CN202758234U - An automated monitoring and early warning system of industrial and civil engineering infrastructure and a subway tunnel - Google Patents

An automated monitoring and early warning system of industrial and civil engineering infrastructure and a subway tunnel Download PDF

Info

Publication number
CN202758234U
CN202758234U CN2012204658045U CN201220465804U CN202758234U CN 202758234 U CN202758234 U CN 202758234U CN 2012204658045 U CN2012204658045 U CN 2012204658045U CN 201220465804 U CN201220465804 U CN 201220465804U CN 202758234 U CN202758234 U CN 202758234U
Authority
CN
China
Prior art keywords
early warning
subway tunnel
warning system
worker
infrastructure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2012204658045U
Other languages
Chinese (zh)
Inventor
吴俨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUXI WUSHEN TECHNOLOGY Co Ltd
Original Assignee
WUXI WUSHEN TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUXI WUSHEN TECHNOLOGY Co Ltd filed Critical WUXI WUSHEN TECHNOLOGY Co Ltd
Priority to CN2012204658045U priority Critical patent/CN202758234U/en
Application granted granted Critical
Publication of CN202758234U publication Critical patent/CN202758234U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Abstract

The utility model discloses an automated monitoring and early warning system of industrial and civil engineering infrastructure and a subway tunnel. The automated monitoring and early warning system comprises multiple wireless sensing points at the detected industrial and civil engineering infrastructure and the detected subway tunnel, a wireless sensing network module which is connected with the multiple wireless sensing points and which is used for being connected with internet, a remote control platform which is connected with the wireless sensing network module through the internet and which is used for performing unified monitoring and processing based on information acquired by the multiple wireless sensing points, and a remote server which is connected with the remote control platform and which is used for storing corresponding acquired information and processed results. The automated monitoring and early warning system of industrial and civil engineering infrastructure and a subway tunnel overcomes defects of large labor work, omplex operational process, high cost, and bad practical applicability of a product in the prior art so as to achieve advantages of little labor work, easy operational process, low cost, strong practical applicability, and high automated degree.

