CN202771289U - Intermittent on-off type large size concrete cooling water-diversion control system - Google Patents

Intermittent on-off type large size concrete cooling water-diversion control system Download PDF

Info

Publication number
CN202771289U
CN202771289U CN2012204604702U CN201220460470U CN202771289U CN 202771289 U CN202771289 U CN 202771289U CN 2012204604702 U CN2012204604702 U CN 2012204604702U CN 201220460470 U CN201220460470 U CN 201220460470U CN 202771289 U CN202771289 U CN 202771289U
Authority
CN
China
Prior art keywords
temperature
control
concrete
cooling water
electrically operated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012204604702U
Other languages
Chinese (zh)
Inventor
陈志远
周厚贵
余英
谭恺炎
李萌
吴优
张治奎
胡迪忠
张新源
曹永辉
黄丹勇
李俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YALONGJIANG RIVER BASIN HYDROPOWER DEVELOPMENT Co Ltd
Gezhouba Group Testing and Inspection Co Ltd
Original Assignee
Gezhouba Group Testing and Inspection Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gezhouba Group Testing and Inspection Co Ltd filed Critical Gezhouba Group Testing and Inspection Co Ltd
Priority to CN201210333844.9A priority Critical patent/CN102864930B/en
Priority to CN2012204604702U priority patent/CN202771289U/en
Application granted granted Critical
Publication of CN202771289U publication Critical patent/CN202771289U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

Disclosed is an intermittent on-off type large size concrete cooling water-diversion control system, comprising a concrete temperature acquisition system, a control terminal, a wireless control switch, an electrically operated valve, and a wireless hot spot, wherein the control terminal comprises a computer equipped with control software; the control terminal automatically obtains the temperature data of the concrete temperature acquisition system via the internet and compares the obtained data with the set targeted temperature and then emits control signals; the control signals are sent to the wireless control switch via the wireless hot spot; and the wireless control switch controls the on/off of the electrically operated valve. The following function can be achieved: when the concrete temperature is higher than the set targeted temperature, the electrically operated valve is opened to carry out water cooling operation; when the concrete temperature is lower than the set targeted temperature, the electrically operated valve is closed. The intermittent on-off type large size concrete cooling water-diversion control system sets a targeted temperature and employs the actually measured concrete temperature as the grounding for water cooling control. Therefore, it is unnecessary to specially arrange a cooling water flow and temperature sensor.

