CN110568171A - method for detecting grouting fullness of pier connecting sleeve by applying water injection - Google Patents

method for detecting grouting fullness of pier connecting sleeve by applying water injection Download PDF

Info

Publication number
CN110568171A
CN110568171A CN201910948524.6A CN201910948524A CN110568171A CN 110568171 A CN110568171 A CN 110568171A CN 201910948524 A CN201910948524 A CN 201910948524A CN 110568171 A CN110568171 A CN 110568171A
Authority
CN
China
Prior art keywords
water injection
connecting sleeve
injection pipe
pipe
bridge pier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201910948524.6A
Other languages
Chinese (zh)
Inventor
何余良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
University of Shaoxing
Original Assignee
University of Shaoxing
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by University of Shaoxing filed Critical University of Shaoxing
Priority to CN201910948524.6A priority Critical patent/CN110568171A/en
Publication of CN110568171A publication Critical patent/CN110568171A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/16Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
    • E04C5/162Connectors or means for connecting parts for reinforcements
    • E04C5/163Connectors or means for connecting parts for reinforcements the reinforcements running in one single direction
    • E04C5/165Coaxial connection by means of sleeves
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N33/00Investigating or analysing materials by specific methods not covered by groups G01N1/00 - G01N31/00
    • G01N33/38Concrete; Lime; Mortar; Gypsum; Bricks; Ceramics; Glass
    • G01N33/383Concrete or cement

Landscapes

  • Engineering & Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Food Science & Technology (AREA)
  • Ceramic Engineering (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Medicinal Chemistry (AREA)
  • Physics & Mathematics (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a method for detecting grouting fullness of a bridge pier connecting sleeve by water injection, which adopts a bridge pier connecting sleeve, wherein a connecting main rib is arranged in the hollow interior of the connecting sleeve; the top end of the connecting sleeve is provided with a sealing ring; a water injection pipe is arranged in the sleeve, one end of the water injection pipe is fixed on the sealing ring, and the other end of the water injection pipe is arranged outside the connecting sleeve; two ends of the water injection pipe are provided with plugs; the method comprises the following steps: firstly, processing a connecting main rib, a connecting sleeve, a sealing ring and a water injection pipe, wherein the water injection pipe is stuck on the sealing ring; secondly, mounting the connecting main bar, the connecting sleeve, the sealing ring and the water injection pipe in place when the bridge pier steel bar is manufactured; thirdly, pouring to finish the prefabricated bridge pier; fourthly, the prefabricated bridge pier is installed in place, and mortar is injected into the connecting sleeve; and fifthly, injecting water into the barrel through a water injection pipe after the mortar reaches the design strength, and calculating the plumpness of the mortar according to the water injection amount. The detection method relates to the field of assembly type buildings, the connecting sleeve is convenient to assemble, and the method is simple to operate.