Description

The automatic monitoring in worker China Democratic National Construction Association infrastructure and subway tunnel and early warning system
Technical field
The utility model relates to worker China Democratic National Construction Association infrastructure and subway tunnel construction technical field, particularly, relates to automatic monitoring and the early warning system in worker China Democratic National Construction Association infrastructure and subway tunnel.
Background technology
At present, in worker China Democratic National Construction Association infrastructure and the subway tunnel construction, mainly there are following problem and challenge:
⑴ take as the leading factor with the hand-held reading device, reserve port by the sensor of burying underground for permanent (or semipermanent), on-the-spot being connected handheld device and port, then artificial or automanual data recording, again with the mode of data manual entry or semi-automatic importing, with the further computing of data, extraction, analysis, this flow process manpower consumption is large, and operation is loaded down with trivial details, cost is higher;
⑵ owner in construction quality safety particularly for first stage of construction and operation initial stage, not only on the quantity of monitoring point or the frequent degree of sensor collection requires to improve constantly;
⑶ international aspect enters the high demand experimental phase for round-the-clock unattended monitoring.
In realizing process of the present utility model, the inventor finds to exist at least in the prior art that the hand labor amount is large, operating process is loaded down with trivial details, cost is high and the defective such as poor practicability.
Summary of the invention
The purpose of this utility model is, for the problems referred to above, automatic monitoring and the early warning system in worker's China Democratic National Construction Association's infrastructure and subway tunnel are proposed, with the advantage that realizes that the hand labor amount is little, operating process is easy, cost is low, practical and automaticity is high.
For achieving the above object, the technical solution adopted in the utility model is: automatic monitoring and the early warning system in worker China Democratic National Construction Association infrastructure and subway tunnel, comprise respectively and be positioned at the worker China Democratic National Construction Association infrastructure that is detected and a plurality of wireless sensing fulcrums at place, subway tunnel, be connected with described a plurality of wireless sensing fulcrums, and for the radio sensing network module that is connected with the internet, be connected with described radio sensing network module by the internet, and be used for the remote control table of carrying out unified monitoring and processing based on the Information Monitoring of a plurality of wireless sensing fulcrums, and be connected with described remote control table, be used for storing the remote server of corresponding Information Monitoring and result.
Further, automatic monitoring and the early warning system in above-described worker's China Democratic National Construction Association's infrastructure and subway tunnel also comprise being connected with described remote control table and being used for corresponding dangerous situation is carried out the distant early warning module of early warning to remind the staff in time to take measures.
Further, each wireless sensing node comprises the sensor probe, A/D modular converter and the radio receiving transmitting module that are connected to successively described radio sensing network module; Described sensor probe is positioned on the sensing point at the worker China Democratic National Construction Association infrastructure that is detected and place, subway tunnel.
Further, described radio receiving transmitting module comprises microprocessor, and the transmitting-receiving interface, memory module and the package module that are connected with described microprocessor respectively; Described transmitting-receiving interface is connected with the radio sensing network module with the A/D modular converter respectively.
Further, described transmitting-receiving interface comprises serial communication interface.
Further, described remote control table comprises PC, industrial computer and handheld terminal with telecommunications functions.
Further, described radio sensing network module comprises and realizes shen radio sensing network module.
Further, described distant early warning module comprises voice module and hummer with telecommunications functions.
The worker China Democratic National Construction Association infrastructure of each embodiment of the utility model and automatic monitoring and the early warning system in subway tunnel, owing to comprising respectively and be positioned at the worker China Democratic National Construction Association infrastructure that is detected and a plurality of wireless sensing fulcrums at place, subway tunnel, be connected with a plurality of wireless sensing fulcrums, and for the radio sensing network module that is connected with the internet, be connected with the radio sensing network module by the internet, and be used for the remote control table of carrying out unified monitoring and processing based on the Information Monitoring of a plurality of wireless sensing fulcrums, and be connected with remote control table, be used for storing the remote server of corresponding Information Monitoring and result; Can utilize and realize the shen radio sensing network, with the monitoring facilities in existing worker China Democratic National Construction Association and subway tunnel, comprehensive real-time unattended automated system; The hand labor amount is large in the prior art, operating process is loaded down with trivial details, cost is high and the defective of poor practicability thereby can overcome, with the advantage that realizes that the hand labor amount is little, operating process is easy, cost is low, practical and automaticity is high.
Other features and advantages of the utility model will be set forth in the following description, and, partly from instructions, become apparent, perhaps understand by implementing the utility model.
Below by drawings and Examples, the technical solution of the utility model is described in further detail.
Description of drawings
Accompanying drawing is used to provide further understanding of the present utility model, and consists of the part of instructions, is used from explanation the utility model with embodiment one of the present utility model, does not consist of restriction of the present utility model.In the accompanying drawings:
Fig. 1 is the automatic monitoring in the utility model worker China Democratic National Construction Association's infrastructure and subway tunnel and the principle of work schematic diagram of early warning system;
Fig. 2 is the principle of work schematic diagram of a radio receiving transmitting module among Fig. 1.
Embodiment
Below in conjunction with accompanying drawing preferred embodiment of the present utility model is described, should be appreciated that preferred embodiment described herein only is used for description and interpretation the utility model, and be not used in restriction the utility model.
According to the utility model embodiment, provide automatic monitoring and the early warning system in worker China Democratic National Construction Association infrastructure and subway tunnel.As depicted in figs. 1 and 2, the present embodiment comprises respectively and is positioned at the worker China Democratic National Construction Association infrastructure that is detected and a plurality of wireless sensing fulcrums at place, subway tunnel, the radio sensing network module that is connected and is used for being connected with the internet with a plurality of wireless sensing fulcrums, be connected and be used for the remote control table of carrying out unified monitoring and processing based on the Information Monitoring of a plurality of wireless sensing fulcrums with the radio sensing network module by the internet, and is connected with remote control table, for storing the remote server of corresponding Information Monitoring and result; Also comprise and be connected with remote control table and be used for corresponding dangerous situation is carried out the distant early warning module of early warning to remind the staff in time to take measures.
Here, this remote control table comprises PC, industrial computer and handheld terminal with telecommunications functions.The radio sensing network module comprises and realizes shen radio sensing network module.The distant early warning module comprises voice module and hummer with telecommunications functions.
Wherein, above-mentioned each wireless sensing node comprises the sensor probe, A/D modular converter and the radio receiving transmitting module that are connected to successively the radio sensing network module; Sensor probe is positioned on the sensing point at the worker China Democratic National Construction Association infrastructure that is detected and place, subway tunnel.This radio receiving transmitting module comprises microprocessor, and the transmitting-receiving interface, memory module and the package module that are connected with microprocessor respectively; The transmitting-receiving interface is connected with the radio sensing network module with the A/D modular converter respectively.This receives and dispatches interface, comprises serial communication interface, such as RS232 communication interface and RS485 communication interface.
In the automatic monitoring and early warning system in the worker China Democratic National Construction Association infrastructure of above-described embodiment and subway tunnel, can utilize and realize shen radio sensing network module (namely realizing shen intelligent wireless mesh network system), shen intelligent wireless mesh network system is realized in utilization, need not wiring, after installing, adopt voluntarily at all fulcrums the optimal network networking, utilize the automatic energy balancing technique, so that energy consumption drops to is minimum, the wireless frequency modulation technology is so that native system can be avoided the frequency range of conflicting automatically; Thereby the monitoring facilities with existing worker China Democratic National Construction Association and subway tunnel, comprehensive real-time unattended automated system, for example, can will realize the associating of the sensing element of the radio sensing network module of shen and national correlation engineering standard, with data with second the level frequency be achieved by following flow process: 1. voltage drive; 2. signal resonance; 3. data acquisition; 4. sunykatuib analysis; 5. information group bag; 6. voluntarily networking of system; 7. relay is back to intelligent terminal; 8. Database; 9. information analysis and diagnosis; 10. information issue early warning.
The worker China Democratic National Construction Association infrastructure of above-described embodiment and automatic monitoring and the early warning system in subway tunnel, it is convenient to install, wireless and passive, cost is low, the highest data acquisition passback that can reach second level, high precision detects.
It should be noted that at last: above only is preferred embodiment of the present utility model, be not limited to the utility model, although with reference to previous embodiment the utility model is had been described in detail, for a person skilled in the art, it still can be made amendment to the technical scheme that aforementioned each embodiment puts down in writing, and perhaps part technical characterictic wherein is equal to replacement.All within spirit of the present utility model and principle, any modification of doing, be equal to replacement, improvement etc., all should be included within the protection domain of the present utility model.