Description

A kind of on-off type mass concrete cooling water flowing at intermittence control system
Technical field
The utility model relates to a kind of mass concrete cooling water flowing control system, particularly a kind of on-off type mass concrete cooling water flowing at intermittence control system.
Background technology
Because concrete material conducts heat slowly, tensile strength is low, and its inner cement aquation heating, can cause mass concrete to ftracture because internal-external temperature difference is excessive, its structural failure, permanance are reduced.Cool off water flowing, namely bury water pipe underground in mass concrete inside, circulation passes into the lower water of temperature, can take away heat, reduces the generation of concrete cracking.The control method of existing cooling water flowing is to control the flow of water flowing with the aperture that the mode of artificial or robotization is regulated the water flowing valve, and then reaches the cooling target.This method need to be monitored the water flowing flow, needs the manual test flow under the artificial mode, needs to arrange flow sensor and flow collection facility under the mode of robotization, has increased manpower and equipment investment, has improved cost.Also because having increased the traffic monitoring link, and cause system unstable under the robotization mode.
Chinese patent 201010219769.4, publication number: CN 101871266 B, a kind of automatic collecting system of concrete cooling water-flowing data is disclosed, can automatically identify the positional information of cooling water pipe, realized flow and the water temperature of concrete cooling water flowing are tested and data transmission automatically, solved the manual testing record need to expend a large amount of artificial, information is fed back slow and the not high shortcoming of precision, time saving and energy saving, measuring accuracy is high and feedback is rapid, can in time adjust the Concrete Temperature Control measure, avoid distress in concrete, realize in time adjusting the concrete construction measure, guarantee construction quality and progress.The device of this utility model is that robotization control cooling water flowing provides the foundation.
Chinese patent 201010228838.8, publication number: CN101921134A, a kind of intelligent cooling water passage system for concrete is disclosed, implemented the aperture of motor-operated control valve is controlled by measure and control device, regulate water flowing flow and water flowing water temperature, thereby realization reduces thermograde to greatest extent, reduces the concrete temperature tension, reaches to prevent that the effect in crack from appearring in concrete.
Chinese patent 201110318693.5, publication number: CN 102508499 A mass concrete cooling water flowing flow control methods may further comprise the steps: the value of 1) obtaining the historical water flowing cooling of concrete efficient; 2) next step flow control value of calculating needs according to the cooling extent of the historical water flowing cooling efficiency value of concrete and following needs and cooling period; By above-mentioned steps concrete temperature is evenly descended according to designing requirement.A kind of mass concrete cooling water flowing flow control methods that the utility model provides, by the dynamic adjustment of introducing actual cooling coefficient of flow α and the auxiliary correction that cooperates lag coefficient ξ, realized that control concrete internal temperature uniform and stable descends, and reached within the scheduled time the purpose of control target temperature.And realize the automatic calculating of cooling water flow, get rid of manually operated randomness, further improved the construction quality of mass concrete.
But above-mentioned control mode and method all need the data of water flowing flow, namely flow sensor must be set, and environment is abominable and water flowing is on-the-spot usually, the water flowing water quality inferiority, and make the flow sensor cisco unity malfunction.
Summary of the invention
Technical problem to be solved in the utility model provides a kind of on-off type mass concrete cooling water flowing at intermittence control system, can reach under the prerequisite of designing requirement, reduces opertaing device, simplifies control method, improves operation stability.
For solving the problems of the technologies described above, the technical scheme that the utility model adopts is: a kind of on-off type mass concrete cooling water flowing at intermittence control system comprises:
The concrete temperature acquisition system is in order to gather concrete temperature;
Control terminal compares for the temperature signal that obtains the concrete temperature acquisition system and with the control target temperature of setting, and then sends control signal;
Wireless control switch is used for receiving the control signal that control terminal sends, and sends executive signal;
The a plurality of electrically operated valves that are connected with wireless control switch are realized opening and closing movement in order to the executive signal that receives wireless control switch, and described electrically operated valve is installed on the cooling water pipe;
Hotspot is in order to transmission of signal between control terminal and wireless control switch.
Described control signal is the break-make control signal.
Control terminal obtains concrete temperature by the database of regular visit concrete temperature acquisition system.
The concrete temperature acquisition system is comprised of the temperature sensor that is embedded in inside concrete and automation collection device and database.
Described temperature sensor and electrically operated valve divide into groups according to cooling water pipe, and the temperature sensor and the electrically operated valve on this cooling water pipe that namely are used near the concrete temperature of this cooling water pipe of measurement are one group.
The node temperature that described control target temperature requires according to Concrete Design, rate of temperature fall, temperature control duration, and existing cooling water flowing experience was artificially set before the control beginning; In control procedure, adjust according to actual conditions.
