CN102864930B - Intermittent on-off type mass concrete cooling water supply control system - Google Patents

Intermittent on-off type mass concrete cooling water supply control system Download PDF

Info

Publication number
CN102864930B
CN102864930B CN201210333844.9A CN201210333844A CN102864930B CN 102864930 B CN102864930 B CN 102864930B CN 201210333844 A CN201210333844 A CN 201210333844A CN 102864930 B CN102864930 B CN 102864930B
Authority
CN
China
Prior art keywords
temperature
control
concrete
cooling water
signal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210333844.9A
Other languages
Chinese (zh)
Other versions
CN102864930A (en
Inventor
陈志远
周厚贵
余英
谭恺炎
李萌
吴优
张治奎
胡迪忠
张新源
曹永辉
黄丹勇
李俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yalongjiang River Basin Hydropower Development Co., Ltd.
Gezhouba Group Testing and Inspection Co Ltd
Original Assignee
Gezhouba Group Testing and Inspection Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gezhouba Group Testing and Inspection Co Ltd filed Critical Gezhouba Group Testing and Inspection Co Ltd
Priority to CN201210333844.9A priority Critical patent/CN102864930B/en
Priority to CN2012204604702U priority patent/CN202771289U/en
Publication of CN102864930A publication Critical patent/CN102864930A/en
Application granted granted Critical
Publication of CN102864930B publication Critical patent/CN102864930B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Control Of Temperature (AREA)

Abstract

The invention provides an intermittent on-off type mass concrete cooling water supply control system which comprises a concrete temperature acquisition system, a control terminal, a wireless control switch, an electric valve and a wireless hot point, wherein the control terminal consists of a computer provided with control software; the control terminal is used for automatically acquiring the temperature data of the concrete temperature acquisition system through a network, comparing the temperature data with set control object temperature and then sending out a control signal; the control signal is sent to the wireless control switch through the wireless hot point; the wireless control switch is used for controlling the on-off or opening and closing of the electric valve, so as to realize the following functions: i.e., when the concrete temperature is greater than the set control object temperature, the electric valve is opened, and water supply and cooling are carried out; and when the concrete temperature is less than the set control objective temperature, the electric valve is closed. The system has the advantage that by virtue of setting the control object temperature and utilizing the concrete real-time measured temperature as reference for cooling water supply control, a cooling water flow and temperature sensor is not required to be additionally arranged.