Claims (8)

1. automatic monitoring and the early warning system in worker China Democratic National Construction Association infrastructure and subway tunnel, it is characterized in that, comprise respectively and be positioned at the worker China Democratic National Construction Association infrastructure that is detected and a plurality of wireless sensing fulcrums at place, subway tunnel, be connected with described a plurality of wireless sensing fulcrums, and for the radio sensing network module that is connected with the internet, be connected with described radio sensing network module by the internet, and be used for the remote control table of carrying out unified monitoring and processing based on the Information Monitoring of a plurality of wireless sensing fulcrums, and be connected with described remote control table, be used for storing the remote server of corresponding Information Monitoring and result.
2. automatic monitoring and the early warning system in worker's China Democratic National Construction Association's infrastructure according to claim 1 and subway tunnel, it is characterized in that, also comprise being connected with described remote control table and being used for corresponding dangerous situation is carried out the distant early warning module of early warning to remind the staff in time to take measures.
3. automatic monitoring and the early warning system in worker's China Democratic National Construction Association's infrastructure according to claim 1 and 2 and subway tunnel, it is characterized in that, each wireless sensing node comprises the sensor probe, A/D modular converter and the radio receiving transmitting module that are connected to successively described radio sensing network module; Described sensor probe is positioned on the sensing point at the worker China Democratic National Construction Association infrastructure that is detected and place, subway tunnel.
4. automatic monitoring and the early warning system in worker's China Democratic National Construction Association's infrastructure according to claim 3 and subway tunnel, it is characterized in that, described radio receiving transmitting module comprises microprocessor, and the transmitting-receiving interface, memory module and the package module that are connected with described microprocessor respectively; Described transmitting-receiving interface is connected with the radio sensing network module with the A/D modular converter respectively.
5. automatic monitoring and the early warning system in worker's China Democratic National Construction Association's infrastructure according to claim 4 and subway tunnel is characterized in that, described transmitting-receiving interface comprises serial communication interface.
6. automatic monitoring and the early warning system in worker's China Democratic National Construction Association's infrastructure according to claim 1 and 2 and subway tunnel is characterized in that, described remote control table comprises PC, industrial computer and handheld terminal with telecommunications functions.
7. automatic monitoring and the early warning system in worker's China Democratic National Construction Association's infrastructure according to claim 1 and 2 and subway tunnel is characterized in that, described radio sensing network module comprises and realizes shen radio sensing network module.
8. automatic monitoring and the early warning system in worker's China Democratic National Construction Association's infrastructure according to claim 2 and subway tunnel is characterized in that, described distant early warning module comprises voice module and hummer with telecommunications functions.
CN2012204658045U 2012-09-13 2012-09-13 An automated monitoring and early warning system of industrial and civil engineering infrastructure and a subway tunnel Expired - Lifetime CN202758234U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012204658045U CN202758234U (en) 2012-09-13 2012-09-13 An automated monitoring and early warning system of industrial and civil engineering infrastructure and a subway tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012204658045U CN202758234U (en) 2012-09-13 2012-09-13 An automated monitoring and early warning system of industrial and civil engineering infrastructure and a subway tunnel

