CN202759286U - Composite power supply terminal management system - Google Patents

Composite power supply terminal management system Download PDF

Info

Publication number
CN202759286U
CN202759286U CN 201220343041 CN201220343041U CN202759286U CN 202759286 U CN202759286 U CN 202759286U CN 201220343041 CN201220343041 CN 201220343041 CN 201220343041 U CN201220343041 U CN 201220343041U CN 202759286 U CN202759286 U CN 202759286U
Authority
CN
China
Prior art keywords
communication module
instrument
electric energy
management system
energy load
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220343041
Other languages
Chinese (zh)
Inventor
吕毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Sichuan Electric Power Co Ltd
Original Assignee
SICHUAN ELECTRIC POWER Corp MEISHAN Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SICHUAN ELECTRIC POWER Corp MEISHAN Co filed Critical SICHUAN ELECTRIC POWER Corp MEISHAN Co
Priority to CN 201220343041 priority Critical patent/CN202759286U/en
Application granted granted Critical
Publication of CN202759286U publication Critical patent/CN202759286U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model relates to an electric power load control device, specifically to a composite power supply terminal management system. According to the complex power supply terminal management system, a communication module is arranged on a root-level electric energy load calculating instrument, the communication module is connected with a switch and control circuit, the switch and control circuit is connected with three power circuits, the three power circuits are connected with a secondary electric energy load calculating instrument, a communication module is arranged on the secondary electric energy load calculating instrument, and the communication module is connected with a control server through a communication network. By implementing the composite power supply terminal management system disclosed by the utility model, the problem of electricity stealing or electricity leakage can be discovered effectively and timely.

Description

A kind of composite power supply terminal management system
Technical field
The utility model relates to power load control equipment, is specially a kind of composite power supply terminal management system.
Background technology
The problem that occurs easily in the electric power operation is to steal electrical phenomena, stealing electric molecule connects wires steathily and walks around electric energy meter, the electric power introducing is used, and the only symbolic a small amount of electricity consumption of its terminal electric energy meter, the electricity charge of electric power unit of operation are added up and are taken over after the unit interval finishes and carry out, stealing connecting wires steathily of electric molecule can set up and cancel at any time, this just causes being difficult to the stolen electricity charge of recovery, do not cancel even connect wires steathily, workload and the recovery cost of trend of finding its position is also very high, and existing paying the fees in advance filled card technique and can not fundamentally addressed this problem.
Summary of the invention
The utility model provides a kind of composite power supply terminal management system for above technical problem.
Concrete technical scheme of the present utility model is as follows:
A kind of composite power supply terminal management system, by root level power budget calculating instrument, communication module, switch and control circuit, the three-way power circuit, Control Server, secondary electric energy load gauge is counted instrument and is formed, on the root level power budget calculating instrument communication module is set, communication module connecting valve and control circuit, switch and control circuit connect the three-way power circuit, the secondary electric energy load gauge of three-way power connection is counted instrument, communication module connecting valve and control circuit on the root level power budget calculating instrument, secondary electric energy load gauge is counted communication module is set on the instrument, and communication module connects Control Server by communication network.
Under normal circumstances, the three-way power circuit only has one the tunnel to be communicated with.Control Server is counted the online data of instrument by communication network, communication module acquisition root level power budget calculating instrument, secondary electric energy load gauge, root level power budget calculating instrument, secondary electric energy load gauge should be consistent after counting data unified calculation between the instrument, count the data that instrument data sum is less than root level power budget calculating instrument if secondary electric energy load gauge occurs, that is existence power stealing or an electric leakage problem between the two, Control Server will be made cut-offing instruction, cut-offing instruction is dealt into communication module by communication network, and communication module carries out power operation by switch and control circuit.Then can carry out power stealing, building electricity specific aim inspection.Or Control Server makes one that connects in the three-way power circuit two other, and the data of then root level power budget calculating instrument, secondary electric energy load gauge being counted between the instrument are added up, and judge whether power stealing or electric leakage problem necessarily appear in the first circuit.
Can effectively, in time find power stealing or electric leakage problem by implementing the utility model, for investigation work provides foundation, occur namely to find and carry out inspection in power stealing or leaky one, stop the inferior class economic loss of unit of operation from the source, reduce the right-safeguarding cost.
Description of drawings
Fig. 1 is structural representation of the present utility model.
Wherein, 1---------the secondary electric energy load gauge of switch and control circuit, 4---Control Server, 5---is counted instrument to communication module, 3 to root level power budget calculating instrument, 2.
Embodiment
The utility model is described in further detail below in conjunction with embodiment.
A kind of composite power supply terminal management system, by root level power budget calculating instrument, communication module, switch and control circuit, the three-way power circuit, Control Server, secondary electric energy load gauge is counted instrument and is formed, on the root level power budget calculating instrument communication module is set, communication module connecting valve and control circuit, switch and control circuit connect the three-way power circuit, the secondary electric energy load gauge of three-way power connection is counted instrument, communication module connecting valve and control circuit on the root level power budget calculating instrument, secondary electric energy load gauge is counted communication module is set on the instrument, and communication module connects Control Server by communication network.
Under normal circumstances, the three-way power circuit only has one the tunnel to be communicated with.Control Server is counted the online data of instrument by communication network, communication module acquisition root level power budget calculating instrument, secondary electric energy load gauge, root level power budget calculating instrument, secondary electric energy load gauge should be consistent after counting data unified calculation between the instrument, count the data that instrument data sum is less than root level power budget calculating instrument if secondary electric energy load gauge occurs, that is existence power stealing or an electric leakage problem between the two, Control Server will be made cut-offing instruction, cut-offing instruction is dealt into communication module by communication network, and communication module carries out power operation by switch and control circuit.Then can carry out power stealing, building electricity specific aim inspection.Or Control Server makes one that connects in the three-way power circuit two other, and the data of then root level power budget calculating instrument, secondary electric energy load gauge being counted between the instrument are added up, and judge whether power stealing or electric leakage problem necessarily appear in the first circuit.

