CN202758014U - Integrated electric power test system - Google Patents

Integrated electric power test system Download PDF

Info

Publication number
CN202758014U
CN202758014U CN 201220342954 CN201220342954U CN202758014U CN 202758014 U CN202758014 U CN 202758014U CN 201220342954 CN201220342954 CN 201220342954 CN 201220342954 U CN201220342954 U CN 201220342954U CN 202758014 U CN202758014 U CN 202758014U
Authority
CN
China
Prior art keywords
data
electric power
test system
base station
data server
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220342954
Other languages
Chinese (zh)
Inventor
夏军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Sichuan Electric Power Co Ltd
Original Assignee
SICHUAN ELECTRIC POWER Corp MEISHAN Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SICHUAN ELECTRIC POWER Corp MEISHAN Co filed Critical SICHUAN ELECTRIC POWER Corp MEISHAN Co
Priority to CN 201220342954 priority Critical patent/CN202758014U/en
Application granted granted Critical
Publication of CN202758014U publication Critical patent/CN202758014U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The utility model relates to an electric power detection device, specifically to an integrated electric power test system. According to the integrated electric power test system, a hydraulic telescopic arm is arranged on a truck platform, a tail end of the hydraulic telescopic arm is provided with a data test end, the data test end is connected with a data server through a data line, the data server is connected with a communication base station, and the communication base station and the data server are arranged on the truck platform. The integrated electric power test system has the beneficial effects of high efficiency of detection and transmission of data, and little influence on a power grid.

Description

Integral type power test system
Technical field
The utility model relates to the electric power checkout equipment, is specially integral type power test system.
Background technology
The power equipment majority all is arranged on the field, and the mode present to the detection of equipment is: be transported to the testing laboratory after one, equipment being disassembled and detect; Two, carry the ting model detecting instrument to equipment location Site Detection.The applicable situation that needs large-scale checkout equipment of first kind mode, very high to dismounting, the landed cost of power equipment, and efficient is low, and the outage influence surface is large.Equations of The Second Kind mode sensing range is narrow, and data can not in time be transmitted.
Summary of the invention
The utility model is for above technical matters, and a kind of integral type power test system is provided.
Concrete technical scheme of the present utility model is as follows:
Integral type power test system, formed by communication base station, truck platform, hydraulic telescopic arm, data server, data test end, it is characterized in that: on the truck platform hydraulic telescopic arm is set, the end of hydraulic telescopic arm arranges the data test end, the data test end is by data line connection data server, data server connecting communication base station, communication base station, data server are arranged on the truck platform.
Integral type power test system directly arrives detected equipment place by the truck platform, adjust hydraulic telescopic arm according to on-the-spot needs, the data test end is placed in the sensing range, and the data that obtain from the data test end are delivered to data server and analyze and store again and be delivered to electric power operation data storehouse by communication base station.
Good effect of the present utility model is: detects and transmits the data efficiency height, and little to electric network influencing.
Description of drawings
Fig. 1 is structural representation of the present utility model.
Wherein, 1---communication base station, 2---truck platform, 3---hydraulic telescopic arm, 4---data server, 5---data test end.
Embodiment
The utility model is described in further detail below in conjunction with embodiment.
Integral type power test system, formed by communication base station, truck platform, hydraulic telescopic arm, data server, data test end, it is characterized in that: on the truck platform hydraulic telescopic arm is set, the end of hydraulic telescopic arm arranges the data test end, the data test end is by data line connection data server, data server connecting communication base station, communication base station, data server are arranged on the truck platform.
Integral type power test system directly arrives detected equipment place by the truck platform, adjust hydraulic telescopic arm according to on-the-spot needs, the data test end is placed in the sensing range, and the data that obtain from the data test end are delivered to data server and analyze and store again and be delivered to electric power operation data storehouse by communication base station.