Publications (1)

Publication Number Publication Date
CN202758234U true CN202758234U (en) 2013-02-27

Family

ID=47737403

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012204658045U Expired - Lifetime CN202758234U (en) 2012-09-13 2012-09-13 An automated monitoring and early warning system of industrial and civil engineering infrastructure and a subway tunnel

Country Status (1)

Country Link
CN (1) CN202758234U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104216293B (en) * 2014-09-05 2017-05-03 中铁西南科学研究院有限公司 B/S and C/S architectural pattern based information monitoring and measuring method for tunnels and underground constructions
CN109151055A (en) * 2018-09-25 2019-01-04 中铁十二局集团有限公司 The real-time monitoring system and method for real-time monitoring of constructing tunnel

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104216293B (en) * 2014-09-05 2017-05-03 中铁西南科学研究院有限公司 B/S and C/S architectural pattern based information monitoring and measuring method for tunnels and underground constructions
CN109151055A (en) * 2018-09-25 2019-01-04 中铁十二局集团有限公司 The real-time monitoring system and method for real-time monitoring of constructing tunnel

Similar Documents

Publication Publication Date Title
CN203535436U (en) Intelligent environmental monitoring system for pollution source
CN204474223U (en) A kind of winch control system based on wireless technology
CN203100795U (en) Portable power oil consumption tester
CN204480344U (en) A kind of coal preparation plant portable wireless logging
CN102174807A (en) Ropeless static penetrometer and method for acquiring and processing data
CN202758234U (en) An automated monitoring and early warning system of industrial and civil engineering infrastructure and a subway tunnel
CN203217749U (en) Barkhausen nondestructive detection system adopting wireless fidelity (WiFi)
CN203490780U (en) An intelligent sanitation Beidou outworker attendance supervisory system
CN203069733U (en) A vibration-detection-based partial discharging point positioning device used for GIS tests
CN202434041U (en) Large-caliber water meter wireless control system
CN201508207U (en) Data acquisition terminal for thermal power plant energy-conserving scheduling system
CN204155436U (en) A kind of wireless sensing node for civil structure health monitoring
CN205187006U (en) Automatic metering device that detects of high accuracy multichannel tank wagon liquid level
CN203224899U (en) Intelligent equipment management mobile terminal aiming at port industry equipment
CN206695845U (en) Based on wireless serial, the Big Dipper, bluetooth, GSM environmental monitoring system
CN102568186A (en) Parameter configuration and system updating device of non-contact data acquisition instrument
CN204536838U (en) The remote failure supervisory system of fire engine water-pump
CN204788596U (en) Intelligent device of monitoring steel bottle inflating surplus
CN204008835U (en) A kind of current sensing means based on wireless singlechip
CN105203151B (en) A kind of industrial Internet of Things comprehensive tester
CN203964953U (en) A kind of industrial Internet of Things comprehensive tester
CN205896702U (en) Long -range pipeline pressure monitoring devices
CN205068091U (en) Residence community water supply energy -saving monitoring system
CN204269417U (en) A kind of Portable water sample acquisition monitoring platform
CN204926470U (en) Maintenance operation data acquisition device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: An automated monitoring and early warning system of industrial and civil engineering infrastructure and a subway tunnel

Effective date of registration: 20140806

Granted publication date: 20130227

Pledgee: Agricultural Bank of China Limited by Share Ltd. Wuxi science and Technology Branch

Pledgor: WUXI WISEN INNOVATION Co.,Ltd.

Registration number: 2014990000638

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
CX01 Expiry of patent term

Granted publication date: 20130227

CX01 Expiry of patent term