CN202744230U - Tower crane arm front end buckling rope rotation integration device - Google Patents

Tower crane arm front end buckling rope rotation integration device Download PDF

Info

Publication number
CN202744230U
CN202744230U CN 201220418165 CN201220418165U CN202744230U CN 202744230 U CN202744230 U CN 202744230U CN 201220418165 CN201220418165 CN 201220418165 CN 201220418165 U CN201220418165 U CN 201220418165U CN 202744230 U CN202744230 U CN 202744230U
Authority
CN
China
Prior art keywords
steel wire
crane arm
rope
tower crane
axle sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220418165
Other languages
Chinese (zh)
Inventor
孙宝龙
杨道华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU ZHENGXING CONSTRUCTION MACHINE CO Ltd
Original Assignee
JIANGSU ZHENGXING CONSTRUCTION MACHINE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU ZHENGXING CONSTRUCTION MACHINE CO Ltd filed Critical JIANGSU ZHENGXING CONSTRUCTION MACHINE CO Ltd
Priority to CN 201220418165 priority Critical patent/CN202744230U/en
Application granted granted Critical
Publication of CN202744230U publication Critical patent/CN202744230U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model discloses a tower crane arm front end buckling rope rotation integration device which comprises a cargo boom body, a steel wire rope fixing installing seat (4) is arranged at the front end of the cargo boom body. The tower crane arm front end buckling rope rotation integration device is characterized in that a steel wire rope force discharging device (1) is arranged in the steel wire rope fixing installing seat (4), and the steel wire rope is movably connected with the cargo boom body through the steel wire rope force discharging device (1). The problems that a tower crane is convenient and safe hazard is caused if torque force is not released in an existing tower crane steel rope are solved. Meanwhile, the problem that use cost and production cost of an enterprise by a force discharging steel wire rope is solved.

Description

Tower horn front end button rope revolution integrated device
Technical field
The utility model relates to tower machine component device technical field, is specifically related to tower horn front end button rope revolution integrated device.
Background technology
The tower machine, it is our said tower crane, be called again tower crane, it is a kind of weight-lifting equipment for building operation, at present, used tower machine on the market, usually there is a problem, the steel rope that is the tower machine in use often produces certain torsion, if torsion can not get discharging for a long time, torsion gathers can make after certain degree between the tower machine steel rope and mutually twines, and has brought inconvenience not only for the normal operation of tower machine, and if the suspension hook rotation occurs in the lifting cargo process, also can cause certain potential safety hazard, we adopt the mode that tower machine steel rope is disassembled to discharge the torsion that steel rope gathers usually at present, the power steel rope also occurred unloading on the market now, unload production and the use cost that the power steel rope can increase enterprise greatly but adopt.
Summary of the invention
The technical problems to be solved in the utility model provides tower horn front end button rope revolution integrated device, this technical scheme not only efficiently solves existing tower machine steel rope, if torsion can not get discharging, make troubles not only can for the work of tower machine, but also can cause the problem of potential safety hazard, and solved to adopt and unload the power steel rope, increased the use of enterprise and the problem of productive costs.
The utility model is achieved through the following technical solutions:
Tower horn front end button rope revolution integrated device, comprise the crane arm body, crane arm body front end is provided with steel rope fixed mounting 4, it is characterized in that: be provided with steel wire force removing device 1 in the described fixed mounting 4, steel rope is flexibly connected by steel wire force removing device 1 and crane arm body.
The further Technological improvement plan of the utility model is:
Described steel wire force removing device 1 comprises axle sleeve 12, and axle sleeve 12 1 end ports are provided with tightening latch 11, and the opposite end is provided with fixed cover 3, is provided with bearing 13 between axle sleeve 12 and the fixed mounting 4.
The further Technological improvement plan of the utility model is:
Described bearing 13 is the plane axial roller bearing.
The further Technological improvement plan of the utility model is:
The captive joint mode of described tightening latch 11 and axle sleeve 12 ports is connected for welding or for fastener.
The utility model compared with prior art, have following obvious advantage: the utility model adopts steel wire force removing device, if steel rope exists torsion to discharge from being about to steel cable rope torsion by steel wire force removing device, and torsion can be discharged into steel wire rope hook one end, work efficiency and the safety of tower machine have been improved, the utility model is simple in structure, design science, cost are low, is convenient to promote the use of.
Description of drawings
Fig. 1 is structural representation Fig. 1 of the present utility model.
The specific embodiment
As shown in Figure 1, the utility model comprises in this stereogram of crane arm and not providing, crane arm body front end is provided with steel rope fixed mounting 4, be provided with steel wire force removing device 1 in the fixed mounting 4, steel rope is flexibly connected by steel wire force removing device 1 and crane arm body, steel wire force removing device 1 comprises axle sleeve 12, axle sleeve 12 1 end ports are provided with tightening latch 11, the opposite end is provided with fixed cover 3, fixed cover 3 so that axle sleeve 12 can in fixed mounting 4, not skid off, be provided with bearing 13 between axle sleeve 12 and the fixed mounting 4, described bearing 13 is the plane axial roller bearing, and described tightening latch 11 is welding with the mode of captiveing joint of axle sleeve 12 ports, or be that fastener connects.
Sketch working process of the present utility model in conjunction with figure one:
At first steel rope 2 is pierced into from the end that axle sleeve 12 is provided with fixed cover 3, steel rope 2 passes from the other end, then the pile warp tightening latch 11, again pierce into axle sleeve 12, pass from an end that is provided with fixed cover 3, then fix with wire rope grip, if there is torsion in steel rope 2, then fixed cover 3 will be laid down torsion by oneself rotation.
The utility model does not relate to partly all, and the prior art that maybe can adopt same as the prior art is realized.

