CN202706637U - Video monitoring system mounting hold-hoop support for steel tube tower in electric transmission line - Google Patents
Video monitoring system mounting hold-hoop support for steel tube tower in electric transmission line Download PDFInfo
- Publication number
- CN202706637U CN202706637U CN 201220306423 CN201220306423U CN202706637U CN 202706637 U CN202706637 U CN 202706637U CN 201220306423 CN201220306423 CN 201220306423 CN 201220306423 U CN201220306423 U CN 201220306423U CN 202706637 U CN202706637 U CN 202706637U
- Authority
- CN
- China
- Prior art keywords
- hoop bracket
- hoop
- hold
- steel tube
- monitoring system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Suspension Of Electric Lines Or Cables (AREA)
Abstract
The utility model relates to a video monitoring system mounting hold-hoop support for a steel tube tower in an electric transmission line. The video monitoring system mounting hold-hoop support comprises a mounting base, primary hold-hoop supports and secondary hold-hoop supports. The mounting base is welded on the primary hold-hoop supports. The primary hold-hoop supports are fixed with the secondary hold-hoop supports through nuts. Through adoption of the stable stress principle of a triangle on the mounting base, movable parts aloft are reduced, the parts aloft are prevented from accidentally falling down. The video monitoring system mounting hold-hoop support enables articles hoisted aloft to be decreased as many as possible so as to enable installation operation aloft to be simpler, faster and safer. The primary hold-hoop supports and the secondary hold-hoop supports adopt the up-and-down multilayer hold-hoop design, and disassembly is convenient through fixed connection between the nuts and the primary hold-hoop supports. Moreover, bearing capacity of the integral support becomes very strong, the contact area between the hold-hoop support and the steel tube tower is increased, and stress of the hold-hoop support to the contact portion of the steel tube tower is evenly dispersed.
Description
Technical field
The utility model relates to preventing damage to power transmission line caused by external force intelligent early-warning system engineering, especially a kind of hoop bracket for video monitoring system is installed on the steel tube tower in electric transmission line.
Background technology
National interconnected power grid take the ultra-high/extra-high voltage transmission line of electricity as main framing is just changing the energy general layout of China, is promoting comprehensive sustainable development of economic society.Therefore the reliability service of transmission line of electricity concern economic development and the social people's livelihood propose higher requirement to transmission line of electricity.Steel tube tower is the important component part of transmission line of electricity, and along with the progressively construction of the interconnected macroreticular of transmission line of electricity, the use of steel tube tower is in continuous increase.At present, there is no at the ultra-high-tension power transmission line steel tube tower support that can bear larger load is installed, design neither damages steel tube tower in electric transmission line and has the support that bears larger load-bearing capacity has very strong realistic meaning and engineering practical value.
It is extremely difficult that equipment is installed on the ultra-high-tension power transmission line steel tube tower, and reason is as follows:
1) existing hoop bracket is too thin, can only be used for the lighter equipment of erection weight, does not possess the ability of bearing heavier equipment;
2) steel tube tower is in the wild environment, and it is higher with respect to ground that equipment is installed in the position of steel tube tower, and climate change scenario is complicated, the time have the bad weathers such as strong wind, heavy rain to occur.The problems such as equipment waves with the wind, falls very easily appear in erection equipment on the existing hoop bracket in adverse circumstances;
3) existing hoop bracket can only be installed simple equipment, relatively difficulty of some auxiliary equipment is installed at anchor ear.
The utility model content
Technical problem to be solved in the utility model is the deficiency for the above-mentioned background technology, and a kind of hoop bracket for video monitoring system is installed on the steel tube tower in electric transmission line is provided.