Description

Method for detecting grouting fullness of pier connecting sleeve by applying water injection
Technical Field
The invention relates to the field of fabricated buildings, in particular to a method for detecting grouting fullness of a pier connecting sleeve by using water injection.
Background
With the further advance of bridge industrialization, the traditional construction mode of casting all on site is gradually changed into a construction mode of prefabricating a part or most of components in factory and then transporting the prefabricated components to the site for installation. In the process of bridge industrialization, an upper structure is earlier than a lower structure, the bridge industrialization mainly refers to the industrialization of the lower structure at present, namely a pier and a capping beam, wherein a prefabricated pier and a bearing platform are generally connected by a sleeve; because the intensity of the cylinder body of the connecting sleeve is far higher than the intensity of the slurry in the cylinder body, the plumpness of the low-strength slurry in the high-strength shell is very difficult to detect by adopting rays, and meanwhile, due to the diffraction effect of the high-strength shell material, whether the slurry in the connecting sleeve is full or not can not be detected by adopting ultrasonic waves, so that the industrial development of bridges can be seriously prevented.
in view of the above problems, the present invention provides a method for detecting grouting fullness of a bridge pier connection sleeve by injecting water, and a product thereof.
disclosure of Invention
The invention provides a method for detecting grouting fullness of a bridge pier connecting sleeve by water injection.
Specifically, the invention is realized by the following technical scheme:
A method for detecting grouting fullness of a bridge pier connecting sleeve by water injection comprises the steps of adopting a bridge pier connecting sleeve, wherein a main connecting rib is arranged in the hollow interior of the connecting sleeve and penetrates through the upper end and the lower end of the connecting sleeve; the top end of the connecting sleeve is provided with a sealing ring which is positioned between the connecting sleeve and the connecting main rib; mortar is filled in the gap between the main connecting rib and the connecting sleeve; a water injection pipe is arranged in the connecting sleeve, one end of the water injection pipe is connected with the sealing ring in the connecting sleeve, and the other end of the water injection pipe penetrates out of the connecting sleeve and is arranged outside the connecting sleeve; two ends of the water injection pipe are provided with plugs;
The method comprises the following steps:
processing a connecting main rib, a connecting sleeve, a sealing ring and a water injection pipe according to a design drawing, adhering the water injection pipe on the sealing ring, and firmly plugging two ends of the water injection pipe by using plugs;
Secondly, according to design requirements, when the bridge pier steel bars are manufactured, the connecting main bars, the connecting sleeves, the sealing rings and the water injection pipes are installed in place;
thirdly, after the pier reinforcing steel bars are manufactured, installing a pier template, pouring pier concrete, maintaining the pier, and dismantling the pier template system after the strength of the concrete slab is achieved;
Transporting the prefabricated bridge pier to a construction site, installing the prefabricated bridge pier in place, and injecting mortar into the connecting sleeve through a grouting pipe to complete the prefabricated bridge pier connecting structure;
and fifthly, after the mortar reaches the design strength, injecting water into the connecting sleeve by using water injection equipment through a water injection pipe, and calculating the plumpness of the slurry according to the water injection amount.
further, the bridge pier connecting sleeve comprises a cylinder, a grouting pipe and a grout outlet pipe; the interior of the cylinder body is hollow; the lower part of the cylinder wall is provided with a grouting pipe, the upper part of the cylinder wall is provided with a slurry outlet pipe, and the grouting pipe and the slurry outlet pipe are both hollow and communicated with the hollow interior of the cylinder; the water injection pipe passes through the slurry outlet pipe.
further, the water injection pipe is connected with the sealing ring through an epoxy layer.
Preferably, the cylinder is embodied as a cast iron pipe.
The pier connecting sleeve is internally provided with the water injection pipe, the water injection pipe is arranged in the connecting sleeve in advance when the pier is prefabricated, and any detection device is not required to be arranged in the connecting sleeve subsequently, so that the aims of quick assembly and quick detection are fulfilled, and meanwhile, the safety of the integral structure of the pier is not influenced by the arrangement of the water injection pipe; meanwhile, water is injected into a water injection pipe reserved in the slurry outlet pipe, so that the space which is not filled with the grouting material in the connecting sleeve is filled with the water, the volume of the grouting material gap is expressed by adopting the volume of the injected water, and the fullness of the grouting material in the connecting sleeve is calculated; meanwhile, the water injected into the connecting sleeve can be evaporated along with time, and no potential safety hazard is generated to the structure of the pier.
drawings
FIG. 1 is a schematic diagram of one particular embodiment of the present invention;
Fig. 2 is a partial structural schematic diagram of the present invention.