Claims (4)

1. tower horn front end button rope turns round integrated device, comprise the crane arm body, crane arm body front end is provided with steel rope fixed mounting (4), it is characterized in that: be provided with steel wire force removing device (1) in the described fixed mounting (4), steel rope is flexibly connected by steel wire force removing device (1) and crane arm body.
2. tower horn front end button rope according to claim 1 turns round integrated device, it is characterized in that: described steel wire force removing device (1) comprises axle sleeve (12), axle sleeve (12) one end ports are provided with tightening latch (11), the opposite end is provided with fixed cover (3), is provided with bearing (13) between axle sleeve (12) and the fixed mounting (4).
3. tower horn front end button rope according to claim 2 turns round integrated device, and it is characterized in that: described bearing (13) is the plane axial roller bearing.
4. tower horn front end button rope according to claim 2 revolution integrated device is characterized in that: the captive joint mode of described tightening latch (11) and axle sleeve (12) port is for welding or being connected for fastener.
CN 201220418165 2012-08-22 2012-08-22 Tower crane arm front end buckling rope rotation integration device Expired - Fee Related CN202744230U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220418165 CN202744230U (en) 2012-08-22 2012-08-22 Tower crane arm front end buckling rope rotation integration device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220418165 CN202744230U (en) 2012-08-22 2012-08-22 Tower crane arm front end buckling rope rotation integration device

Publications (1)

Publication Number Publication Date
CN202744230U true CN202744230U (en) 2013-02-20

Family

ID=47703659

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220418165 Expired - Fee Related CN202744230U (en) 2012-08-22 2012-08-22 Tower crane arm front end buckling rope rotation integration device

Country Status (1)

Country Link
CN (1) CN202744230U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104132062A (en) * 2014-07-14 2014-11-05 洛阳百思特精密机械制造有限公司 Spherical base surface cylinder roller thrust bearing

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104132062A (en) * 2014-07-14 2014-11-05 洛阳百思特精密机械制造有限公司 Spherical base surface cylinder roller thrust bearing

Similar Documents

Publication Publication Date Title
CN204355957U (en) A kind of novel pipeline anchor ear lifting connection structure
CN202481895U (en) Auxiliary device for lifting large grinding wheel
CN202744230U (en) Tower crane arm front end buckling rope rotation integration device
CN202164039U (en) Device for preventing lifting hook from rotating horizontally
CN202625646U (en) Steel wire rope twisting preventing device
CN203345975U (en) Installation device of hoisting steel wire rope and tower crane
CN206553089U (en) A kind of lifting block
CN206033030U (en) Wire rope unhooking -prevention device
CN204588443U (en) The special tool of dismounting side dump wagon side board
CN203545424U (en) Rotary shackle
CN201002934Y (en) Anti-wringing device for crane wire rope
CN203509511U (en) Device for demounting large coupler
CN203269348U (en) Hook structure for hoisting heavy objects
CN204493902U (en) A kind of knot for lifting pipeline
CN203548709U (en) U-shaped anti-rotating sleeve
CN202542681U (en) Hoisting tool
CN203888553U (en) Traction device of loading machine
CN202597392U (en) Derrick mast connecting screw
CN207484488U (en) A kind of recyclable safety rope safety fastener between bracing members and pile body
CN103466428A (en) Rotating shackle
CN204454245U (en) Equalizing bar special hanger
CN201506688U (en) Lower contact for jib of tower crane
CN202441846U (en) Speed reducer shell
CN206908245U (en) A kind of fast assembling-disassembling parallel groove clamp
CN202301848U (en) Hay pulley for unloading logging cable

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130220

Termination date: 20130822