When concrete temperature was higher than the control target temperature, control signal made valve opening, otherwise control signal makes valve closing.
A kind of method that adopts above-mentioned device to cool off water flowing control may further comprise the steps:
One, arranges the concrete temperature acquisition system, obtain concrete temperature by temperature sensor;
Two, control terminal is installed, is used for obtaining the temperature signal of concrete temperature acquisition system, and compare with the control target temperature of setting, then send control signal.
Three, arrange wireless control switch, be used for receiving the control signal of control terminal, and send executive signal;
Four, hotspot is set, in order to transmission of signal between control terminal and wireless control switch;
Five, a plurality of electrically operated valves that are installed on the cooling water pipe are connected with wireless control switch, are used for carrying out the executive signal of wireless control switch, realize opening and closing movement, thus the break-make of control cooling water pipe;
Realize mass concrete cooling water flowing control by above-mentioned step with higher efficient and stability.
Described temperature sensor and electrically operated valve divide into groups according to cooling water pipe, and the temperature sensor and the electrically operated valve on this cooling water pipe that namely are used near the concrete temperature of this cooling water pipe of measurement are one group.
Described control signal is the break-make control signal.
The node temperature that described control target temperature requires according to Concrete Design, rate of temperature fall, temperature control duration, and existing cooling water flowing experience was artificially set before the control beginning.In control procedure, can adjust according to actual conditions again.
A kind of on-off type mass concrete cooling water flowing at intermittence control system that the utility model provides, by adopting the control target temperature, and with the foundation of concrete observed temperature as cooling water flowing control, need not to arrange separately flow sensor, namely save the monitoring to the water flowing flow, directly between the break-make of concrete temperature and water pipe, set up contact.Reduced intermediate link, system is simple, good stability, control effectively, environmental suitability is strong, equipment, human input are few, have reduced and have controlled cost.
The hotspot that arranges can make control terminal and wireless control switch can be linked into hotspot, thereby realizes the wireless transmission of signal, avoids long distance, the wired connection under the complex-terrain, the maintenance difficulties of reduction system, the stability of raising system operation.
Description of drawings
The utility model is described in further detail below in conjunction with drawings and Examples.
Fig. 1 is the overall schematic of installing in the utility model.
Among the figure: concrete temperature acquisition system 1, control terminal 2, hotspot 3, wireless control switch 4, electrically operated valve 5.
Embodiment
Embodiment 1:
In Fig. 1, a kind of on-off type mass concrete cooling at intermittence water passage control device comprises:
Concrete temperature acquisition system 1 is namely with the temperature sensor measurement concrete temperature; In this example, the scheme of optimization is to adopt the temperature sensor of wireless telemetering, but also can configure wired temperature sensor in the part engineering, and this normally configures simultaneously along with pouring construction, and it also is feasible adopting the temperature sensor of wired mode.
Control terminal 2 compares for the temperature signal that obtains concrete temperature acquisition system 1 and with the control target temperature of setting, and then sends control signal; Control signal is normally controlled the signal of certain electrically operated valve 5 break-make, and namely described control signal is the break-make control signal.When concrete temperature was higher than the control target temperature, control signal made valve opening, otherwise control signal makes valve closing;
Wireless control switch 4 is used for receiving the control signal that control terminal 2 sends, and sends executive signal,
The a plurality of electrically operated valves 5 that are connected with wireless control switch 4 are realized opening and closing movement in order to the executive signal that receives wireless control switch 4, and described electrically operated valve 5 is installed on the cooling water pipe.
Hotspot 3 is in order to transmission of signal between concrete temperature acquisition system 1, control terminal 2 and wireless control switch 4.
Embodiment 2:
The device of a kind of embodiment of employing 1 cools off the method for water flowing control, may further comprise the steps:
One, arranges concrete temperature acquisition system 1, obtain concrete temperature by temperature sensor; Described temperature sensor and electrically operated valve 5 divide into groups according to cooling water pipe, and the temperature sensor and the electrically operated valve on this cooling water pipe 5 that namely are used for measuring near the concrete temperature this cooling water pipe are one group.The temperature data that temperature sensor in this group obtains also only is used for the electrically operated valve 5 of this group of control.
Two, control terminal 2 is installed, is used for obtaining the temperature signal of concrete temperature acquisition system 1, and compare with the control target temperature of setting, then send control signal, when concrete temperature was higher than the control target temperature, control signal made valve opening, otherwise control signal makes valve closing.Described control signal is the break-make control signal, and namely signal only has two, and is corresponding, electrically operated valve 5 also only has two states, namely opens or closed condition, thus method, control very simple and reliablely, operating mode stability inferior especially comparatively abominable at environment, that water flowing water quality is relatively poor is higher.