Wherein: 1. a connecting sleeve; 2. a grouting pipe; 3. a pulp outlet pipe; 4. a barrel; 5. a water injection pipe; 51. a plug; 6. connecting the main ribs; 7. mortar; 8. a seal ring; 9. and (3) an epoxy layer.
The specific implementation mode is as follows:
The invention is further described with reference to the following figures and detailed description.
As shown in fig. 1 and 2, the invention provides a method for detecting grouting fullness of a pier connecting sleeve 1 by water injection, which adopts the pier connecting sleeve 1, wherein the pier connecting sleeve 1 comprises a cylinder 4, a grout outlet pipe 3 and a grouting pipe 2; the cylinder 4 is hollow; the barrel 4 is provided with slip casting pipe 2 on the lower part section of thick bamboo wall, is provided with out thick liquid pipe 3 on the upper portion section of thick bamboo wall, and slip casting pipe 2 all is hollow with out thick liquid pipe 3 inside, with the inside intercommunication of barrel 4 cavity.
the connecting sleeve 1 is provided with a main connecting rib 6 in the hollow interior, and the main connecting rib 6 penetrates through the upper end and the lower end of the connecting sleeve 1. Mortar 7 is filled in a gap between the main connecting rib 6 and the connecting sleeve 1; the top end of the connecting sleeve 1 is provided with a sealing ring 8, and the sealing ring 8 is positioned between the connecting sleeve 1 and the main connecting rib 6.
the sealing ring 8 is matched with the connecting sleeve 1, so that the connecting sleeve 1 is prevented from being blocked by concrete slurry leakage when the pier is poured. The material of the sealing ring 8 can be selected from rubber.
A water injection pipe 5 is fixed on the inner wall of the upper end of the cylinder 4, one end of the water injection pipe 5 is connected with the inner wall of the upper end of the cylinder 4 or a sealing ring 8 in the cylinder 4, and the other end of the water injection pipe 5 penetrates through the inside of the slurry outlet pipe 3 and is arranged outside the cylinder 4; two ends of the water injection pipe 5 are firmly blocked by plugs 51 respectively to prevent the water injection pipe 5 from being blocked during grouting; when detecting, take off the end cap 51 of the water injection pipe 5 outside the connecting sleeve 1, use water injection equipment to inject water into the water injection pipe 5, utilize water pressure to extrude the end cap 51 of the water injection pipe 5 inside the connecting sleeve 1, and the water flows into the connecting sleeve 1.
a concrete mode that water injection pipe 5 and barrel 4 are fixed does: epoxy glue is smeared on the surface of the water injection pipe 5 to form an epoxy layer 9, and the water injection pipe 5 is fixed on the top end of the inner wall of the cylinder 4 or at the position of the sealing ring 8 by utilizing the viscosity of the epoxy glue.
A method for detecting grouting fullness of a pier connecting sleeve 1 by water injection comprises the following steps:
Processing a connecting main rib 6, a connecting sleeve 1, a sealing ring 8 and a water injection pipe 5 according to a design drawing, adhering the water injection pipe 5 on the sealing ring 8 by using an epoxy layer 9, and firmly plugging two ends of the water injection pipe 5 by using plugs 51;
Secondly, according to design requirements, when the bridge pier steel bars are manufactured, the connecting main bars 6, the connecting sleeve 1, the sealing rings 8 and the water injection pipes 5 are installed in place;
Thirdly, after the pier reinforcing steel bars are manufactured, installing a pier template, pouring pier concrete, maintaining the pier, and dismantling the pier template system after the strength of the concrete slab is achieved;
transporting the prefabricated bridge pier to a construction site, installing the prefabricated bridge pier in place, and injecting mortar 7 into the connecting sleeve 1 through the grouting pipe 2 to complete the prefabricated bridge pier connecting structure;
and fifthly, after the mortar 7 reaches the design strength, injecting water into the connecting sleeve 1 through a water injection pipe 5 by using water injection equipment, and calculating the plumpness of the slurry according to the water injection amount.
In the invention, the size of the connecting main rib 6 and the concentration of the mortar 7 are determined by the existing specifications.
In the invention, the structural sizes and the strength grades of the grouting pipe 2, the cylinder 4 and the grout outlet pipe 3 are determined by calculation according to the existing specifications.
In the invention, the size and the material strength of the water injection pipe 5 are determined according to design requirements.
In the present invention, the size and material design of the plug 51 needs to be determined.
The specific dimensions of a coupling sleeve 1 are: the total length of the connecting sleeve 1 is 810mm, the outer diameter is 95mm, the inner diameter of the bottom of the connecting sleeve is 70mm, the inner diameter of the bottom of the connecting sleeve is 60mm, the inner diameter of the bottom of the connecting sleeve is connected with a bearing platform, and the distance between the center of a grouting opening and the edge of the bottom of the connecting sleeve is 50 mm. The material of the connecting sleeve 1 can be selected from cast iron.
The specific dimensions of one water injection pipe 5 are: the total length of the water injection pipe 5 is 250mm, and the diameter is 5 mm.
The plug 51 is matched with the water injection pipe 5, and the material of the plug 51 can be rubber.
the above is the preferred embodiment of the present invention, and several other simple substitutions and modifications made on the premise of the inventive concept should be considered as falling into the protection scope of the present invention.

