CN202769079U - Sleeve pipe of floor pipeline - Google Patents

Sleeve pipe of floor pipeline Download PDF

Info

Publication number
CN202769079U
CN202769079U CN 201220448799 CN201220448799U CN202769079U CN 202769079 U CN202769079 U CN 202769079U CN 201220448799 CN201220448799 CN 201220448799 CN 201220448799 U CN201220448799 U CN 201220448799U CN 202769079 U CN202769079 U CN 202769079U
Authority
CN
China
Prior art keywords
sleeve pipe
pipeline
sleeve
cover plate
floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220448799
Other languages
Chinese (zh)
Inventor
游兴荣
宣桂鹏
李志钱
王庆洲
单为
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd
Original Assignee
Second Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd filed Critical Second Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd
Priority to CN 201220448799 priority Critical patent/CN202769079U/en
Application granted granted Critical
Publication of CN202769079U publication Critical patent/CN202769079U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a sleeve pipe of a floor pipeline. The sleeve pipe of the floor pipeline comprises a sleeve pipe body, wherein ring-shaped strengthening ribs which are everted are arranged on the upper edge and the lower edge of the sleeve pipe, and a waterstop ring is arranged in the middle of the sleeve pipe. A cover plate is arranged at the bottom of the sleeve pipe, an opening of the bottom of the sleeve pipe is sealed by the cover plate, glossy paper which is used for protecting is arranged at the bottom of the sleeve pipe, a double faced adhesive tape is arranged on the glossy paper in a self mode, and nicks are arranged outside a lower-edge ring-shaped strengthening rib. The sleeve pipe is made of polyvinyl chloride (PVC) materials. The sleeve pipe is pre-buried in a casting layer of a floor, in the process of installing of a pipeline, the pipeline is directly inserted into an inner cavity of the sleeve pipe, after installing is finished, a decorative sleeve is covered on the sleeve pipe, so that good visual effect is formed, and the common quality problems of leakage of the floor pipeline are thoroughly solved.