Claims (1)

1. integral type power test system, formed by communication base station, truck platform, hydraulic telescopic arm, data server, data test end, it is characterized in that: on the truck platform hydraulic telescopic arm is set, the end of hydraulic telescopic arm arranges the data test end, the data test end is by data line connection data server, data server connecting communication base station, communication base station, data server are arranged on the truck platform.
CN 201220342954 2012-07-16 2012-07-16 Integrated electric power test system Expired - Lifetime CN202758014U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220342954 CN202758014U (en) 2012-07-16 2012-07-16 Integrated electric power test system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220342954 CN202758014U (en) 2012-07-16 2012-07-16 Integrated electric power test system

Publications (1)

Publication Number Publication Date
CN202758014U true CN202758014U (en) 2013-02-27

Family

ID=47737186

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220342954 Expired - Lifetime CN202758014U (en) 2012-07-16 2012-07-16 Integrated electric power test system

Country Status (1)

Country Link
CN (1) CN202758014U (en)

Similar Documents

Publication Publication Date Title
CN203630239U (en) Insulator wireless detection device
CN102435907A (en) Polarity test method for electronic current transformer
CN203299284U (en) Phase detecting device for 10kv switch cabinet
CN202758014U (en) Integrated electric power test system
CN104158606B (en) The concentrator communication module method of testing that a kind of automatic calibration system is special
CN204515030U (en) A kind of lightning protection comprehensive detection system
CN204065396U (en) A kind of automatic calibration concentrator based on RJ45 is plugged into terminal
CN202533575U (en) Intelligent electric-energy-meter detection system
CN104135405B (en) A kind of special communication module method of testing of special change III of automatic calibration system
CN204065151U (en) A kind of compatible concentrator of automatic calibration line and the terminal of plugging into of specially change III
CN202677597U (en) Underground substation environment monitoring system based on Internet of Things
CN201826256U (en) Adjustable detector for cables
CN202381313U (en) Pump efficiency detector
CN201786351U (en) Real-time detecting device for working conditions of oil extractor
CN204695093U (en) A kind of power communication machine room monitoring equipment
CN204887028U (en) Goliath hoist and mount process on -line measuring cloud service platform
CN202758013U (en) Power grid protection system in response to diagnosis
CN202994364U (en) Apparatus capable of detecting pressure of water supply network at any moment
CN203561442U (en) A buried pipe original ground temperature multi-point measuring instrument
CN203191501U (en) Fault location system for DC transmission line
CN204422742U (en) Intelligent electric energy meter remote supervision system
CN202362902U (en) Distribution transformer detecting system
CN202759286U (en) Composite power supply terminal management system
CN103879565A (en) Aircraft ground test-run parameter detection device
CN203387683U (en) Sensor network based on fiber grating sensor

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Effective date: 20140117

C41 Transfer of patent application or patent right or utility model
C56 Change in the name or address of the patentee

Owner name: MEISHAN POWER SUPPLY COMPANY, STATE GRID SICHUAN E

Free format text: FORMER NAME: SICHUAN ELECTRIC POWER CORPORATION, MEISHAN COMPANY

CP01 Change in the name or title of a patent holder

Address after: 620020, No. 150, East 2nd Ring Road, Dongpo District, Sichuan, Meishan

Patentee after: MEISHAN POWER SUPPLY COMPANY, STATE GRID SICHUAN ELECTRIC POWER Co.

Address before: 620020, No. 150, East 2nd Ring Road, Dongpo District, Sichuan, Meishan

Patentee before: SICHUAN ELECTRIC POWER CORPORATION MEISHAN Co.

TR01 Transfer of patent right

Effective date of registration: 20140117

Address after: 620020, No. 150, East 2nd Ring Road, Dongpo District, Sichuan, Meishan

Patentee after: MEISHAN POWER SUPPLY COMPANY, STATE GRID SICHUAN ELECTRIC POWER Co.

Patentee after: State Grid Corporation of China

Address before: 620020, No. 150, East 2nd Ring Road, Dongpo District, Sichuan, Meishan

Patentee before: MEISHAN POWER SUPPLY COMPANY, STATE GRID SICHUAN ELECTRIC POWER Co.

CX01 Expiry of patent term

Granted publication date: 20130227

CX01 Expiry of patent term