CN202767298U - Curtain wall structure of interlayer unit - Google Patents
Curtain wall structure of interlayer unit Download PDFInfo
- Publication number
- CN202767298U CN202767298U CN2012202626622U CN201220262662U CN202767298U CN 202767298 U CN202767298 U CN 202767298U CN 2012202626622 U CN2012202626622 U CN 2012202626622U CN 201220262662 U CN201220262662 U CN 201220262662U CN 202767298 U CN202767298 U CN 202767298U
- Authority
- CN
- China
- Prior art keywords
- curtain wall
- cell curtain
- unit curtain
- switching crossbeam
- unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Load-Bearing And Curtain Walls (AREA)
Abstract
The utility model relates to a curtain wall structure of an interlayer unit, which comprises a unit curtain wall component, upper channel steel, lower channel steel and a unit curtain wall plate component, wherein the unit curtain wall component comprises a unit curtain wall upper port switch-over cross beam, an upper unit curtain wall beam, a unit curtain wall lower port switch-over cross beam and a lower unit curtain wall beam; the upper channel steel, the unit curtain wall upper port switch-over beam and the upper unit curtain wall cross are connected in sequence; the lower channel steel, the unit curtain wall lower port switch-over beam and the lower unit curtain wall beam are connected in sequence; and the unit curtain wall plate component is mounted between the upper unit curtain wall beam and the lower unit curtain wall beam. The curtain wall structure changes the construction flow of the common curtain wall, achieve first installation of the decorate panel of an eave, without isolation of the interlayer curtain wall, so that the installation of an auxiliary device for a scaffold of the eave is easily achieved; and the cross operation of operation surfaces is carried out on the construction in an all-round way, without being limited by the construction sequence, and the parallel construction can be conducted, so that the construction schedule is improved greatly.
Description
Technical field
The utility model relates to a kind of interlayer unit curtain wall construction, and particularly a kind of interlayer unit curtain wall construction that can optimize installation procedure belongs to Super High curtain wall construction technical field.
Background technology
The optimal selection of super highrise building space enclosing structure is cell curtain wall.Because cell curtain wall is from heavy and light, the resist displacement ability is strong, and the characteristics such as integral installation must cause cell curtain wall to become the unique selection of super highrise building peripheral structure.Because the requirement of architectural design, the particularity of the cornice design at floor beam position adds the setting of wiping window apparatus, need a kind of between layers become independently unit curtain wall system; In case this just means the installation of cell curtain wall between complete layer, the constructor just can't arrive outdoor operation, must carry out by the auxiliary equipment of hanging basket the facing installation of cornice, and because the particularity of cornice moulding, the scope of operation of nacelle construction and decorative cover can not one-time-reach-places, also have the outside seal of cell curtain wall to process and also brought placing restrictions on of progress and efficient to engineering construction.And if first the cornice decoration panel is installed, brought a lot of inconvenience then for the installation of interlayer cell curtain wall, the system that specifically is reflected in act cell curtain wall does not match, and is difficult to realize encapsulation process with the node of cornice decoration panel.
The utility model content
The utility model purpose is that a kind of interlayer unit curtain wall construction that can optimize installation procedure is provided in order to overcome the deficiencies in the prior art.
For achieving the above object, the technical solution adopted in the utility model is: a kind of interlayer unit curtain wall construction comprises cell curtain wall assembly, upper channel-section steel, lower channel-section steel, cell curtain wall plate assembly; Described cell curtain wall assembly comprises cell curtain wall switching crossbeam suitable for reading, cell curtain wall top rail, cell curtain wall end opening switching crossbeam, cell curtain wall lower transverse beam; Described cell curtain wall switching crossbeam suitable for reading is installed in the lower end of channel-section steel; Described cell curtain wall top rail is fastened on the bottom of cell curtain wall switching crossbeam suitable for reading; Described cell curtain wall end opening switching crossbeam is installed in the upper end of lower channel-section steel; Described cell curtain wall lower transverse beam is fastened on the top of cell curtain wall end opening switching crossbeam; Described cell curtain wall plate assembly is installed between cell curtain wall top rail and the cell curtain wall lower transverse beam, and is fixed on cell curtain wall top rail and the cell curtain wall lower transverse beam.