Description

A kind of intermittent on-off type concrete in mass cooling water flowing control system
Technical field
The present invention relates to a kind of concrete in mass cooling water flowing control system, particularly a kind of intermittent on-off type concrete in mass cooling water flowing control system.
Background technology
Because concrete material heat transfer is slow, tensile strength is low, and its inner cement aquation heating, concrete in mass can be caused to ftracture because internal-external temperature difference is excessive, make its structural deterioration, durability reduction.Carry out cooling water flowing, namely bury water pipe underground in concrete in mass inside, circulation passes into the lower water of temperature, can take away heat, reduces the generation of concrete cracking.The control method of existing cooling water flowing regulates the aperture of water flowing valve to control the flow of water flowing in mode that is artificial or automation, and then reach cooling target.This method needs monitoring water flowing flow, needs manual test flow, need to arrange flow transmitter and flow collection facility, add manpower and equipment investment, improve cost under the mode of automation under artificial mode.Also because adding traffic monitoring link under automation mode, and cause system unstable.
Chinese patent 201010219769.4, publication number: CN 101871266 B, disclose a kind of automatic collecting system of concrete cooling water-flowing data, automatically the positional information of cooling water pipe can be identified, achieve the flow of concrete cooling water flowing and water temperature is tested automatically and data transmission, solving manual testing's record needs at substantial artificial, slow and the shortcoming that precision is not high of information feed back, time saving and energy saving, certainty of measurement is high and feedback is rapid, Concrete Temperature Control measure can be adjusted in time, avoid distress in concrete, realize the measure of adjustment concrete construction in time, ensure workmanship and progress.The device of this invention is that Automated condtrol cooling water flowing provides the foundation.
Chinese patent 201010228838.8, publication number: CN101921134A, disclose a kind of intelligent cooling water passage system for concrete, implemented to control the aperture of motor-operated control valve by measure and control device, regulate water flowing flow and water flowing water temperature, thus realize reducing temperature gradient to greatest extent, reduce concrete temperature tensile stress, reach the effect preventing concrete from occurring crack.
Chinese patent 201110318693.5, publication number: CN 102508499 A concrete in mass cooling water flowing flow control methods, comprises the following steps: the value 1) obtaining concrete history water flowing cooling efficiency; 2) calculate with the cooling period next step flow control value needed according to concrete history water flowing cooling efficiency value and the following cooling extent needed; By above-mentioned steps, concrete temperature is evenly declined according to designing requirement.A kind of concrete in mass cooling water flowing flow control methods provided by the invention, by introducing the dynamic conditioning of actual cooling discharge coefficient α and coordinating the auxiliary correction of lag coefficient ξ, achieve and control the decline of concrete internal temperature uniform and stable, and reach the object of control objectives temperature within the scheduled time.And realize the automatic calculating of cooling water flow, get rid of manually operated randomness, further increase the construction quality of concrete in mass.
But above-mentioned control mode and method all need the data of water flowing flow, namely must flow transmitter be set, and the on-the-spot bad environments usually of water flowing, water flowing water quality inferiority, and make flow transmitter cisco unity malfunction.
Summary of the invention
Technical problem to be solved by this invention is to provide a kind of intermittent on-off type concrete in mass cooling water flowing control system, under the prerequisite reaching designing requirement, can reduce control appliance, simplify control method, improve operation stability.
For solving the problems of the technologies described above, the technical solution adopted in the present invention is: a kind of intermittent on-off type concrete in mass cooling water flowing control system, comprising:
Concrete temperature acquisition system, in order to gather concrete temperature;
Control terminal, for obtaining the temperature signal of concrete temperature acquisition system and comparing with the control objectives temperature of setting, then sends control signal;
Wireless control switch, for receiving the control signal that control terminal sends, and sends executive signal;
The multiple electrically operated valves be connected with wireless control switch, realize opening and closing movement in order to the executive signal receiving wireless control switch, and described electrically operated valve is arranged on cooling water pipe;
Hotspot, in order to transmission of signal between control terminal and wireless control switch.
Described control signal is break-make control signal.
Control terminal obtains concrete temperature by the database of regular visit concrete temperature acquisition system.
Concrete temperature acquisition system forms by being embedded in the temperature pick up of inside concrete and automation collection device and database.
Described temperature pick up and electrically operated valve divide into groups according to cooling water pipe, and the electrically operated valve namely on the temperature pick up of measuring concrete temperature near this cooling water pipe and this cooling water pipe is one group.
The node temperature that described control objectives temperature requires according to Concrete Design, rate of temperature fall, temperature control duration, and existing cooling water flowing experience artificially set before control starts; In control procedure, adjust according to actual conditions.
