CN202758025U - Testing arrangement for train charger - Google Patents
Testing arrangement for train charger Download PDFInfo
- Publication number
- CN202758025U CN202758025U CN 201220432778 CN201220432778U CN202758025U CN 202758025 U CN202758025 U CN 202758025U CN 201220432778 CN201220432778 CN 201220432778 CN 201220432778 U CN201220432778 U CN 201220432778U CN 202758025 U CN202758025 U CN 202758025U
- Authority
- CN
- China
- Prior art keywords
- tester
- detection terminal
- charging set
- over
- proving installation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Secondary Cells (AREA)
Abstract
Provided is a testing arrangement for a train charger, comprising a detection terminal, a changeover switch, a current limiting tester, an over-charge tester, and an over-discharge tester, wherein the current limiting tester, the over-charge tester, and the over-discharge tester are respectively connected with the detection terminal via the changeover switch; an ammeter is serially connected between the detection terminal and the changeover switch; and a voltmeter is parallelly connected between the detection terminal and the changeover switch. The changeover switch controls the current limiting tester, the over-charge tester, and the over-discharge tester to correspondingly connect with the detection terminal for the detection of different projects by connecting the detection terminal to the charger, thereby allowing users to obtain the parameters of the charger under different detection projects via the ammeter and the voltmeter and accordingly determining whether the charger reaches the requirements or not. The testing arrangement simplifies the detection process of a charger and reduces the labor intensity for the operators.
Description
Technical field
The utility model relates to testing apparatus, relates in particular to a kind of train charging set proving installation.
Background technology
At present, track train is the vehicles commonly used in people's daily life, usually is equipped with charging set on the train, and charging set mainly is responsible for charging the battery and is provided power supply for 48V electrical appliance on the car.Charging set is provided with accumulator, rectifier and control system usually, and when Alternating Current Power Supply was normal, accumulator charged, and rectifier is to emergent and general DC load power supply; After Alternating Current Power Supply broke down, accumulator provided electric power for emergency load automatically under the control of control system.Because train is before dispatching from the factory, need to carry out current limliting, overcharge and cross the project such as put to charging set and detect, so need frequent to use corresponding instrument and equipment to detect, cause the testing process of charging set loaded down with trivial details, operating personnel's labour intensity is large.
Summary of the invention
Technical problem to be solved in the utility model is: a kind of train charging set proving installation is provided, the testing process that solves charging set in the prior art is loaded down with trivial details, the defective that operating personnel's labour intensity is large, the testing process of charging set is simplified in realization, reduces operating personnel's labour intensity.
The technical scheme that the utility model provides is, a kind of train charging set proving installation, comprise: detection terminal, switch, current limliting tester, overcharge tester and cross and put tester, described current limliting tester, the described tester that overcharges were put tester and were connected with described detection terminal by described switch respectively with being connected; Be in series with reometer between described detection terminal and the described switch, be parallel with voltage table between described detection terminal and the described switch.
The train charging set proving installation that the utility model provides, by detection terminal is connected on the charging set, for detecting different projects, switch control current limliting tester, overcharge tester and put tester connection corresponding to detection terminal with being connected, just can know the parameter of charging set under different test items by reometer with voltage table, thereby judge whether charging set reaches requirement, realize having simplified the testing process of charging set, reduced operating personnel's labour intensity.
Aforesaid train charging set proving installation, described current limliting tester comprise the first battery, the first swept resistance and the first resistance that is connected in parallel.
Aforesaid train charging set proving installation, the described tester that overcharges is electric capacity.
Aforesaid train charging set proving installation, described mistake are put tester and are comprised the second battery of being cascaded (battery of using and current limliting use be same battery) and the second swept resistance here.
Aforesaid train charging set proving installation, described reometer is connected between described switch and the described detection terminal by shunt.
Description of drawings
In order to be illustrated more clearly in the utility model embodiment or technical scheme of the prior art, the below will do one to the accompanying drawing of required use in embodiment or the description of the Prior Art and introduce simply, apparently, accompanying drawing in the following describes is embodiment more of the present utility model, for those of ordinary skills, under the prerequisite of not paying creative work, can also obtain according to these accompanying drawings other accompanying drawing.
