CN202767087U - Top ring beam sharing device for sequential excavation of adjacent foundation pits - Google Patents
Top ring beam sharing device for sequential excavation of adjacent foundation pits Download PDFInfo
- Publication number
- CN202767087U CN202767087U CN 201220293595 CN201220293595U CN202767087U CN 202767087 U CN202767087 U CN 202767087U CN 201220293595 CN201220293595 CN 201220293595 CN 201220293595 U CN201220293595 U CN 201220293595U CN 202767087 U CN202767087 U CN 202767087U
- Authority
- CN
- China
- Prior art keywords
- top beam
- connector
- top ring
- ring beam
- excavation pit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Images
Landscapes
- Road Paving Structures (AREA)
Abstract
A top ring beam sharing device for sequential excavation of adjacent foundation pits is arranged between an earlier excavation pit first support and a later excavation pit first support. The top ring beam sharing device is provided with a top ring beam, wherein the top ring beam further comprises horizontally arranged top ring beam steel bars and a straight thread steel bar connector arranged inside the top ring beam; one end of the connector is anchored in the top ring beam through steel bars; and the head at the other end of the connector is sealed through a sealing cover, and the connector is connected with second steel bars during the construction of the later excavation pit first support. According to the utility model, when the first concrete top ring beam is constructed at the earlier excavation pit first support, the connector for the second steel bars of the later excavation pit first support is pre-buried, and the second steel bars are connected with the connector during the construction of the later excavation pit first support, so that the repeated dismantlement of the top ring beam of a midboard is avoided.
Description
Technical field
The utility model relates to construction engineering technical field, relates in particular to a kind of Adjacent Pit and successively excavates the top beam composite device.
Background technology
At present, the development that divides the hole construction along with modern deep big foundation pit according to surrounding enviroment and construction period, the engineering that Adjacent Pit successively excavates according to operating mode in foundation pit construction gets more and more, the common wall top beam of Adjacent Pit need to be finished the top beam secondary construction of carrying out Adjacent Pit after cutting at a foundation pit construction in the engineering in the past, cause common wall top beam to repeat construction, increase construction cost and construction period.
Therefore for the problem that prior art exists, this case designer relies on the industry experience for many years of being engaged in, the active research improvement is so there has been the utility model Adjacent Pit successively to excavate top beam composite device and job practices and job practices.
The utility model content
The utility model is in the prior art, the common wall top beam of traditional Adjacent Pit need to be finished the top beam secondary construction of carrying out Adjacent Pit after cutting at a foundation pit construction, cause common wall top beam to repeat construction, increasing the defectives such as construction cost and construction period provides a kind of Adjacent Pit successively to excavate the top beam composite device.
In order to address the above problem, the utility model provides a kind of Adjacent Pit successively to excavate the top beam composite device, and described top beam composite device is arranged between the first road support of described first excavation pit and the first road support of described rear excavation pit; Described top beam composite device has top beam, and described top beam further comprises the top beam reinforcing bar of horizontally set, and is arranged on the straight thread reinforced bar connector in the described top beam; The first road of described first excavation pit supports and comprises the first reinforcing bar, and described the first reinforcing bar one end requires to be arranged in the described top beam according to grappling; The first road of described rear excavation pit supports and comprises the second reinforcing bar, and described the second reinforcing bar one end is connected with described connector; In described top beam, the described connector other end adopts the seal cover end socket to described connector one end by Bar Anchorage, and is connected with described the second reinforcing bar when the first road of described rear excavation pit Construction of Supporting.
Optionally, the position of described connector arranges according to the position of the second reinforcing bar of rear excavation pit first road support.
In sum, the utility model is during by the first road of Construction of Supporting, the first road of excavation pit formerly concrete top beam, the connector of the second reinforcing bar that the first road of pre-buried rear excavation pit supports, described the second reinforcing bar connects by connector when the first road of rear excavation pit Construction of Supporting, and then has avoided the repetition Demolition Construction of mid-board top beam.
Description of drawings
Figure 1 shows that the utility model Adjacent Pit successively excavates the sectional structure schematic diagram of top beam composite device;
Figure 2 shows that the job practices flow chart that the utility model Adjacent Pit successively excavates.