The utility model adopts following technical scheme for solving the problems of the technologies described above:
A kind of hoop bracket for video monitoring system is installed on the steel tube tower in electric transmission line comprises mounting base, main hoop bracket, secondary hoop bracket, and described mounting base, secondary hoop bracket all are fixedly connected with main hoop bracket by bolt, nut; Described main hoop bracket, secondary hoop bracket have identical structure, wherein: described main hoop bracket comprises the arc anchor ear sheet of n layer parallel arrangement, the two ends of every one deck arc anchor ear sheet all are welded with a square steel disc, and it is the natural number greater than 2 that circular punching, n are arranged on the square steel disc; In the main hoop bracket in every layer of arc anchor ear sheet and the secondary hoop bracket arc anchor ear sheet of respective layer on the same level face.
Further, described a kind of hoop bracket for video monitoring system is installed on the steel tube tower in electric transmission line, mounting base comprises two opening support frames that structure is identical, and an outside framework; Wherein:
The opening of described two opening support frames is towards the lateral wall of main hoop bracket, and is fixedly welded on symmetrically respectively on the lateral wall of main hoop bracket; Described outside framework is fitted on two opening support frame outer walls, is provided with the circular punching of installing for fixture in the joint place of outside framework and two opening support frames.
Further, described a kind of hoop bracket for video monitoring system is installed on the steel tube tower in electric transmission line, two opening support frames are the right angle U-shaped, and the two ends of outside framework fit together with the base, right angle of described two opening support frames respectively.
Further, described a kind of hoop bracket for video monitoring system is installed on the steel tube tower in electric transmission line, the weld of an end of two opening support frames and the lateral wall of main hoop bracket is connected to each other.
The utility model adopts technique scheme, have following beneficial effect: mounting base has used triangle to stablize stressed principle, reduced at the aerial movable part of height, prevent high-altitude part accidental falling, it is simpler, faster, safer to make lifting high-altitude article reduce as much as possible to reach the high-altitude installation exercise.The major-minor hoop bracket has adopted up and down multilayer anchor ear design, is fixedly connected with convenient disassembly by nut with main hoop bracket; Make simultaneously very firm of integral support load-bearing, increased the contact area between hoop bracket and the steel tube tower, the Uniform Dispersion hoop bracket is to the stress of steel tube tower contact portion.
Description of drawings
Fig. 1 is for being used for installing on the steel tube tower in electric transmission line assembling drawing of the hoop bracket of video monitoring system.
Fig. 2 is for being used for installing on the steel tube tower in electric transmission line top view of the hoop bracket of video monitoring system.
Fig. 3 is for being used for installing on the steel tube tower in electric transmission line axis side views such as support of the main hoop bracket of video monitoring system.
Fig. 4 is for being used for installing on the steel tube tower in electric transmission line assembling drawing of the secondary hoop bracket of main hoop bracket of video monitoring system.
Number in the figure explanation: 1, mounting base, 2, secondary hoop bracket, 3, main hoop bracket, 4, the mounting base locking hole, 5, mounting base locking nut, 6, hoop bracket lock bolt, 7, the hoop bracket locking nut, 8, reinforcing rib, 9, main hoop bracket ear, 10, main hoop bracket locking hole, 11, secondary hoop bracket locking hole, 12, secondary hoop bracket ear.
The specific embodiment
Below in conjunction with accompanying drawing the technical solution of the utility model is elaborated:
Such as Fig. 1, Fig. 2, Fig. 3, a kind of hoop bracket for video monitoring system is installed on the steel tube tower in electric transmission line shown in Figure 4, comprise mounting base 1, secondary hoop bracket 2, main hoop bracket 3, mounting base locking hole 4, mounting base locking nut 5, hoop bracket lock bolt 6, hoop bracket locking nut 7, reinforcing rib 8, main hoop bracket ear 9, main hoop bracket locking hole 10, secondary hoop bracket locking hole 11, secondary hoop bracket ear 12.