Description

A kind of sleeve pipe of crossing floor slab pipeline
Technical field
The utility model relates to a kind of sleeve pipe of crossing floor slab pipeline.
Background technique
Building is built, when building toilet, kitchen, balcony, need to be on floor reserving hole, be used for the later stage to install water, drainage pipe etc., it also is more and more high along with the raising of the modern life level outfit of various facilities being required, such as pipelines such as heating installation, coal gas.Usual reserving hole is to carry out in civil engineering floor construction construction period, that is to say after slab form installs, and settles tub in the above or short steel pipes is installed to solidify rear dismounting wait the floorslab concrete of building and be used for the later stage floor slab pipeline was installed.Because hole is to reserve, add the defective of fixation method, often the phenomenon that is shifted can appear in reserving hole, operator put in place the elongated reserving hole size that all strengthened in order to guarantee follow-up pipeline to be installed by (assurance horizontal position and up and down perpendicularity), certainly will to carry out shutoff to the space between preformed hole position floor and the pipeline after crossing the floor slab pipeline installation, this position new-old concrete is difficult in conjunction with reason, operator are to the cleaning at this position, the template installation quality, fragmentary materials when particularly building this position concrete, operator are difficult to cause serious hidden leakage defect to affect the user and normally use according to the code requirement careful shutoff of water-proof concrete.
Summary of the invention
The technical problems to be solved in the utility model provides a kind of sleeve pipe of crossing floor slab pipeline.
In order to solve the problems of the technologies described above, the technical solution adopted in the utility model is: a kind of sleeve pipe of crossing floor slab pipeline, comprise sleeve body, and the upper edge of sleeve pipe is equipped with the cyclic reinforcing rib that turns up with lower edge, and the sleeve pipe middle part is provided with water stop ring.
As preferably, sleeve bottom is provided with cover plate; Cover plate seals the opening of sleeve bottom, and cover plate is connected with the sleeve pipe tube wall and is provided with pre-weak trace along one week of tube wall.
As preferably, sleeve bottom is provided with protection and uses glossy paper, and described glossy paper carries two sided plaster.
As preferably, be provided with 4 indentations outside the cyclic reinforcing rib on lower edge, 4 indentations radially and with the sleeve pipe circumference press 90 along sleeve pipe °Divide equally.
As preferably, sleeve pipe is that the PVC material is made.
The beneficial effects of the utility model are:
Sleeve pipe pre-embedding in the floor pouring layer, is directly inserted cannula cavity during pipe laying, thoroughly solved the common quality defect of crossing the floor slab pipeline seepage.
Description of drawings
Below in conjunction with the drawings and specific embodiments the utility model is described in further detail.
Fig. 1 is the structural representation that the utility model is crossed the sleeve pipe embodiment of floor slab pipeline.
Among the figure, the 1-sleeve pipe, the 2-stiffening rib, the 3-water stop ring, the 4-stiffening rib, the 5-cover plate, the 6-concrete, 7-levelling slope layer, 8-floor hardstanding, 9-outer jointing jacket, 10-are crossed the building pipeline.
Embodiment
Fig. 1 is a kind of sleeve pipe 1 of crossing floor slab pipeline, and sleeve pipe is that the PVC material is made.
The upper edge of sleeve pipe is provided with the cyclic reinforcing rib 2 that turns up, and the lower edge of sleeve pipe also is provided with the cyclic reinforcing rib 4 that turns up, and the sleeve pipe middle part is provided with water stop ring 3.
Be provided with the thick cover plate of 2mm 5 at sleeve bottom, cover plate seals the opening of sleeve bottom.Cover plate can prevent that foreign matter is fallen into when last pipe laying.Knock out cover plate when making things convenient for pipe laying, at cover plate and be provided with pre-weak trace in one week of internal surface of sleeve pipe joint.
Be provided with the thick protection glossy paper of 2mm at sleeve bottom, glossy paper carries two sided plaster.
Cyclic reinforcing rib 4 outsides on lower edge are provided with 4 indentations, and 4 indentations radially and with the sleeve pipe circumference press 90 along sleeve pipe °Divide equally.
During installation, will protect with glossy paper first and tear, outer 4 indentations of the cyclic reinforcing rib on lower edge to upper eject in advance the cross line of ink marker that comes after, adhesive coating is placed directly in knocks gently bonding on the template firmly, stack around then that a little concrete is fixing to be got final product.
Fig. 2 is for installing and using schematic diagram.
Slab thickness normal design 110mm, along stiffening rib 2 and lower between stiffening rib 4, the centre is middle water stop ring 3 to the concrete of floor cast upper.Levelling slope layer 7 at the floor concrete; the ground hardstanding 8 that floor tile consists of above the levelling slope layer 7; pipeline 10 inserts sleeve pipe 1 inner chamber; then with outer jointing jacket 9 slit is sealed with epoxy resin glue; save the trouble of after-pouring concrete sealing hole and the worry of leaking, thoroughly solved the common quality defect of floor slab pipeline seepage.
The installation method of outer jointing jacket 9: when pipe laying, be inserted in advance the pipeline of installation, after the pipeline installation, just in time put down and be stuck in sleeve opening, then seal with resin glue at outer jointing jacket 9 and pipeline 10 contact position.
When pipe laying, cover plate 9 destroyed along pre-weak trace get final product.
The specification of through-flooring pipeline is generally 50mm, 75mm, 110mm or 160mm, inserts sleeve pipe for making things convenient for pipeline, and sleeve pipe 1 internal diameter can be selected the external diameter 20mm greater than pipeline 10.

Claims (5)