When concrete temperature is higher than control objectives temperature, control signal makes valve opening, otherwise control signal makes valve closing.
Adopt above-mentioned device to carry out cooling a method for water flowing control, comprise the following steps:
One, arrange concrete temperature acquisition system, obtain concrete temperature by temperature pick up;
Two, control terminal is installed, for obtaining the temperature signal of concrete temperature acquisition system, and compares with the control objectives temperature of setting, then sending control signal.
Three, arranging wireless control switch, for receiving the control signal of control terminal, and sending executive signal;
Four, hotspot is set, in order to transmission of signal between control terminal and wireless control switch;
Five, multiple electrically operated valve be arranged on cooling water pipe being connected with wireless control switch, for performing the executive signal of wireless control switch, realizing opening and closing movement, thus the break-make of controlled cooling model water pipe;
Realize concrete in mass cooling water flowing by above-mentioned step with higher efficiency and stability to control.
Described temperature pick up and electrically operated valve divide into groups according to cooling water pipe, and the electrically operated valve namely on the temperature pick up of measuring concrete temperature near this cooling water pipe and this cooling water pipe is one group.
Described control signal is break-make control signal.
The node temperature that described control objectives temperature requires according to Concrete Design, rate of temperature fall, temperature control duration, and existing cooling water flowing experience artificially set before control starts.In control procedure, can adjust according to actual conditions again.
A kind of intermittent on-off type concrete in mass cooling water flowing control system provided by the invention, by adopting control objectives temperature, and using the foundation that concrete observed temperature controls as cooling water flowing, without the need to arranging flow transmitter separately, namely eliminate the monitoring to water flowing flow, directly between concrete temperature and the break-make of water pipe, set up contact.Decrease intermediate link, system is simple, good stability, and control effectively, environmental suitability is strong, and equipment, human input are few, reduce and control cost.
The hotspot arranged can make control terminal and wireless control switch be linked into hotspot, thus realizes the wireless transmission of signal, avoids long distance, the wired connection under complicated landform, reduces the maintenance difficulties of system, improves the stability of system cloud gray model.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the invention will be further described.
Fig. 1 is the overall schematic of device in the present invention.
In figure: concrete temperature acquisition system 1, control terminal 2, hotspot 3, wireless control switch 4, electrically operated valve 5.
Detailed description of the invention
Embodiment 1:
As in Fig. 1, a kind of intermittent on-off type concrete in mass cooling water passage control device, comprising:
Concrete temperature acquisition system 1, namely with temperature sensor measurement concrete temperature; In this example, the scheme of optimization is the temperature pick up adopting wireless telemetering, but also can configure wired temperature pick up in part engineering, and this is normally along with pouring construction configures simultaneously, and the temperature pick up adopting wired mode is also feasible.
Control terminal 2, for obtaining the temperature signal of concrete temperature acquisition system 1 and comparing with the control objectives temperature of setting, then sends control signal; Control signal normally controls the signal of certain electrically operated valve 5 break-make, and namely described control signal is break-make control signal.When concrete temperature is higher than control objectives temperature, control signal makes valve opening, otherwise control signal makes valve closing;
Wireless control switch 4, for receiving the control signal that control terminal 2 sends, and sends executive signal,
The multiple electrically operated valves 5 be connected with wireless control switch 4, realize opening and closing movement in order to the executive signal receiving wireless control switch 4, and described electrically operated valve 5 is arranged on cooling water pipe.
Hotspot 3, in order at concrete temperature acquisition system 1, transmission of signal between control terminal 2 and wireless control switch 4.
Embodiment 2:
Adopt the device of embodiment 1 to carry out cooling a method for water flowing control, comprise the following steps:
One, arrange concrete temperature acquisition system 1, obtain concrete temperature by temperature pick up; Described temperature pick up and electrically operated valve 5 divide into groups according to cooling water pipe, and the electrically operated valve 5 namely on the temperature pick up of measuring the concrete temperature near this cooling water pipe and this cooling water pipe is one group.The temperature data that temperature pick up in this group obtains is also only for controlling the electrically operated valve 5 of this group.
Two, control terminal 2 being installed, for obtaining the temperature signal of concrete temperature acquisition system 1, and comparing with the control objectives temperature of setting, then send control signal, when concrete temperature is higher than control objectives temperature, control signal makes valve opening, otherwise control signal makes valve closing.Described control signal is break-make control signal, and namely signal only has two, accordingly, electrically operated valve 5 also only has two states, namely opens or closed condition, thus method, control very simple and reliable, especially higher at comparatively severe, that water flowing water quality the is poor operating mode stability inferior of environment.