Preferably, be connected by corner brace between described cell curtain wall switching crossbeam suitable for reading and upper channel-section steel, cell curtain wall end opening switching crossbeam and the lower channel-section steel.
Preferably, be connected by the hook with intilted gradient between described cell curtain wall switching crossbeam suitable for reading and the cell curtain wall top rail.
Preferably, be provided with Anchor plate kit on the described cell curtain wall switching crossbeam suitable for reading; Described Anchor plate kit is installed in the groove of cell curtain wall switching crossbeam suitable for reading, and compressing unit curtain wall top rail.
Preferably, be provided with the guide-localization boss on the described cell curtain wall end opening switching crossbeam, be provided with the guide-localization groove on the cell curtain wall lower transverse beam; Described cell curtain wall end opening switching crossbeam is connected by the cooperation of guide-localization boss with the guide-localization groove with the cell curtain wall lower transverse beam.
Because the utilization of technique scheme, the utility model compared with prior art has following advantages:
A kind of interlayer unit curtain wall construction of the utility model scheme has changed the construction process of common curtain wall, realize the decoration panel of first cornice, this stage does not have the isolation of interlayer curtain wall, auxiliary equipment to the pin hand of cornice just easily realizes, can realize cross-operation to the engineering scope of operation that is in full swing, not can construct side by side by placing restrictions on of sequence of construction, greatly improved construction speed; By interlayer cell curtain wall switching crossbeam suitable for reading and cell curtain wall end opening switching crossbeam, the requirement of the function of cornice aluminium sheet skeleton has been satisfied in the complete closing in of formation that combines with cornice aluminium sheet skeleton; And changed the link code of standard element formula curtain wall by column and be delivered to architecture structure form, adopt being delivered on the switching crossbeam suitable for reading that crossbeam articulates, then be delivered in the building structure; On the switching crossbeam suitable for reading intilted hook is set, is complementary with the hook of cell curtain wall top rail, form the combination of a climbing during combination, when unit plate when being extrapolated to, plate just has the process of a lifting, reaches the hanging function of unit plate; Pin the cell curtain wall top rail by the cell curtain wall Anchor plate kit again; End opening switching crossbeam and cell curtain wall lower transverse beam are combined into a slide block slot, so that unit plate has the ability of anti-plane internal deformation, unit plate can be transferred in the broken line scope of regulation.
Description of drawings
Below in conjunction with accompanying drawing technical solutions of the utility model are described further:
Accompanying drawing 1 is a kind of interlayer unit curtain wall construction schematic diagram described in the utility model;
Accompanying drawing 2 is the structural representation of cell curtain wall described in the utility model switching crossbeam suitable for reading;
Accompanying drawing 3 is for being the structural representation of cell curtain wall top rail described in the utility model;
Accompanying drawing 4 is the structural representation for cell curtain wall end opening switching crossbeam crossbeam described in the utility model;
Accompanying drawing 5 is for being the structural representation of cell curtain wall lower transverse beam described in the utility model;
Wherein: 1, cell curtain wall switching crossbeam suitable for reading; 2, cell curtain wall top rail; 3, cell curtain wall end opening switching crossbeam; 4, cell curtain wall lower transverse beam; 5, upper channel-section steel; 6, lower channel-section steel; 7, cell curtain wall plate assembly; 8, Anchor plate kit.
The specific embodiment
The utility model is described in further detail below in conjunction with drawings and the specific embodiments.