The node temperature that the control target temperature requires according to Concrete Design, rate of temperature fall, temperature control duration, and existing cooling water flowing experience was artificially set before the control beginning.In control procedure, can adjust according to actual conditions again.
Different control target temperature points constantly form a control target temperature line, these all temperature nodes of line process, and be straight line between adjacent temperature nodes.Temperature nodes is then determined according to designing requirement, engineering concrete condition and cooling water flowing experience.
The setting of temperature nodes is for example such as table 1.
According to the temperature nodes of setting in the table 1, the equation of control target temperature line is (establish, t is the temperature control time, and T is the control temperature):
T=T0+(T1-T0)*(t-t0)/(t1-t0) (t0≤t<t1)
T=T1+(T2-T1)*(t-t1)/(t2-t1) (t1≤t<t2)
T=T2+(T3-T2)*(t-t2)/(t3-t2) (t2≤t<t3)
T=T3+(T4-T3)*(t-t3)/(t4-t3) (t3≤t<t4)
T=T4+(T5-T4)*(t-t4)/(t5-t4) (t4≤t<t5)
T=T5+(T6-T5)*(t-t5)/(t6-t5) (t5≤t≤t6)
In control procedure, if there is inconsistent such as actual Wen Fengyu setting value, the temperature control time can be controlled the target temperature line by revising the temperature nodes of setting, changing, to satisfy all kinds of temperature control demands owing to situations such as construction requirement need to prolong.
The control designing requirement of table 1 concrete temperature and temperature nodes are set table
Control time Designing requirement Designing requirement Designing requirement Temperature nodes is set Temperature nodes is set Temperature nodes is set
Control time Target temperature (℃) Rate of temperature fall (℃/d) Control duration (d) Node constantly Node temperature Set explanation
The first period cooling temperature control ≤ 28 T0 T0 After concrete spreading vibrates and finishes, and the time of beginning temperature control and actual measurement concrete temperature.
The first period cooling temperature control ≤ 28 T1=t0+3 T1=27 ℃ Rule of thumb set the time that highest temperature peak occurs, begin rear 3d such as temperature control, the reference design requirement is set concrete temperature at this moment, such as 27 ℃.
The first period cooling cooling 21 ~ 23 ≤ 0.5 〉=21 T2=t0+3+23 T2=22 ℃ Set the time that the first phase cooling finishes according to designing requirement, begin rear 3d+23d such as temperature control, set the concrete temperature of this moment, such as 22 ℃.
Cool mid-term 17 ~ 18 ≤ 0.3 〉=28 T3=t0+3+23+32 T3=17.5 ℃ Set the time that mid-term, cooling finished according to designing requirement, begin rear 3d+23d+32d such as temperature control, set the concrete temperature of this moment, such as 17.5 ℃.
Cool off temperature control mid-term T4=t0+3+23+32+15 T4=17.5 ℃ Set the time that mid-term, temperature control finished according to designing requirement or construction requirement, begin rear 3d+23d+32d+15d such as temperature control, set the concrete temperature of this moment, such as 17.5 ℃.
Second phase cools 12 ~ 15 ≤ 0.3 〉=42 T5=t0+3+23+32+15+45 T5=13.5 ℃ Set the time that the second phase cooling finishes according to designing requirement, begin rear 3d+23d+32d+15d+45d such as temperature control, set the concrete temperature of this moment, such as 13.5 ℃.
Second phase cooling temperature control T6=t0+3+23+32+15+45+18 T6=13.5 ℃ Set the time that the second stage of temperature control finishes according to construction requirement, begin rear 3d+23d+32d+15d+45d+18d such as temperature control, set the concrete temperature of this moment, such as 13.5 ℃.
Concrete temperature is generally 30 minutes with control relatively being undertaken by certain time interval of target temperature, the time interval ~ and 6 hours.After one time control signal is sent, the on off operating mode of electrically operated valve 5 will continue a time interval, until control signal is sent next time.
Software systems in the control terminal 2.Can also realize the automatic management to electrically operated valve 5, wireless control switch 4, hotspot 3 and data transmission system, realize automatic acquisition and the management of concrete temperature, realize the setting of control temperature, automatically produce and adjust at any time, realize observed temperature and the comparison of temperature standard and the generation of break-make instruction, realization to the record of control procedure, can freely check and manual intervention, realize the compliance evaluation to control procedure.For example: concrete rate of temperature fall under calculating, the display control state, in order to instruct follow-up temperature control process.
Three, arrange wireless control switch 4, be used for receiving the control signal of control terminal 2, and send executive signal; Executive signal is for directly controlling the signal that electrically operated valve 5 moves.For example make electrically operated valve 5 open or close.
Four, hotspot 3 is set, in order to transmission of signal between concrete temperature acquisition system 1, control terminal 2 and wireless control switch 4; Hotspot 3 has been realized the wireless transmission of signal, avoids long distance, the wired connection under the complex-terrain, the maintenance difficulties of reduction system, the stability of raising system operation.In the part engineering, concrete temperature acquisition system 1 is connected with control terminal 2 by wired mode, and need be through the signal transfer of hotspot 3.
Five, a plurality of electrically operated valves 5 that are installed on the cooling water pipe are connected with wireless control switch 4, are used for carrying out the executive signal of wireless control switch 4, realize opening and closing movement, thus the break-make of control cooling water pipe;
Realize mass concrete cooling water flowing control by above-mentioned step with higher efficient and stability.