The node temperature that control objectives temperature requires according to Concrete Design, rate of temperature fall, temperature control duration, and existing cooling water flowing experience artificially set before control starts.In control procedure, can adjust according to actual conditions again.
Control objectives temperature spot does not in the same time form a control objectives temperature line, and this line through all temperature nodes, and is straight line between adjacent temperature nodes.Temperature nodes is then determined according to designing requirement, engineering concrete condition and cooling water flowing experience.
The setting citing of temperature nodes is as table 1.
According to the temperature nodes of setting in table 1, the equation of control objectives temperature line is (establish, t is the temperature control time, and T is control temperature):
T=T0+(T1-T0)*(t-t0)/(t1-t0) (t0≤t<t1)
T=T1+(T2-T1)*(t-t1)/(t2-t1) (t1≤t<t2)
T=T2+(T3-T2)*(t-t2)/(t3-t2) (t2≤t<t3)
T=T3+(T4-T3)*(t-t3)/(t4-t3) (t3≤t<t4)
T=T4+(T5-T4)*(t-t4)/(t5-t4) (t4≤t<t5)
T=T5+(T6-T5)*(t-t5)/(t6-t5) (t5≤t≤t6)
In control procedure, inconsistent if there is such as actual Wen Fengyu setting value, the temperature control time needs the situations such as prolongation due to construction requirement, by the temperature nodes of amendment setting, can change control objectives temperature line, to meet all kinds of temperature control demand.
The designing requirement of table 1 Concrete temperature controlling and temperature nodes setting table
control time designing requirement designing requirement designing requirement temperature nodes sets temperature nodes sets temperature nodes sets
control time target temperature (DEG C) rate of temperature fall (DEG C/d) control duration (d) node time instance node temperature setting explanation
the first period cooling temperature control ≤ 28 t0 t0 after concrete spreading has vibrated, and start time and the actual measurement concrete temperature of temperature control.
the first period cooling temperature control ≤ 28 t1=t0+3 t1=27 DEG C rule of thumb set the time that highest temperature peak occurs, such as temperature control starts rear 3d, Reference Design requirement, setting concrete temperature now, such as 27 DEG C.
the first period cooling is lowered the temperature 21 ~ 23 ≤ 0.5 >=21 t2=t0+3+23 t2=22 DEG C according to the time that the cooling of designing requirement setting first phase terminates, such as temperature control starts rear 3d+23d, setting concrete temperature now, such as 22 DEG C.
mid-term cools 17 ~ 18 ≤ 0.3 >=28 t3=t0+3+23+32 t3=17.5 DEG C according to the designing requirement setting time that mid-term, cooling terminated, such as temperature control starts rear 3d+23d+32d, setting concrete temperature now, such as 17.5 DEG C.
mid-term cools temperature control t4=t0+3+23+32+15 t4=17.5 DEG C set according to designing requirement or construction requirement the time that mid-term, temperature control terminated, such as temperature control starts rear 3d+23d+32d+15d, setting concrete temperature now, such as 17.5 DEG C.
second-stage cooling is lowered the temperature 12 ~ 15 ≤ 0.3 >=42 t5=t0+3+23+32+15+45 t5=13.5 DEG C according to the time that designing requirement setting second phase cooling terminates, such as temperature control starts rear 3d+23d+32d+15d+45d, setting concrete temperature now, such as 13.5 DEG C.
second-stage cooling temperature control t6=t0+3+23+32+15+45+18 t6=13.5 DEG C set according to construction requirement the time that the second stage of temperature control terminates, such as temperature control starts rear 3d+23d+32d+15d+45d+18d, setting concrete temperature now, such as 13.5 DEG C.
Concrete temperature was undertaken by certain time interval with comparing of control objectives temperature, and the time interval is generally 30 minutes ~ 6 hours.After one time control signal sends, the on off operating mode of electrically operated valve 5 will continue a time interval, until control signal sends next time.
Software systems in control terminal 2.The automatic management to electrically operated valve 5, wireless control switch 4, hotspot 3 and data transmission system can also be realized, realize automatic acquisition and the management of concrete temperature, realize the setting of control temperature, automatically generation and adjust at any time, realize comparing and the generation of break-make instruction of observed temperature and temperature standard, realize the record to control procedure, can freely check and manual intervention, realize the compliance evaluation to control procedure.Such as: concrete rate of temperature fall under calculating, display control state, in order to instruct follow-up temperature control process.
Three, arranging wireless control switch 4, for receiving the control signal of control terminal 2, and sending executive signal; Executive signal is directly control the signal that electrically operated valve 5 carries out action.Electrically operated valve 5 is such as made to open or close.
Four, hotspot 3 is set, in order at concrete temperature acquisition system 1, transmission of signal between control terminal 2 and wireless control switch 4; Hotspot 3 achieves the wireless transmission of signal, avoids long distance, the wired connection under complicated landform, reduces the maintenance difficulties of system, improves the stability of system cloud gray model.In part engineering, concrete temperature acquisition system 1 is connected with control terminal 2 by wired mode, and does not need the signal transfer through hotspot 3.
Five, multiple electrically operated valve 5 be arranged on cooling water pipe being connected with wireless control switch 4, for performing the executive signal of wireless control switch 4, realizing opening and closing movement, thus the break-make of controlled cooling model water pipe;
Realize concrete in mass cooling water flowing by above-mentioned step with higher efficiency and stability to control.