The specific embodiment
By describing technology contents, structural feature that the utility model creates in detail, being reached purpose and effect, below in conjunction with embodiment and cooperate accompanying drawing to be described in detail.
See also Fig. 1, Figure 1 shows that the utility model Adjacent Pit successively excavates the structural representation of top beam composite device.Described top beam composite device 1 is arranged on the first road support 2 of described first excavation pit and the first road of described rear excavation pit supports between 3.Particularly, described top beam composite device 1 has top beam 10, and described top beam 10 further comprises the top beam reinforcing bar 11 of horizontally set, and is arranged on the straight thread reinforced bar connector 12 in the described top beam 10.The first road of described first excavation pit supports 2 and comprises the first reinforcing bar 20.Described the first reinforcing bar 20 1 ends require to be arranged in the described top beam 10 according to grappling.The first road of described rear excavation pit supports 3 and comprises the second reinforcing bar (not shown).Described the second reinforcing bar one end is connected with described connector 12.Described connector 12 1 ends are anchored in the described top beam 10 by reinforcing bar 121, and described connector 12 other ends adopt seal cover 122 end sockets, and are connected with described the second reinforcing bar when support 3 construction of the first road of described rear excavation pit.
Please continue to consult Fig. 2, and in conjunction with consulting Fig. 1, Figure 2 shows that the job practices flow chart that Adjacent Pit successively excavates.The job practices that described Adjacent Pit successively excavates may further comprise the steps:
Execution in step S1: when formerly the first road of excavation pit supports 2 construction with mid-board ground wall bleeding part concrete chisel removal;
Execution in step S2: place the top beam reinforcing bar 11 of described top beam 10, the first road of first excavation pit is supported the first reinforcing bar 20 of 2 and require to be arranged in the described top beam 10 according to anchoring.
Execution in step S3: the position of supporting the second reinforcing bar of 3 according to the first road of rear excavation pit arranges, at the described top beam 10 interior straight thread reinforced bar connectors 12 that arrange.Wherein, an end connecting reinforcement 121 anchorings of described connector 12 enter in the described top beam 10; The other end of described connector 12 seal cover 122 end sockets.Described connector 12 is embedded in the described top beam 10 when building.
Execution in step S4: when the first road of rear excavation pit supports 3 construction, described connector 12 position toppings are chiseled, taken off seal cover 122 end sockets, the first road of described rear excavation pit is supported the second reinforcing bar of 3 and be connected with described connector 12.
When the utility model is constructed first road concrete top beam by formerly excavation pit first road support 2, the connector 12 of the second reinforcing bar of pre-buried rear excavation pit first road support 3, described the second reinforcing bar connects by connector 12 when the first road of rear excavation pit supports 3 construction, and then has avoided the repetition Demolition Construction of mid-board top beam.
In sum, the utility model is during by the first road of Construction of Supporting, the first road of excavation pit formerly concrete top beam, the connector of the second reinforcing bar that the first road of pre-buried rear excavation pit supports, described the second reinforcing bar connects by connector when the first road of rear excavation pit Construction of Supporting, and then has avoided the repetition Demolition Construction of mid-board top beam.
Those skilled in the art all should be appreciated that, in the situation that do not break away from spirit or scope of the present utility model, can carry out various modifications and variations to the utility model.Thereby, if when any modification or modification fall in the protection domain of appended claims and equivalent, think that the utility model contains these modifications and modification.