Claims (5)

1. on-off type mass concrete cooling water flowing control system intermittently is characterized in that comprising:
Concrete temperature acquisition system (1) is in order to gather concrete temperature;
Control terminal (2) compares for the temperature signal that obtains concrete temperature acquisition system (1) and with the control target temperature of setting, and then sends control signal;
Wireless control switch (4) is used for receiving the control signal that control terminal (2) sends, and sends executive signal;
The a plurality of electrically operated valves (5) that are connected with wireless control switch (4) are realized opening and closing movement in order to the executive signal that receives wireless control switch (4), and described electrically operated valve (5) is installed on the cooling water pipe;
Hotspot (3) is in order to transmission of signal between control terminal (2) and wireless control switch (4).
2. on-off type mass concrete cooling water flowing at a kind of intermittence control system according to claim 1, it is characterized in that: described control signal is the break-make control signal.
3. on-off type mass concrete cooling water flowing at a kind of intermittence control system according to claim 1, it is characterized in that: control terminal (2) obtains concrete temperature by the database of regular visit concrete temperature acquisition system (1).
4. on-off type mass concrete cooling water flowing at a kind of intermittence control system according to claim 1 is characterized in that: concrete temperature acquisition system (1) is comprised of the temperature sensor that is embedded in inside concrete and automation collection device and database.
5. according to claim 1 or 4 described on-off type mass concrete cooling water flowing at a kind of intermittence control system, it is characterized in that: described temperature sensor and electrically operated valve divide into groups according to cooling water pipe, and the temperature sensor and the electrically operated valve on this cooling water pipe that namely are used near the concrete temperature of this cooling water pipe of measurement are one group.
CN2012204604702U 2012-09-11 2012-09-11 Intermittent on-off type large size concrete cooling water-diversion control system Expired - Fee Related CN202771289U (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201210333844.9A CN102864930B (en) 2012-09-11 2012-09-11 Intermittent on-off type mass concrete cooling water supply control system
CN2012204604702U CN202771289U (en) 2012-09-11 2012-09-11 Intermittent on-off type large size concrete cooling water-diversion control system

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201210333844.9A CN102864930B (en) 2012-09-11 2012-09-11 Intermittent on-off type mass concrete cooling water supply control system
CN2012204604702U CN202771289U (en) 2012-09-11 2012-09-11 Intermittent on-off type large size concrete cooling water-diversion control system

Publications (1)