Claims (5)

1. an intermittent on-off type concrete in mass cooling water flowing control system, is characterized in that comprising:
Concrete temperature acquisition system (1), in order to gather concrete temperature;
Control terminal (2), for obtaining the temperature signal of concrete temperature acquisition system (1) and comparing with the control objectives temperature of setting, then control signal is sent, described control signal is break-make control signal, and concrete temperature acquisition system (1) forms by being embedded in the temperature pick up of inside concrete and automation collection device and database;
Wireless control switch (4), for receiving the control signal that control terminal (2) sends, and sends executive signal;
The multiple electrically operated valves (5) be connected with wireless control switch (4), realize opening and closing movement in order to the executive signal receiving wireless control switch (4), and described electrically operated valve (5) is arranged on cooling water pipe;
Hotspot (3), in order to transmission of signal between control terminal (2) and wireless control switch (4).
2. a kind of intermittent on-off type concrete in mass cooling water flowing control system according to claim 1, is characterized in that: control terminal (2) obtains concrete temperature by the database of regular visit concrete temperature acquisition system (1).
3. a kind of intermittent on-off type concrete in mass cooling water flowing control system according to claim 1, it is characterized in that: described temperature pick up and electrically operated valve divide into groups according to cooling water pipe, the electrically operated valve namely on the temperature pick up of measuring concrete temperature near this cooling water pipe and this cooling water pipe is one group.
4. a kind of intermittent on-off type concrete in mass cooling water flowing control system according to claim 1, it is characterized in that: the node temperature that described control objectives temperature requires according to Concrete Design, rate of temperature fall, temperature control duration, and existing cooling water flowing experience artificially set before control starts; In control procedure, adjust according to actual conditions.
5. a kind of intermittent on-off type concrete in mass cooling water flowing control system according to claim 1, is characterized in that: when concrete temperature is higher than control objectives temperature, control signal makes valve opening, otherwise control signal makes valve closing.
CN201210333844.9A 2012-09-11 2012-09-11 Intermittent on-off type mass concrete cooling water supply control system Active CN102864930B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201210333844.9A CN102864930B (en) 2012-09-11 2012-09-11 Intermittent on-off type mass concrete cooling water supply control system
CN2012204604702U CN202771289U (en) 2012-09-11 2012-09-11 Intermittent on-off type large size concrete cooling water-diversion control system