1. sleeve pipe of crossing floor slab pipeline, it is characterized in that: comprise sleeve body, the upper edge of described sleeve pipe is equipped with the cyclic reinforcing rib that turns up with lower edge, and the sleeve pipe middle part is provided with water stop ring.
2. the sleeve pipe of crossing floor slab pipeline according to claim 1, it is characterized in that: described sleeve bottom is provided with cover plate; Described cover plate seals the opening of sleeve bottom, and cover plate is connected with the sleeve pipe tube wall and is provided with pre-weak trace along one week of tube wall.
3. the sleeve pipe of crossing floor slab pipeline according to claim 1, it is characterized in that: described sleeve bottom is provided with protection and uses glossy paper, and described glossy paper carries two sided plaster.
4. the sleeve pipe of crossing floor slab pipeline according to claim 1, it is characterized in that: the cyclic reinforcing rib outside on described lower edge is provided with 4 indentations, 4 indentations along sleeve pipe radially and with the sleeve pipe circumference by 90 °Divide equally.
5. the sleeve pipe of crossing floor slab pipeline according to claim 1, it is characterized in that: described sleeve pipe is that the PVC material is made.
CN 201220448799 2012-09-05 2012-09-05 Sleeve pipe of floor pipeline Expired - Fee Related CN202769079U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220448799 CN202769079U (en) 2012-09-05 2012-09-05 Sleeve pipe of floor pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220448799 CN202769079U (en) 2012-09-05 2012-09-05 Sleeve pipe of floor pipeline

Publications (1)

Publication Number Publication Date
CN202769079U true CN202769079U (en) 2013-03-06

Family

ID=47775654

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220448799 Expired - Fee Related CN202769079U (en) 2012-09-05 2012-09-05 Sleeve pipe of floor pipeline

Country Status (1)

Country Link
CN (1) CN202769079U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106592788A (en) * 2016-12-22 2017-04-26 中国核工业二四建设有限公司 Blocking device for high pressure hole, construction method and application thereof
CN107191202A (en) * 2017-08-01 2017-09-22 上海隧道工程有限公司构件分公司 The Grouting Pipe and its grouting method of section of jurisdiction

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106592788A (en) * 2016-12-22 2017-04-26 中国核工业二四建设有限公司 Blocking device for high pressure hole, construction method and application thereof
CN106592788B (en) * 2016-12-22 2020-05-19 中国核工业二四建设有限公司 High-pressure hole plugging device
CN107191202A (en) * 2017-08-01 2017-09-22 上海隧道工程有限公司构件分公司 The Grouting Pipe and its grouting method of section of jurisdiction
CN107191202B (en) * 2017-08-01 2024-01-26 上海隧道工程智造海盐有限公司 Grouting pipe for pipe piece and grouting method thereof

Similar Documents

Publication Publication Date Title
CN110878700B (en) Tunnel waterproof structure and construction method thereof
CN203222815U (en) Composite basement-structure exterior wall construction formed by utilizing underground diaphragm wall
CN207527149U (en) A kind of underground structure embedded wall penetration pipe water-tight device
CN103161173B (en) Shut-in construction method of pumping shaft in basement base plate
CN104264700A (en) Seepage prevention construction method for light-weight precipitation well point post-cast strip of underground construction
CN106592788A (en) Blocking device for high pressure hole, construction method and application thereof
CN202769079U (en) Sleeve pipe of floor pipeline
CN103587338A (en) Bearing platform waterscape
CN109025899B (en) Well sealing device
CN111473165A (en) Waterproof structure of superimposed sheet and PVC water piping connection department
CN104278717A (en) Waterproof and drainage structure of sunken toilet
CN107504277A (en) A kind of underground structure embedded wall penetration pipe water-tight device
CN204533836U (en) Pipeline through-flooring leakage-resistant device
CN206708563U (en) A kind of water proof structure of Pipeline Crossing Program floor
CN104964121A (en) Blockage method for leakage water in sleeve pipe
CN104455757A (en) Downcomer assembly and installation method thereof
CN103062511A (en) Processing method for preventing water leakage at contact position of polyvinyl chloride (PVC) tube and concrete floor slab
CN107630467A (en) One kind exhaust valve pit
CN204174629U (en) A kind of light-duty precipitation well point ater-casting, underground building multi-way prevention plugging structure
CN209568553U (en) Flexible water sealing system
CN206667445U (en) Bathroom floor drain waterproof node
CN110568171A (en) method for detecting grouting fullness of pier connecting sleeve by applying water injection
CN106522230B (en) Installation and grouting construction method of pre-buried grouting pipe assembly
CN212868781U (en) Waterproof structure of superimposed sheet and PVC water piping connection department
CN106801465A (en) Anti-pollution anti-water leakage embedded floor drain adapter sleeve method and device and floor drain apparatus

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130306

Termination date: 20140905

EXPY Termination of patent right or utility model