Fig. 1 is the structural representation of the utility model train charging set proving installation embodiment;
Fig. 2 is that the utility model train charging set proving installation embodiment is in the circuit theory diagrams under the current limliting detected state;
Fig. 3 is that the utility model train charging set proving installation embodiment is in the circuit theory diagrams that overcharge under the detected state;
Fig. 4 is that the utility model train charging set proving installation embodiment was in the circuit theory diagrams of putting under the detected state.
Embodiment
For the purpose, technical scheme and the advantage that make the utility model embodiment clearer, below in conjunction with the accompanying drawing among the utility model embodiment, technical scheme among the utility model embodiment is clearly and completely described, obviously, described embodiment is the utility model part embodiment, rather than whole embodiment.Based on the embodiment in the utility model, those of ordinary skills are not making the every other embodiment that obtains under the creative work prerequisite, all belong to the scope of the utility model protection.
Such as Fig. 1-shown in Figure 4, the present embodiment train charging set proving installation, comprise: detection terminal 1, switch 2, current limliting tester 3, overcharge tester 4 and cross and put tester 5, current limliting tester 3, overcharge tester 4 and put tester 5 and pass through respectively switch 2 and be connected with detection terminal 1 with being connected; Be in series with reometer 6 between detection terminal 1 and the switch 2, be parallel with voltage table 7 between detection terminal 1 and the switch 2.
Particularly, the present embodiment train charging set proving installation can be controlled current limliting tester 3, overcharge tester 4 and put tester 5 and connect respectively at detection terminal 1 with being connected by switch 2, thereby realizing charging set carried out current limliting, overcharges and cross puts detection.In the current limliting test process, current limliting tester 3 can comprise the first battery 31, the first swept resistance 32 and the first resistance 33 that is connected in parallel, switch 2 is connected current limliting tester 3 with detection terminal 1, by 31 chargings of 8 pairs of the first batteries of charging set, then reduce resistance by first swept resistance 32 that slides, when reometer 6 indications reach the current limit of charging set 8, if continue to reduce the resistance of the first swept resistance 32, the current value of reometer 6 does not increase, and then charging set 8 current-limiting functions are qualified.Overcharge overcharging test, overcharge tester 4 and can be electric capacity, 8 pairs of capacitor chargings of charging set, after voltage table 7 reaches the stop voltage of charging set 8 in indication, the magnitude of voltage of voltage table 7 does not increase, and then to overcharge function qualified for charging set 8.Put during test overcharges crossing, cross and put tester 5 and can comprise the second battery 51 and the second swept resistance 52 that is cascaded, second slide rheostat 52 that slides reduces the magnitude of voltage of voltage table 7, after voltage table 7 reaches the minimum voltage of charging set 8 in indication, the second battery 51 is stopped power supply, and then playing function is qualified excessively for charging set 8.Wherein, the reometer in the present embodiment 6 can be connected between switch 2 and the detection terminal 1 by shunt 61.Preferably, in order to effectively reduce the cost of the present embodiment train charging set proving installation, the first battery 31 and the second battery 51 in the present embodiment can that is to say for the same battery, current limliting tester 3 and cross and put tester 5 public batteries.
The present embodiment train charging set proving installation, by detection terminal is connected on the charging set, for detecting different projects, switch control current limliting tester, overcharge tester and put tester connection corresponding to detection terminal with being connected, just can know the parameter of charging set under different test items by reometer with voltage table, thereby judge whether charging set reaches requirement, realize having simplified the testing process of charging set, reduced operating personnel's labour intensity.
It should be noted that at last: above embodiment only in order to the technical solution of the utility model to be described, is not intended to limit; Although with reference to previous embodiment the utility model is had been described in detail, those of ordinary skill in the art is to be understood that: it still can be made amendment to the technical scheme that aforementioned each embodiment puts down in writing, and perhaps part technical characterictic wherein is equal to replacement; And these modifications or replacement do not make the essence of appropriate technical solution break away from the spirit and scope of each embodiment technical scheme of the utility model.