Publication Number Publication Date
CN202771289U true CN202771289U (en) 2013-03-06

Family

ID=53871709

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201210333844.9A Active CN102864930B (en) 2012-09-11 2012-09-11 Intermittent on-off type mass concrete cooling water supply control system
CN2012204604702U Expired - Fee Related CN202771289U (en) 2012-09-11 2012-09-11 Intermittent on-off type large size concrete cooling water-diversion control system

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201210333844.9A Active CN102864930B (en) 2012-09-11 2012-09-11 Intermittent on-off type mass concrete cooling water supply control system

Country Status (1)

Country Link
CN (2) CN102864930B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102864930A (en) * 2012-09-11 2013-01-09 葛洲坝集团试验检测有限公司 Intermittent on-off type mass concrete cooling water supply control system
CN111309081A (en) * 2020-03-11 2020-06-19 河南天平工程质量检测有限公司 Method for realizing automatic regulation of health preserving room temperature and humidity

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103970076A (en) * 2013-01-30 2014-08-06 张永生 Large-volume deposit concrete cooling water intelligent control system
CN103603497A (en) * 2013-11-27 2014-02-26 天津大学 Intelligent cooling device for mass concrete
CN103741692B (en) * 2013-12-23 2016-01-13 中国水利水电科学研究院 A kind of intelligent water communication method of mass concrete and the system of use the method
CN106738350A (en) * 2016-12-07 2017-05-31 徐州徐工施维英机械有限公司 Concrete mixing plant multi-mode temperature control methods, devices and systems
CN107402076A (en) * 2017-07-13 2017-11-28 中国水利水电科学研究院 Concrete temperature detection means and method
CN108643185A (en) * 2018-05-28 2018-10-12 山西六建集团有限公司 A kind of mass concrete temperature control system
CN113386242B (en) * 2021-06-08 2022-05-27 华恒建设集团有限公司 Special-shaped concrete line mold and construction process thereof

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003193680A (en) * 2001-12-27 2003-07-09 Topy Ind Ltd Temperature control system of fluid and heat exchanger used for the system
CN101285308B (en) * 2008-05-09 2011-05-25 水利部交通部电力工业部南京水利科学研究院 Device and method for controlling temperature of concrete curing water
CN101871266B (en) * 2010-07-07 2012-05-30 葛洲坝集团试验检测有限公司 Automatic collecting system of concrete cooling water-flowing data
CN101921134B (en) * 2010-07-16 2012-10-03 葛洲坝集团试验检测有限公司 Intelligent cooling water passage system for concrete
CN202150037U (en) * 2011-04-15 2012-02-22 中国水利水电科学研究院 Temperature control and crack prevention digital dynamic monitoring system for concrete dam
CN102864930B (en) * 2012-09-11 2015-02-18 葛洲坝集团试验检测有限公司 Intermittent on-off type mass concrete cooling water supply control system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102864930A (en) * 2012-09-11 2013-01-09 葛洲坝集团试验检测有限公司 Intermittent on-off type mass concrete cooling water supply control system
CN102864930B (en) * 2012-09-11 2015-02-18 葛洲坝集团试验检测有限公司 Intermittent on-off type mass concrete cooling water supply control system
CN111309081A (en) * 2020-03-11 2020-06-19 河南天平工程质量检测有限公司 Method for realizing automatic regulation of health preserving room temperature and humidity
CN111309081B (en) * 2020-03-11 2022-03-15 河南天平工程质量检测有限公司 Method for realizing automatic regulation of health preserving room temperature and humidity

Also Published As

Publication number Publication date
CN102864930A (en) 2013-01-09
CN102864930B (en) 2015-02-18