Claims (4)

1. The method for detecting grouting fullness of the bridge pier connecting sleeve by using water injection is characterized by comprising the following steps of: the bridge pier connecting sleeve is adopted, a main connecting rib is arranged in the hollow interior of the connecting sleeve, and the main connecting rib penetrates through the upper end and the lower end of the connecting sleeve; the top end of the connecting sleeve is provided with a sealing ring which is positioned between the connecting sleeve and the connecting main rib; mortar is filled in the gap between the main connecting rib and the connecting sleeve; a water injection pipe is arranged in the connecting sleeve, one end of the water injection pipe is connected with the sealing ring in the connecting sleeve, and the other end of the water injection pipe penetrates out of the connecting sleeve and is arranged outside the connecting sleeve; two ends of the water injection pipe are provided with plugs;
The method comprises the following steps:
processing a connecting main rib, a connecting sleeve, a sealing ring and a water injection pipe according to a design drawing, adhering the water injection pipe on the sealing ring, and firmly plugging two ends of the water injection pipe by using plugs;
Secondly, according to design requirements, when the bridge pier steel bars are manufactured, the connecting main bars, the connecting sleeves, the sealing rings and the water injection pipes are installed in place;
Thirdly, after the pier reinforcing steel bars are manufactured, installing a pier template, pouring pier concrete, maintaining the pier, and dismantling the pier template system after the strength of the concrete slab is achieved;
transporting the prefabricated bridge pier to a construction site, installing the prefabricated bridge pier in place, and injecting mortar into the connecting sleeve through a grouting pipe to complete the prefabricated bridge pier connecting structure;
And fifthly, after the mortar reaches the design strength, injecting water into the connecting sleeve by using water injection equipment through a water injection pipe, and calculating the plumpness of the slurry according to the water injection amount.
2. The method for detecting grouting fullness of a bridge pier connecting sleeve by water injection according to claim 1, wherein the method comprises the following steps: the bridge pier connecting sleeve comprises a cylinder, a grouting pipe and a grout outlet pipe; the interior of the cylinder body is hollow; the lower part of the cylinder wall is provided with a grouting pipe, the upper part of the cylinder wall is provided with a slurry outlet pipe, and the grouting pipe and the slurry outlet pipe are both hollow and communicated with the hollow interior of the cylinder; the water injection pipe passes through the slurry outlet pipe.
3. The method for detecting grouting fullness of a bridge pier connecting sleeve by water injection according to claim 2, wherein the method comprises the following steps: the cylinder is a cast iron pipe.
4. The method for detecting grouting fullness of a bridge pier connecting sleeve by water injection according to claim 1, wherein the method comprises the following steps: the water injection pipe is connected with the sealing ring through an epoxy layer.
CN201910948524.6A 2019-10-08 2019-10-08 method for detecting grouting fullness of pier connecting sleeve by applying water injection Withdrawn CN110568171A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910948524.6A CN110568171A (en) 2019-10-08 2019-10-08 method for detecting grouting fullness of pier connecting sleeve by applying water injection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910948524.6A CN110568171A (en) 2019-10-08 2019-10-08 method for detecting grouting fullness of pier connecting sleeve by applying water injection

Publications (1)

Publication Number Publication Date
CN110568171A true CN110568171A (en) 2019-12-13

Family

ID=68783941

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910948524.6A Withdrawn CN110568171A (en) 2019-10-08 2019-10-08 method for detecting grouting fullness of pier connecting sleeve by applying water injection

Country Status (1)

Country Link
CN (1) CN110568171A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114778808A (en) * 2022-05-16 2022-07-22 山东国建工程集团有限公司 Building block mud plumpness detection device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114778808A (en) * 2022-05-16 2022-07-22 山东国建工程集团有限公司 Building block mud plumpness detection device
CN114778808B (en) * 2022-05-16 2024-04-02 山东国建工程集团有限公司 Building block mud plumpness detection device

Similar Documents

Publication Publication Date Title
RU2651681C2 (en) Rock anchor bolt
CN204901197U (en) Drainage pipe that diameter is 300 -600mm is with local slip casting prosthetic devices
CN104594348A (en) Expanded head capsule type anchor rod and construction method thereof
CN208981531U (en) A kind of prefabricated assembled parapet connection structure
CN103556644A (en) Basement bottom plate dewatering well mouth plugging casing and construction method
CN207527149U (en) A kind of underground structure embedded wall penetration pipe water-tight device
CN101215837A (en) Fast plugging device for deep foundation pit precipitation well
CN112376571A (en) Pile side and pile end integrated grouting device and construction method thereof
CN102839691B (en) Quick sealing method and device for sandless cement pipe deep well dewatering wellhead
CN112832279A (en) Waterproof structure and method for dewatering well of underground foundation pit
CN204343330U (en) A kind of plastic drain-pipe and manhole sealing and connecting device
CN110568170A (en) Method for detecting grouting fullness of pier connecting sleeve by applying air bag
CN110568171A (en) method for detecting grouting fullness of pier connecting sleeve by applying water injection
CN214614083U (en) Grouting assembly for repairing quality defects of karst geological cast-in-place pile
CN110593894B (en) Novel shield tunnel concrete pipe piece miniature reinforcing pile
CN107504277A (en) A kind of underground structure embedded wall penetration pipe water-tight device
CN208295326U (en) Full corrosion-proof lining formula Prestressed concrete cylinder pipe
CN201649099U (en) Grout injector metal casting
CN105735937A (en) Plugging device for water-inrush borehole by filtration flow and pressure relief of hole wall and grouting and fixing of in-hole bushing
CN105332383A (en) Device for rapidly blocking dewatering pipe well through drainage and decompression and method of device
CN210661689U (en) Floor penetrating structure of vertical drainage pipe of kitchen
CN202769079U (en) Sleeve pipe of floor pipeline
CN208950609U (en) A kind of integrated stick of the osmotic grouting suitable for shield tunnel
CN219588298U (en) Waterproof shutoff structure of basement outer wall steam pipeline
CN219734486U (en) Novel pre-buried sleeve pipe of floor downcomer

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20191213

WW01 Invention patent application withdrawn after publication