Claims (1)
1. an Adjacent Pit successively excavates the top beam composite device, it is characterized in that, described top beam composite device is arranged between the first road support of described first excavation pit and the first road support of described rear excavation pit; Described top beam composite device has top beam, and described top beam further comprises the top beam reinforcing bar of horizontally set, and is arranged on the straight thread reinforced bar connector in the described top beam; The first road of described first excavation pit supports and comprises the first reinforcing bar, and described the first reinforcing bar one end is arranged in the described top beam; The first road of described rear excavation pit supports and comprises the second reinforcing bar, and described the second reinforcing bar one end is connected with described connector; In described top beam, the described connector other end adopts the seal cover end socket to described connector one end by Bar Anchorage, and is connected with described the second reinforcing bar when the first road of described rear excavation pit Construction of Supporting.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220293595 CN202767087U (en) | 2012-06-20 | 2012-06-20 | Top ring beam sharing device for sequential excavation of adjacent foundation pits |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220293595 CN202767087U (en) | 2012-06-20 | 2012-06-20 | Top ring beam sharing device for sequential excavation of adjacent foundation pits |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202767087U true CN202767087U (en) | 2013-03-06 |
Family
ID=47773670
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220293595 Withdrawn - After Issue CN202767087U (en) | 2012-06-20 | 2012-06-20 | Top ring beam sharing device for sequential excavation of adjacent foundation pits |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202767087U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102704494A (en) * | 2012-06-20 | 2012-10-03 | 上海建工二建集团有限公司 | Sequence excavation top ring beam sharing device of adjacent foundation pits |
CN105804084A (en) * | 2016-03-25 | 2016-07-27 | 中铁三局集团广东建设工程有限公司 | Excavation construction method of small foundation pit near excavated deep foundation pit |
-
2012
- 2012-06-20 CN CN 201220293595 patent/CN202767087U/en not_active Withdrawn - After Issue
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102704494A (en) * | 2012-06-20 | 2012-10-03 | 上海建工二建集团有限公司 | Sequence excavation top ring beam sharing device of adjacent foundation pits |
CN102704494B (en) * | 2012-06-20 | 2014-08-27 | 上海建工二建集团有限公司 | Sequence excavation top ring beam sharing device of adjacent foundation pits and its constructing method |
CN105804084A (en) * | 2016-03-25 | 2016-07-27 | 中铁三局集团广东建设工程有限公司 | Excavation construction method of small foundation pit near excavated deep foundation pit |
CN105804084B (en) * | 2016-03-25 | 2017-08-29 | 中铁三局集团广东建设工程有限公司 | A kind of small excavation method for closing on deep pit excavation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201679147U (en) | Underpinning structure for superstructure shear wall during underground top-down construction of high-rise building | |
CN103266896B (en) | Construction method for shield tunneling machine retaining structure taking position firstly and being constructed secondly and for shield shaft excavation | |
CN203559904U (en) | Reinforced supporting structure for creating horsehead on reversal borehole wall shaft well side wall | |
CN103628884A (en) | Neighborhood tunnel middle clamping rock strengthening method | |
CN104652418A (en) | Continuous wall underground pipeline position construction method | |
CN103669369A (en) | Supporting structure and supporting method for foundation pit | |
CN203891087U (en) | Gravity-type retaining wall reinforcement structure | |
CN102704494B (en) | Sequence excavation top ring beam sharing device of adjacent foundation pits and its constructing method | |
CN202767087U (en) | Top ring beam sharing device for sequential excavation of adjacent foundation pits | |
CN202577313U (en) | Supporting combined system for deep foundation pit | |
CN203130086U (en) | Excavating structure without pilot tunnel of double-linked-arch tunnel | |
CN104265301A (en) | Rectangular pipe jacking large-angle obliquely crossing in-tunnel construction method | |
CN102865083A (en) | Working well free shield arrival engineering method and structure of existing basement structure | |
CN104895221B (en) | Assembled shaped steel confined concrete shear wall structure | |
CN104047607A (en) | Construction method for lifting out shield tunneling machine under condition of envelop enclosure | |
KR101310677B1 (en) | Top down method using precast composite retaining wall and raker in slope | |
CN105178451A (en) | Corrosion-resistant structure of assembled building exterior wall dry hanging node and construction method of corrosion-resistant structure | |
CN210201445U (en) | Underground pipeline group combination tool type supporting protection system | |
CN108612129A (en) | Based on the top-down construction method that can have enough to meet the need steel platform | |
KR100941437B1 (en) | 2 arch tunnel construction method for upper girder void proofing and efficient construction | |
CN204676569U (en) | The Anchor Care of the larger Dangerous Rock Body of a kind of rock side slope combines process structure | |
CN104234058A (en) | Diagonal bracing support structure for large foundation pit | |
CN203188220U (en) | Deep foundation pit supporting structure | |
CN103898880B (en) | The method of reservoir Diversion Tunnel backfill reconstruction flood discharging tunnel | |
CN209619757U (en) | The support system of across Coal Transportation tunnel crossover node on tunnel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20130306 Effective date of abandoning: 20140827 |
|
RGAV | Abandon patent right to avoid regrant |