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201210333844.9A CN102864930B (en) 2012-09-11 2012-09-11 Intermittent on-off type mass concrete cooling water supply control system
CN2012204604702U CN202771289U (en) 2012-09-11 2012-09-11 Intermittent on-off type large size concrete cooling water-diversion control system

Publications (2)

Publication Number Publication Date
CN102864930A CN102864930A (en) 2013-01-09
CN102864930B true CN102864930B (en) 2015-02-18

Family

ID=53871709

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201210333844.9A Active CN102864930B (en) 2012-09-11 2012-09-11 Intermittent on-off type mass concrete cooling water supply control system
CN2012204604702U Expired - Fee Related CN202771289U (en) 2012-09-11 2012-09-11 Intermittent on-off type large size concrete cooling water-diversion control system

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN2012204604702U Expired - Fee Related CN202771289U (en) 2012-09-11 2012-09-11 Intermittent on-off type large size concrete cooling water-diversion control system

Country Status (1)

Country Link
CN (2) CN102864930B (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102864930B (en) * 2012-09-11 2015-02-18 葛洲坝集团试验检测有限公司 Intermittent on-off type mass concrete cooling water supply control system
CN103970076A (en) * 2013-01-30 2014-08-06 张永生 Large-volume deposit concrete cooling water intelligent control system
CN103603497A (en) * 2013-11-27 2014-02-26 天津大学 Intelligent cooling device for mass concrete
CN103741692B (en) * 2013-12-23 2016-01-13 中国水利水电科学研究院 A kind of intelligent water communication method of mass concrete and the system of use the method
CN106738350A (en) * 2016-12-07 2017-05-31 徐州徐工施维英机械有限公司 Concrete mixing plant multi-mode temperature control methods, devices and systems
CN107402076A (en) * 2017-07-13 2017-11-28 中国水利水电科学研究院 Concrete temperature detection means and method
CN108643185A (en) * 2018-05-28 2018-10-12 山西六建集团有限公司 A kind of mass concrete temperature control system
CN111309081B (en) * 2020-03-11 2022-03-15 河南天平工程质量检测有限公司 Method for realizing automatic regulation of health preserving room temperature and humidity
CN113386242B (en) * 2021-06-08 2022-05-27 华恒建设集团有限公司 Special-shaped concrete line mold and construction process thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003193680A (en) * 2001-12-27 2003-07-09 Topy Ind Ltd Temperature control system of fluid and heat exchanger used for the system
CN101285308A (en) * 2008-05-09 2008-10-15 水利部交通部电力工业部南京水利科学研究院 Device and method for controlling temperature of concrete curing water
CN101871266A (en) * 2010-07-07 2010-10-27 葛洲坝集团试验检测有限公司 Automatic collecting system of concrete cooling water-flowing data
CN101921134A (en) * 2010-07-16 2010-12-22 葛洲坝集团试验检测有限公司 Intelligent cooling water passage system for concrete
CN202150037U (en) * 2011-04-15 2012-02-22 中国水利水电科学研究院 Temperature control and crack prevention digital dynamic monitoring system for concrete dam
CN202771289U (en) * 2012-09-11 2013-03-06 葛洲坝集团试验检测有限公司 Intermittent on-off type large size concrete cooling water-diversion control system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003193680A (en) * 2001-12-27 2003-07-09 Topy Ind Ltd Temperature control system of fluid and heat exchanger used for the system
CN101285308A (en) * 2008-05-09 2008-10-15 水利部交通部电力工业部南京水利科学研究院 Device and method for controlling temperature of concrete curing water
CN101871266A (en) * 2010-07-07 2010-10-27 葛洲坝集团试验检测有限公司 Automatic collecting system of concrete cooling water-flowing data
CN101921134A (en) * 2010-07-16 2010-12-22 葛洲坝集团试验检测有限公司 Intelligent cooling water passage system for concrete
CN202150037U (en) * 2011-04-15 2012-02-22 中国水利水电科学研究院 Temperature control and crack prevention digital dynamic monitoring system for concrete dam
CN202771289U (en) * 2012-09-11 2013-03-06 葛洲坝集团试验检测有限公司 Intermittent on-off type large size concrete cooling water-diversion control system

