired - Fee Related CN202784699U (en) | 2012-10-08 | 2012-10-08 | Segmented unloading sliding type gangue dump frame head |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202784699U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112278754A (en) * | 2020-09-28 | 2021-01-29 | 山东交通学院 | Special frame head for gangue unloading rail |
-
2012
- 2012-10-08 CN CN 201220511360 patent/CN202784699U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112278754A (en) * | 2020-09-28 | 2021-01-29 | 山东交通学院 | Special frame head for gangue unloading rail |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103452574B (en) | Auxiliary bracket moving device of circular self-moving advance support | |
CN201729114U (en) | Multifunctional power grid emergency engineering truck | |
CN204455738U (en) | Subway solid concrete roabed is built and is used movable concrete cloth device | |
CN202968018U (en) | Folding type installation forklift | |
CN105292151B (en) | One kind moves changing train | |
CN202784699U (en) | Segmented unloading sliding type gangue dump frame head | |
CN202827620U (en) | Trapped rail tramcar push-pull shunter | |
CN102720534A (en) | Self-moving tail push unit for belt conveyor | |
CN204778464U (en) | Shield constructs gantry crane for subway | |
CN207374417U (en) | A kind of fully mechanized mining is integrated from telephone-moving structure with the auxiliary fortune equipment vehicle group of hydraulic pressure automatic moving type | |
CN101725491A (en) | Device and method for power generation by potential energy of vehicles on high slope of highway | |
CN202508557U (en) | Shield single-well overall originating belt machine auxiliary device | |
CN202116252U (en) | Lifting and moving operation platform cart | |
CN205661440U (en) | Colliery behaviour car tractive track system that plugs into | |
CN103128528A (en) | Fully-mechanized coal mining equipment hoisting installation car | |
CN201300845Y (en) | Novel mining rest-transport flat car capable of bearing 30T | |
CN2533265Y (en) | Tunnel inverted arch operation bridge | |
CN205558964U (en) | A device of changing trains for transporting hydraulic support | |
CN205589241U (en) | Colliery behaviour car tractive track that plugs into | |
CN205589224U (en) | Colliery behaviour's car bend tractive track | |
CN208982106U (en) | One kind mentioning rail train | |
CN105712036A (en) | Arrangement method for mine open pit mining belt conveyor | |
CN208412976U (en) | Scratch board conveyor and belt conveyor tail complete machine self-advancing Device | |
CN207943789U (en) | Large-scale mine hydraulic hoisting device | |
CN207278296U (en) | A kind of multi-functional transporting device for coal tunnel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130313 Termination date: 20131008 |