Claims (5)
1. train charging set proving installation, it is characterized in that, comprise: detection terminal, switch, current limliting tester, overcharge tester and cross and put tester, described current limliting tester, the described tester that overcharges were put tester and were connected with described detection terminal by described switch respectively with being connected; Be in series with reometer between described detection terminal and the described switch, be parallel with voltage table between described detection terminal and the described switch.
2. train charging set proving installation according to claim 1 is characterized in that, described current limliting tester comprises the first battery, the first swept resistance and the first resistance that is connected in parallel.
3. train charging set proving installation according to claim 1 is characterized in that, the described tester that overcharges is electric capacity.
4. train charging set proving installation according to claim 1 is characterized in that, described mistake is put tester and comprised the second battery and the second swept resistance that is cascaded.
5. arbitrary described train charging set proving installation is characterized in that according to claim 1-4, and described reometer is connected between described switch and the described detection terminal by shunt.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220432778 CN202758025U (en) | 2012-08-29 | 2012-08-29 | Testing arrangement for train charger |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220432778 CN202758025U (en) | 2012-08-29 | 2012-08-29 | Testing arrangement for train charger |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202758025U true CN202758025U (en) | 2013-02-27 |
Family
ID=47737197
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220432778 Expired - Fee Related CN202758025U (en) | 2012-08-29 | 2012-08-29 | Testing arrangement for train charger |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202758025U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104360182A (en) * | 2014-10-10 | 2015-02-18 | 国家电网公司 | Improved experimental wiring device of direct-current outputting end of charger |
-
2012
- 2012-08-29 CN CN 201220432778 patent/CN202758025U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104360182A (en) * | 2014-10-10 | 2015-02-18 | 国家电网公司 | Improved experimental wiring device of direct-current outputting end of charger |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9829529B2 (en) | Power supply apparatus | |
CN108028536B (en) | Battery monitoring device | |
CN111025037A (en) | Direct current fills electric pile testing arrangement and system | |
CN204990922U (en) | Pure electric vehicles BMS battery management system test bench | |
CN104539029A (en) | Electric vehicle alternating-current charging mode-III control device and electric vehicle alternating-current charging mode-III control method | |
CN203502540U (en) | Current transformer polarity tester | |
CN104112877A (en) | Lithium battery pack maintenance and performance detection apparatus | |
CN109921103B (en) | Maintenance method and system for storage battery pack and maintenance method and system for storage battery | |
CN102608371B (en) | Storage battery detecting device and undervoltage protection method thereof | |
CN108152750A (en) | The battery charging and discharging parameter identification method and system of a kind of electric vehicle | |
CN205067651U (en) | Detect distribution networking return circuit electric leakage device with adjustable | |
CN102946139B (en) | Spared powder automatic switching device of direct current (DC) power supply | |
CN104808078A (en) | Test system for battery management system function test | |
CN202758025U (en) | Testing arrangement for train charger | |
CN202815146U (en) | Polarity detector for mutual inductor | |
CN204465076U (en) | The online balancer of multiple batteries series battery | |
CN203589799U (en) | UPS uninterruptible power supply possessing storage battery monitoring function | |
KR200490808Y1 (en) | li-ion multi battery charger | |
CN203528320U (en) | Double-power-supply switching control system of electric vehicle | |
CN102544408B (en) | Battery box and mobile phone charging and discharging testing system | |
CN115308612A (en) | Module battery deep over-discharge testing system and method | |
CN104678310B (en) | A kind of method and apparatus for detecting battery malfunction | |
CN203929962U (en) | A kind of polarity calibration equipment | |
CN111883864A (en) | Power battery pack testing assembly and practical training platform | |
CN103809127A (en) | Remote automatic storage battery management and maintenance system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130227 Termination date: 20150829 |
|
EXPY | Termination of patent right or utility model |