Claims (1)

1. composite power supply terminal management system, by root level power budget calculating instrument, communication module, switch and control circuit, the three-way power circuit, Control Server, secondary electric energy load gauge is counted instrument and is formed, it is characterized in that: on the root level power budget calculating instrument communication module is set, communication module connecting valve and control circuit, switch and control circuit connect the three-way power circuit, the secondary electric energy load gauge of three-way power connection is counted instrument, communication module connecting valve and control circuit on the root level power budget calculating instrument, secondary electric energy load gauge is counted communication module is set on the instrument, and communication module connects Control Server by communication network.
CN 201220343041 2012-07-16 2012-07-16 Composite power supply terminal management system Expired - Lifetime CN202759286U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220343041 CN202759286U (en) 2012-07-16 2012-07-16 Composite power supply terminal management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220343041 CN202759286U (en) 2012-07-16 2012-07-16 Composite power supply terminal management system

Publications (1)

Publication Number Publication Date
CN202759286U true CN202759286U (en) 2013-02-27

Family

ID=47738446

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220343041 Expired - Lifetime CN202759286U (en) 2012-07-16 2012-07-16 Composite power supply terminal management system

Country Status (1)

Country Link
CN (1) CN202759286U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104865439A (en) * 2015-06-01 2015-08-26 安徽禄讯电子科技有限公司 Electric energy metering device capable of malicious load identification

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104865439A (en) * 2015-06-01 2015-08-26 安徽禄讯电子科技有限公司 Electric energy metering device capable of malicious load identification

Similar Documents

Publication Publication Date Title
CN202759286U (en) Composite power supply terminal management system
CN204142798U (en) Multifunctional intellectual ammeter box
CN203720224U (en) Combined temporary utilized power metering box
CN202795709U (en) Dual-GPRS (general packet radio service) meter-reading concentrator
CN110741913A (en) Farmland intelligent irrigation control device
CN204633477U (en) A kind of precision intelligence alternating current-direct current distributing monitoring system
CN204116503U (en) Intelligent AC distribution equipment accurate monitoring device
CN103872765A (en) Intelligent-control electric power load system
CN203422793U (en) Three-phase local charge-controlled intelligent ammeter
CN103454037A (en) Hydraulic self-powered water pipe pressure measuring device
CN203027295U (en) Power data interactive system
CN203490308U (en) Double-configuration relay protection verification auxiliary apparatus
CN205353325U (en) Quick detection device of three -phase symmetrical alternating current electrical parameter
CN204065201U (en) A kind of electric energy meter remaining sum display device
CN204177977U (en) A kind of GPS positioning system for earth mat current by pass proving installation
CN204667148U (en) A kind of electric equipment control device based on Internet of Things
CN202649354U (en) Electric-energy extensible quality monitoring device
CN203054999U (en) Centralized recharge device of electric energy meter
CN203054140U (en) Intelligent on-line monitoring system
CN203014841U (en) Electric energy collection device with switching function
CN203672934U (en) Intelligent single-phase charge-control electric energy meter
CN202794262U (en) High-voltage complete switchgear power input wire four segment non-repeated metering device
CN204007502U (en) Sealing armouring high-voltage switch cubicle handcart formula contact of breaker depth of engagement measurement mechanism
CN103217616B (en) Intelligent wiring instrument
CN204992663U (en) Electric vehicle alternating -current charging pile

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Effective date: 20140115

C41 Transfer of patent application or patent right or utility model
C56 Change in the name or address of the patentee

Owner name: MEISHAN POWER SUPPLY COMPANY, STATE GRID SICHUAN E

Free format text: FORMER NAME: SICHUAN ELECTRIC POWER CORPORATION, MEISHAN COMPANY

CP01 Change in the name or title of a patent holder

Address after: 620020, No. 150, East 2nd Ring Road, Dongpo District, Sichuan, Meishan

Patentee after: MEISHAN POWER SUPPLY COMPANY, STATE GRID SICHUAN ELECTRIC POWER Co.

Address before: 620020, No. 150, East 2nd Ring Road, Dongpo District, Sichuan, Meishan

Patentee before: SICHUAN ELECTRIC POWER CORPORATION MEISHAN Co.

TR01 Transfer of patent right

Effective date of registration: 20140115

Address after: 620020, No. 150, East 2nd Ring Road, Dongpo District, Sichuan, Meishan

Patentee after: MEISHAN POWER SUPPLY COMPANY, STATE GRID SICHUAN ELECTRIC POWER Co.

Patentee after: State Grid Corporation of China

Address before: 620020, No. 150, East 2nd Ring Road, Dongpo District, Sichuan, Meishan

Patentee before: MEISHAN POWER SUPPLY COMPANY, STATE GRID SICHUAN ELECTRIC POWER Co.

CX01 Expiry of patent term

Granted publication date: 20130227

CX01 Expiry of patent term