Shown in accompanying drawing 1-5, a kind of interlayer unit curtain wall construction described in the utility model comprises cell curtain wall assembly, upper channel-section steel 5, lower channel-section steel 6, cell curtain wall plate assembly 7; Described cell curtain wall assembly comprises cell curtain wall switching crossbeam 1 suitable for reading, cell curtain wall top rail 2, cell curtain wall end opening switching crossbeam 3, cell curtain wall lower transverse beam 4; Described cell curtain wall switching crossbeam 1 suitable for reading is installed in the lower end of upper channel-section steel 5 by corner brace, on the cell curtain wall switching crossbeam 1 suitable for reading Anchor plate kit 8 is installed; Described cell curtain wall top rail 2 is connected on the bottom of cell curtain wall switching crossbeam 1 suitable for reading by the hook connecting with intilted gradient, and is compressed by Anchor plate kit 8, and hook can't be staggered; Be provided with the guide-localization boss on the described cell curtain wall end opening switching crossbeam 3, cell curtain wall end opening switching crossbeam 3 is installed in the upper end of lower channel-section steel 6 by corner brace; The bottom of described cell curtain wall lower transverse beam 4 is provided with the guide-localization groove; And be connected with cell curtain wall end opening switching crossbeam 3 by the cooperation of guide-localization boss and guide-localization groove; Described cell curtain wall plate assembly 7 is installed between cell curtain wall top rail 2 and the cell curtain wall lower transverse beam 4, and is fixed on cell curtain wall top rail 2 and the cell curtain wall lower transverse beam 4.
Because the utilization of technique scheme, the utility model compared with prior art has following advantages:
A kind of interlayer unit curtain wall construction of the utility model scheme has changed the construction process of common curtain wall, realize the decoration panel of first cornice, this stage does not have the isolation of interlayer curtain wall, auxiliary equipment to the pin hand of cornice just easily realizes, can realize cross-operation to the engineering scope of operation that is in full swing, not can construct side by side by placing restrictions on of sequence of construction, greatly improved construction speed; By interlayer cell curtain wall switching crossbeam suitable for reading and cell curtain wall end opening switching crossbeam, the requirement of the function of cornice aluminium sheet skeleton has been satisfied in the complete closing in of formation that combines with cornice aluminium sheet skeleton; And changed the link code of standard element formula curtain wall by column and be delivered to architecture structure form, adopt being delivered on the switching crossbeam suitable for reading that crossbeam articulates, then be delivered in the building structure; On the switching crossbeam suitable for reading intilted hook is set, is complementary with the hook of cell curtain wall top rail, form the combination of a climbing during combination, when unit plate when being extrapolated to, plate just has the process of a lifting, reaches the hanging function of unit plate; Pin the cell curtain wall top rail by the cell curtain wall Anchor plate kit again; End opening switching crossbeam and cell curtain wall lower transverse beam are combined into a slide block slot, so that unit plate has the ability of anti-plane internal deformation, unit plate can be transferred in the broken line scope of regulation.
Below only be concrete exemplary applications of the present utility model, protection domain of the present utility model is not constituted any limitation.All employing equivalents or equivalence are replaced and the technical scheme of formation, all drop within the utility model rights protection scope.
Claims (5)
1. interlayer unit curtain wall construction, comprise cell curtain wall assembly, upper channel-section steel (5), lower channel-section steel (6), cell curtain wall plate assembly (7), it is characterized in that: described cell curtain wall assembly comprises cell curtain wall switching crossbeam suitable for reading (1), cell curtain wall top rail (2), cell curtain wall end opening switching crossbeam (3), cell curtain wall lower transverse beam (4); Described cell curtain wall switching crossbeam suitable for reading (1) is installed in the lower end of channel-section steel (5); Described cell curtain wall top rail (2) is fastened on the bottom of cell curtain wall switching crossbeam suitable for reading (1); Described cell curtain wall end opening switching crossbeam (3) is installed in the upper end of lower channel-section steel (6); Described cell curtain wall lower transverse beam (4) is fastened on the top of cell curtain wall end opening switching crossbeam (3); Described cell curtain wall plate assembly (7) is installed between cell curtain wall top rail (2) and the cell curtain wall lower transverse beam (4), and is fixed on cell curtain wall top rail (2) and the cell curtain wall lower transverse beam (4).
2. a kind of interlayer unit curtain wall construction according to claim 1 is characterized in that: be connected by corner brace between described cell curtain wall switching crossbeam suitable for reading (1) and upper channel-section steel (5), cell curtain wall end opening switching crossbeam (3) and the lower channel-section steel (6).