Also Published As

Publication number Publication date
CN202771289U (en) 2013-03-06
CN102864930A (en) 2013-01-09

Similar Documents

Publication Publication Date Title
CN102864930B (en) Intermittent on-off type mass concrete cooling water supply control system
CN108240679B (en) A kind of heat supply method based on building heating load prediction, device and system
CN109595763A (en) Control strategy optimization method and device of air conditioning system and computer equipment
CN201611141U (en) Thermal balance intelligent regulating system of heat supply network
CN106774247B (en) Simulation test system and test method for central air conditioner
CN102705955B (en) The cloud management system of environment and refrigeration
CN104141982A (en) Heat supply network heat balance control method and system
CN102607143A (en) Remote monitoring method and remote monitoring system for air conditioners of base stations
CN104515271A (en) Energy conservation optimization control system and method for central air conditioner refrigeration station system
CN106774515B (en) A kind of heatingup of coke oven battery intelligent temperature control system and control method
WO2017004963A1 (en) Remote transmission communication system for temperature control and heat metering and method therefor
CN101881976A (en) Automated wireless management control system for urban water affairs
CN107543243A (en) A kind of method and system of public building heating energy
CN114048694B (en) Leakage positioning method based on Internet of things and hydraulic model
CN104329570A (en) Monitoring and control method of water supply pipe network
CN105864881A (en) Novel intelligent home heating system and demand control method thereof
CN104390146A (en) Monitoring system of water supply pipeline network based on Internet of Things
CN105783078A (en) Heat energy area heating control system and method
CN101726038A (en) Centralized heat supply control system
CN207365324U (en) A kind of big data intelligent air condition equipment with household metering
CN108563195A (en) The long-distance monitoring method and system of glass bending molding machine
CN205842842U (en) A kind of novel intelligent domestic heating system
CN108518732B (en) Internet-based automatic heat supply network operation management system and control method thereof
CN101393455A (en) Waterworks monitoring, managing and scheduling apparatus
CN115793558A (en) Heating power station secondary pipe network intelligence control system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Zhou Hougui

Inventor after: Zhang Zhikui

Inventor after: Hu Dizhong

Inventor after: Ning Jinhua

Inventor after: Zhang Xinyuan

Inventor after: Cao Yonghui

Inventor after: Huang Danyong

Inventor after: Li Jun

Inventor after: Li Mingchuan

Inventor after: Zheng Jiang

Inventor after: Wang Jimin

Inventor after: Chen Zhiyuan

Inventor after: Duan Shaohui

Inventor after: Tan Kaiyan

Inventor after: Yu Ying

Inventor after: Hu Shuhong

Inventor after: Li Meng

Inventor after: Wu You

Inventor before: Chen Zhiyuan

Inventor before: Cao Yonghui

Inventor before: Huang Danyong

Inventor before: Li Jun

Inventor before: Zhou Hougui

Inventor before: Yu Ying

Inventor before: Tan Kaiyan

Inventor before: Li Meng

Inventor before: Wu You

Inventor before: Zhang Zhikui

Inventor before: Hu Dizhong

Inventor before: Zhang Xinyuan

COR Change of bibliographic data
TR01 Transfer of patent right

Effective date of registration: 20160518

Address after: 443002 Hubei province Yichang City Road No. 25

Patentee after: Gezhouba Testing Co., Ltd.

Patentee after: Yalongjiang River Basin Hydropower Development Co., Ltd.

Address before: 443002 Hubei province Yichang City Road No. 25

Patentee before: Gezhouba Testing Co., Ltd.