Similar Documents

Publication Publication Date Title
CN202771289U (en) Intermittent on-off type large size concrete cooling water-diversion control system
CN108240679B (en) A kind of heat supply method based on building heating load prediction, device and system
CN201611141U (en) Thermal balance intelligent regulating system of heat supply network
CN109595763A (en) The control strategy optimization method, apparatus and computer equipment of air-conditioning system
CN102705955B (en) The cloud management system of environment and refrigeration
CN102607143B (en) Remote monitoring method and remote monitoring system for air conditioners of base stations
CN101949559A (en) Intelligent energy-saving mixed water heat supply method
CN103423598A (en) Leakage judging method based on real-time flow monitoring of water supply pipe network
CN103399538A (en) Heterogeneous network communication-based water supply network monitoring and information service system and monitoring method
CN104515271A (en) Energy conservation optimization control system and method for central air conditioner refrigeration station system
CN106774515B (en) A kind of heatingup of coke oven battery intelligent temperature control system and control method
CN107543243A (en) A kind of method and system of public building heating energy
CN114484556B (en) Water supply temperature regulation and control method based on target energy consumption management and control
CN105864881A (en) Novel intelligent home heating system and demand control method thereof
CN103776120A (en) Underground heat balance and heat exchange device for ground source heat pump air-conditioning system and operation mode
CN101726038A (en) Centralized heat supply control system
CN108563195A (en) The long-distance monitoring method and system of glass bending molding machine
CN116379505A (en) System and method for optimizing control based on household metering heat balance
Vrsalović et al. IoT deployment for smart building: Water consumption analysis
CN114608065B (en) Novel heating power inlet valve position adjusting and controlling method
CN102004511B (en) Medium and small flow rate calibration control method for controlling ladle baking
CN109946960A (en) A kind of data acquisition cabinet
CN102175934A (en) Data collection method of wave recording module
CN211695141U (en) Heat supply multistage regulation and control system based on terminal room temperature big data
CN110594849A (en) Biogas boiler heating system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: YALONG RIVER HYDROPOWER DEVELOPMENT COMPANY, LTD.

Effective date: 20140728

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Zhou Hougui

Inventor after: Zhang Zhikui

Inventor after: Hu Dizhong

Inventor after: Ning Jinhua

Inventor after: Zhang Xinyuan

Inventor after: Cao Yonghui

Inventor after: Huang Danyong

Inventor after: Li Jun

Inventor after: Li Mingchuan

Inventor after: Zheng Jiang

Inventor after: Wang Jimin

Inventor after: Chen Zhiyuan

Inventor after: Duan Shaohui

Inventor after: Tan Kaiyan

Inventor after: Yu Ying

Inventor after: Hu Shuhong

Inventor after: Li Meng

Inventor after: Wu You

Inventor before: Chen Zhiyuan

Inventor before: Cao Yonghui

Inventor before: Huang Danyong

Inventor before: Li Jun

Inventor before: Zhou Hougui

Inventor before: Yu Ying

Inventor before: Tan Kaiyan

Inventor before: Li Meng

Inventor before: Wu You

Inventor before: Zhang Zhikui

Inventor before: Hu Dizhong

Inventor before: Zhang Xinyuan

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: CHEN ZHIYUAN ZHOU HOUGUI YU YING TAN KAIYAN LI MENG WU YOU ZHANG ZHIKUI HU DIZHONG ZHANG XINYUAN CAO YONGHUI HUANG DANYONG LI JUN TO: ZHOU HOUGUI WANG JIMIN CHEN ZHIYUAN DUAN SHAOHUI TAN KAIYAN YU YING HU SHUHONG LI MENG WU YOU ZHANG ZHIKUI HU DIZHONG NING JINHUA ZHANG XINYUAN CAO YONGHUI HUANG DANYONG LI JUN LI MINGCHUAN ZHENG JIANG

TR01 Transfer of patent right

Effective date of registration: 20140728

Address after: 443002 Hubei province Yichang City Road No. 25

Patentee after: Gezhouba Testing Co., Ltd.

Patentee after: Yalongjiang River Basin Hydropower Development Co., Ltd.

Address before: 443002 Hubei province Yichang City Road No. 25

Patentee before: Gezhouba Testing Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130306

Termination date: 20180911