Be used for the axis side views such as support of the main hoop bracket of installation video monitoring system on the steel tube tower in electric transmission line as shown in Figure 3.Main hoop bracket 3 comprises the arc anchor ear sheet of two-layer parallel arrangement, there is main hoop bracket ear 9 at the two ends of every one deck arc anchor ear sheet, be welded with reinforcing rib 8 between main hoop bracket ear 9 and the arc anchor ear sheet, main hoop bracket ear 9 centers are drilled with main hoop bracket locking hole 10.Main hoop bracket and secondary hoop bracket fix and are connected by insert hoop bracket locking nut 7 between main hoop bracket locking hole 10, secondary hoop bracket locking hole 11.Mounting base 1 comprises two opening support frames, outside framework.The support frame of two openings is identical right angle U-shaped framework.Right angle U-shaped framework comprises the different parallel edges of two length and perpendicular to the right-angle side of parallel edges.The parallel edges of right angle U-shaped framework is welded on arc anchor ear sheet lateral wall center in the direction perpendicular to arc anchor ear sheet string, and the parallel edges of two right angle U-shaped frameworks is 90 degree angles simultaneously.Outside framework fits tightly and surrounds two right angle U-shaped frameworks, contacts and is welded on the main hoop bracket with 4 of each layer arc anchor ear sheets up and down.Be drilled with mounting base locking hole 4 on the vertical edges of shell and the first right angle U-shaped framework, be drilled with mounting base locking hole 4 on the vertical edges of shell and the second right angle U-shaped framework, be welded with mounting base locking nut 5 in the mounting base locking hole 4, be convenient to plug-in video monitoring equipment.The height of mounting base 1 is determined according to the number of anchor ear sheet.
As shown in Figure 4, secondary hoop bracket 2 comprises the arc anchor ear sheet of two-layer parallel arrangement, there is secondary hoop bracket ear 12 at the two ends of every one deck arc anchor ear sheet, be welded with reinforcing rib 8 between main hoop bracket ear 12 and the arc anchor ear sheet, main hoop bracket ear 12 centers are drilled with main hoop bracket locking hole 11.The arc anchor ear sheet of respective layer is fixedly connected with by the hoop bracket locking nut in every one deck arc anchor ear sheet in the main hoop bracket 3 and the secondary hoop bracket 2.
As seen, mounting base has used triangle to stablize stressed principle, in the mounting base locking hole of mounting base both sides, be welded and fixed the mounting base locking nut, reduced at the aerial movable part of height, prevent high-altitude part accidental falling, it is simpler, faster, safer to make lifting high-altitude article reduce as much as possible to reach the high-altitude installation exercise.Main hoop bracket has adopted up and down multilayer anchor ear design, makes very firm of integral support load-bearing, and has increased the contact area between hoop bracket and the steel tube tower, can make hoop bracket to the sufficient Uniform Dispersion of the power of steel tube tower contact portion.Secondary hoop bracket adopts the structure structure identical with main hoop bracket to be fixedly connected with convenient disassembly by nut with main hoop bracket.
Claims (4)
1. hoop bracket that is used for installing on the steel tube tower in electric transmission line video monitoring system, it is characterized in that: comprise mounting base, main hoop bracket, secondary hoop bracket, described mounting base, secondary hoop bracket all are fixedly connected with main hoop bracket by bolt, nut; Described main hoop bracket, secondary hoop bracket have identical structure, wherein: described main hoop bracket comprises the arc anchor ear sheet of n layer parallel arrangement, the two ends of every one deck arc anchor ear sheet all are welded with a square steel disc, and it is the natural number greater than 2 that circular punching, n are arranged on the square steel disc; In the main hoop bracket in every layer of arc anchor ear sheet and the secondary hoop bracket arc anchor ear sheet of respective layer on the same level face.
2. a kind of hoop bracket for video monitoring system is installed on the steel tube tower in electric transmission line according to claim 1, it is characterized in that: described mounting base comprises two opening support frames that structure is identical, and an outside framework; Wherein:
The opening of described two opening support frames is towards the lateral wall of main hoop bracket, and is fixedly welded on symmetrically respectively on the lateral wall of main hoop bracket; