CN202745854U - petroleum drilling hard shut-in simulation experiment device - Google Patents

petroleum drilling hard shut-in simulation experiment device Download PDF

Info

Publication number
CN202745854U
CN202745854U CN 201220300768 CN201220300768U CN202745854U CN 202745854 U CN202745854 U CN 202745854U CN 201220300768 CN201220300768 CN 201220300768 CN 201220300768 U CN201220300768 U CN 201220300768U CN 202745854 U CN202745854 U CN 202745854U
Authority
CN
China
Prior art keywords
pressure sensor
electromagnetic valve
flow meter
pvc pipe
centrifugal pump
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220300768
Other languages
Chinese (zh)
Inventor
张耀明
严永发
林发权
蒋光强
邹光贵
李军刚
王裕海
杜峰辉
杨松
徐银燕
韩传军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd
Original Assignee
Petrochina Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Petrochina Co Ltd filed Critical Petrochina Co Ltd
Priority to CN 201220300768 priority Critical patent/CN202745854U/en
Application granted granted Critical
Publication of CN202745854U publication Critical patent/CN202745854U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The petroleum drilling hard shut-in simulation experiment device is applied to the data acquisition of petroleum drilling hard shut-in simulation experiment. Is characterized in that: the water outlet of the water tank is connected with the inlet of the centrifugal pump through a pipeline; the outlet of the centrifugal pump is sequentially connected with a check valve, a first pressure sensor and a first flowmeter through a PVC pipe; the outlet end of the first flowmeter is sequentially connected with a second pressure sensor, a first electromagnetic valve, a third pressure sensor and a second electromagnetic valve through PVC pipes; the outlet end of the second electromagnetic valve is connected with the inlet end of the second flowmeter through a PVC pipe, and the outlet end of the second flowmeter is connected with the PVC pipe. The effect is as follows: the device can realize the simulated measurement of the water hammer pressure of the drilling well with different flow rates and different well closing time, can realize the hard well closing simulation of the overflow and blowout working conditions by using conventional and normal pressure equipment, does not need to measure the actual working conditions, and has the advantages of low manufacturing cost, easy measurement, reduction of engineering risks and the like.

Description

Oil drilling hard closing analogue experiment installation
Technical field
The utility model relates to the petroleum drilling technology field, and particularly a kind of drilling well ground experiment device is a kind of oil drilling hard closing analogue experiment installation.
Background technology
At present, in the petroleum engineering well drilling process, when overflow or blowout occur, can produce the sudden change of pressure jump and flow during owing to closing well.And these two kinds of sudden changes all can produce the very large water hammer of harm.Because the water attack meeting makes superpressure in preventer inside and the well at the very large pressure of moment generation, and easy link (such as the casing shoe place) generation pressure leakage stratum accident the weakest in well, thereby normal wellbore construction affected.Therefore, water attack problem obtains paying attention to more and more widely.
The scene shows: if take " soft closing " mode, although the surge pressure during closing well is less to formation damage, but owing to can cause the further intrusion well of formation fluid, cause the generation of parasitic pressure drop, thereby increase stratum, casing shoe place by the danger of pressure break, be unfavorable for next step kill job; If take " hard closing ", surge pressure will impact preventer when then worrying closing well.Want reasonable selection closing well mode and just need to carry out ground experiment, the water attack problem when making closing well clear.Because a bite oil well is very high at cost, and hard closing might damage oil well, therefore, should not measure the surge pressure of closing well process in drilling process.
Method and the device of the Water Hammer that well head and casing shoe place produce when now, energy Accurate Determining hard closing being arranged not yet.
The utility model content
The purpose of this utility model is: a kind of oil drilling hard closing analogue experiment installation is provided, can carries out carrying out the test of hard closing surge pressure on ground when overflow and blowout.Use the simulation hard closing under the principle of similitude to avoid risk, save cost, and be used for instructing drilling well production.
The technical solution adopted in the utility model is: oil drilling hard closing analogue experiment installation, comprise water tank, centrifugal pump, flap valve, the first pressure sensor, first flow meter, the second pressure sensor, the first electromagnetic valve, the 3rd pressure sensor, the second electromagnetic valve and the second flow meter, it is characterized in that: the entrance that connects centrifugal pump at the delivery port of water tank by pipeline; Centrifugal delivery side of pump connects flap valve, the first pressure sensor and first flow meter successively by pvc pipe; The port of export of first flow meter connects the second pressure sensor, the first electromagnetic valve, the 3rd pressure sensor and the second electromagnetic valve successively by pvc pipe; The port of export of the second electromagnetic valve connects the arrival end of the second flow meter by pvc pipe, and the port of export of the second flow meter connects pvc pipe.
Described the first pressure sensor, first flow meter, the second pressure sensor, the 3rd pressure sensor and the flow meter of being connected connect the computer data acquiring card by holding wire.
The operating principle of summary oil drilling hard closing analogue experiment installation.Consult Fig. 1.Centrifugal pump 2 obtains fluid and it is pumped in the pvc pipe from water tank 1, flap valve 3, electromagnetic valve 7 and electromagnetic valve 9 are all opened at this moment, show value electromagnetic valve for adjusting 9 according to flow meter 10, make the flow in the pipeline meet the flow rate calculation value that draws according to the principle of similitude, the measured value of record pressure sensor 8.Then the simulation closed-in time that calculates according to the principle of similitude, shut electromagnetic valve 7 with the measured value of data collecting card record pressure sensor 6, pressure sensor 4 and flow meter 5, and carries out the water attack analog computation of hard closing according to the principle of similitude.When changing, water attack time and flow repeat above-mentioned steps.Use centrifugal pump, pressure sensor, flow meter and choke valve to realize the adjusting of flow, mensuration and the simulation of surge pressure.Use the common PVC pipe die to intend well casing, and install back pressure valve, pressure sensor, choke valve and flow meter at pipeline.But choke valve flexible modulation flow, flow and pressure in pressure sensor and the flow transmitter energy Accurate Determining pipeline, and can use capture card to carry out data acquisition.
The beneficial effects of the utility model: the utility model oil drilling hard closing analogue experiment installation, can realize different flow, the drilling well water attack pressure simulation of different closed-in times mensuration, can use routine, normal pressure equipment to realize the hard closing simulation is carried out in overflow and blowout operating mode, and measure (actual condition also be difficult to measure) without actual condition, have cheap, be easy to measure, reduce the advantages such as engineering risk.
Description of drawings
Fig. 1 is the utility model oil drilling hard closing analogue experiment installation structural representation.
Among the figure, 1-water tank, 2-centrifugal pump, 3-flap valve, 4-the first pressure sensor, 5-first flow meter, 6-the second pressure sensor, 7-the first electromagnetic valve, 8-the 3rd pressure sensor, 9-the second electromagnetic valve, 10-the second flow meter.
The specific embodiment
Embodiment 1: take an oil drilling hard closing analogue experiment installation as example, the utility model is described in further detail.
Consult Fig. 1.The utility model oil drilling hard closing analogue experiment installation comprises water tank 1, centrifugal pump 2, flap valve 3, the first pressure sensor 4, first flow meter 5, the second pressure sensor 6, the first electromagnetic valve 7, the 3rd pressure sensor 8, the second electromagnetic valve 9 and the second flow meter 10.The entrance that connects centrifugal pump 2 at the delivery port of water tank 1 by pipeline.The outlet of centrifugal pump 2 connects flap valve 3, the first pressure sensor 4 and first flow meter 5 successively by pvc pipe.The port of export of first flow meter 5 connects the second pressure sensor 6, the first electromagnetic valve 7, the 3rd pressure sensor 8 and the second electromagnetic valve 9 successively by pvc pipe.The port of export of the second electromagnetic valve 9 connects the arrival end of the second flow meter 10 by pvc pipe, and the port of export of the second flow meter 10 connects pvc pipe.The first pressure sensor 4, first flow meter 5, the second pressure sensor 6, the 3rd pressure sensor 8 and the flow meter 10 of being connected connect the computer data acquiring card by holding wire.

Claims (2)

1. oil drilling hard closing analogue experiment installation, comprise water tank (1), centrifugal pump (2), flap valve (3), the first pressure sensor (4), first flow meter (5), the second pressure sensor (6), the first electromagnetic valve (7), the 3rd pressure sensor (8), the second electromagnetic valve (9) and the second flow meter (10), it is characterized in that: the entrance that connects centrifugal pump (2) at the delivery port of water tank (1) by pipeline; The outlet of centrifugal pump (2) connects flap valve (3), the first pressure sensor (4) and first flow meter (5) successively by pvc pipe; The port of export of first flow meter (5) connects the second pressure sensor (6), the first electromagnetic valve (7), the 3rd pressure sensor (8) and the second electromagnetic valve (9) successively by pvc pipe; The port of export of the second electromagnetic valve (9) connects the arrival end of the second flow meter (10) by pvc pipe, and the port of export of the second flow meter (10) connects pvc pipe.
2. oil drilling hard closing analogue experiment installation according to claim 1 is characterized in that: described the first pressure sensor (4), first flow meter (5), the second pressure sensor (6), the 3rd pressure sensor (8) and the flow meter (10) of being connected connect the computer data acquiring card by holding wire.
CN 201220300768 2012-06-21 2012-06-21 petroleum drilling hard shut-in simulation experiment device Expired - Fee Related CN202745854U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220300768 CN202745854U (en) 2012-06-21 2012-06-21 petroleum drilling hard shut-in simulation experiment device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220300768 CN202745854U (en) 2012-06-21 2012-06-21 petroleum drilling hard shut-in simulation experiment device

Publications (1)

Publication Number Publication Date
CN202745854U true CN202745854U (en) 2013-02-20

Family

ID=47705271

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220300768 Expired - Fee Related CN202745854U (en) 2012-06-21 2012-06-21 petroleum drilling hard shut-in simulation experiment device

Country Status (1)

Country Link
CN (1) CN202745854U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104851268A (en) * 2015-04-30 2015-08-19 西南石油大学 Blowout emergency drill simulation system and blowout emergency drill simulation method
CN106468164A (en) * 2015-08-21 2017-03-01 崔磊 Shale gas pressure break sleeve pipe collapse resistance designs
CN107035327A (en) * 2017-05-09 2017-08-11 中国石油大学(北京) The method and apparatus for determining transient surge pressure during start and stop pump
CN110131588A (en) * 2019-05-21 2019-08-16 珠江水利委员会珠江水利科学研究院 Long range water supply line water hammer experimental rig
CN110487475A (en) * 2018-05-15 2019-11-22 中国石油化工股份有限公司 Pressure monitoring device and method between a kind of foam slurry waiting-on-cement
CN114566072A (en) * 2022-02-25 2022-05-31 中国海洋石油集团有限公司 Blowout emergency drilling simulation system

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104851268A (en) * 2015-04-30 2015-08-19 西南石油大学 Blowout emergency drill simulation system and blowout emergency drill simulation method
CN106468164A (en) * 2015-08-21 2017-03-01 崔磊 Shale gas pressure break sleeve pipe collapse resistance designs
CN107035327A (en) * 2017-05-09 2017-08-11 中国石油大学(北京) The method and apparatus for determining transient surge pressure during start and stop pump
CN107035327B (en) * 2017-05-09 2018-06-01 中国石油大学(北京) Determine start and stop pump during transient surge pressure method and apparatus
CN110487475A (en) * 2018-05-15 2019-11-22 中国石油化工股份有限公司 Pressure monitoring device and method between a kind of foam slurry waiting-on-cement
CN110131588A (en) * 2019-05-21 2019-08-16 珠江水利委员会珠江水利科学研究院 Long range water supply line water hammer experimental rig
CN114566072A (en) * 2022-02-25 2022-05-31 中国海洋石油集团有限公司 Blowout emergency drilling simulation system
CN114566072B (en) * 2022-02-25 2024-04-19 中国海洋石油集团有限公司 Blowout emergency drilling simulation system

Similar Documents

Publication Publication Date Title
CN202745854U (en) petroleum drilling hard shut-in simulation experiment device
CN205301140U (en) Simulation oil pipe corrodes visual device of scale deposit
CN105114043B (en) A kind of system and method for improving deep water gas field gaslift water pumping gas production recovery ratio
CN105114061A (en) Multi-parameter combination test rapid water exploration pipe column and method for immobile pipe column of horizontal well
CN104504611A (en) Method for determining whether liquid is accumulated in gas well and liquid accumulation degree of gas well
CN103510940B (en) Comprehensive diagnosis and analysis method and device for mechanical oil production well working condition
CN110325705A (en) System and method for operating blowout preventer system
CN202194628U (en) Integrated device of Christmas tree and gas well ground construction assembly skid
CN204266986U (en) Carbon dioxide flooding oil field well head device
CN103335762B (en) Performance test method and performance test device of high-power fracturing pump truck
CN203515558U (en) Deep well water source well water level monitoring process pipe column
CN202810754U (en) Standard wellhead flow path device for electric submersible centrifugal pump well
CN107725028A (en) A kind of horizontal well AICD intelligent water-controlleds screen casing performance test system
CN114383554B (en) Submarine pipeline length calculation method for underwater HIPPS downstream high-pressure section
CN102706751B (en) One is pipe laying multifunctional detecting device vertically
CN211785431U (en) Drag reducer evaluation instrument for convenient slickwater fracturing
CN104405364B (en) Oil well production characteristic evaluation method and device
CN208294499U (en) A kind of normal pressure shale gas water drainage gas production device
CN205025412U (en) Multi-parameter combination test rapid water exploration pipe column for fixed pipe column of horizontal well
CN201778995U (en) Simulative deep well testing pipeline utilizing submersible pump
CN203603834U (en) Underground shooting-type plugging tool for coiled tubing
CN205483826U (en) Simple and easy experimental apparatus of water shutoff profile control agent shutoff intensity
CN203925432U (en) A kind of production tree device
CN203362136U (en) Flow regulating and controlling device for oilfield flooding
CN202745840U (en) High-efficiency separate injection pipe column for highly-deviated well

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130220

Termination date: 20210621

CF01 Termination of patent right due to non-payment of annual fee