3. a kind of interlayer unit curtain wall construction according to claim 1 is characterized in that: be connected by the hook with intilted gradient between described cell curtain wall switching crossbeam suitable for reading (1) and the cell curtain wall top rail (2).
4. it is characterized in that: be provided with Anchor plate kit (8) on the described cell curtain wall switching crossbeam suitable for reading (1) according to claim 1 or 3 described a kind of interlayer unit curtain wall constructions; Described Anchor plate kit (8) is installed in the groove of cell curtain wall switching crossbeam suitable for reading (1), and compressing unit curtain wall top rail (2).
5. a kind of interlayer unit curtain wall construction according to claim 1 is characterized in that: be provided with the guide-localization boss on the described cell curtain wall end opening switching crossbeam (3), the cell curtain wall lower transverse beam is provided with the guide-localization groove on (4); Described cell curtain wall end opening switching crossbeam (3) is connected by the cooperation of guide-localization boss with the guide-localization groove with cell curtain wall lower transverse beam (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012202626622U CN202767298U (en) | 2012-06-06 | 2012-06-06 | Curtain wall structure of interlayer unit |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012202626622U CN202767298U (en) | 2012-06-06 | 2012-06-06 | Curtain wall structure of interlayer unit |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202767298U true CN202767298U (en) | 2013-03-06 |
Family
ID=47773881
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012202626622U Expired - Fee Related CN202767298U (en) | 2012-06-06 | 2012-06-06 | Curtain wall structure of interlayer unit |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202767298U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102733516A (en) * | 2012-06-06 | 2012-10-17 | 苏州金螳螂幕墙有限公司 | Inter-floor unit curtain wall structure |
-
2012
- 2012-06-06 CN CN2012202626622U patent/CN202767298U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102733516A (en) * | 2012-06-06 | 2012-10-17 | 苏州金螳螂幕墙有限公司 | Inter-floor unit curtain wall structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201543150U (en) | High-rise industrial building fire-fighting water supply system configuration structure | |
CN202767298U (en) | Curtain wall structure of interlayer unit | |
CN206607736U (en) | A kind of house construction engineering construction ceiling structure | |
CN104005496A (en) | Fabricated environment-friendly external wall | |
CN203867001U (en) | Assemblable and environment-friendly outer wall | |
CN102733516A (en) | Inter-floor unit curtain wall structure | |
CN102733518B (en) | A kind of cell curtain wall top rail | |
CN203961142U (en) | A kind of prepared roofing | |
CN202809906U (en) | Cornice switching cross beam for unitized curtain wall | |
CN202767297U (en) | Lower cross beam of unit curtain wall | |
CN204163441U (en) | A kind of transformer substation power distribution unit room based on unit wall quickly dismantled technology | |
CN204264658U (en) | A kind of prefabricated panel transport storage rack | |
CN202767296U (en) | Transferring cross beam of lower openings of unit curtain walls | |
CN201972291U (en) | Downhill clerestory | |
CN202767295U (en) | Upper cross beam of unit curtain wall | |
CN102733519B (en) | Backcut changeover cross beam of unitized curtain wall | |
CN102733517B (en) | A kind of cell curtain wall lower transverse beam | |
CN202595973U (en) | Installing structure for ceramic-plate combined curtain walls | |
CN207878720U (en) | Permanent aluminium section bar track glass replaces device | |
CN206815908U (en) | A kind of assembly type, energy-saving, multi-functional, removable construction shed | |
CN202108138U (en) | Building curtain wall base plate | |
CN205276893U (en) | Building body outer wall hoists built -in fitting of trying to stop people from fighting each other | |
CN209482759U (en) | A kind of steel structural plant roof building renovation component | |
CN102733514B (en) | A kind of cell curtain wall end opening switching crossbeam | |
CN215563899U (en) | Anti-seepage steel framework light panel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130306 Termination date: 20150606 |
|
EXPY | Termination of patent right or utility model |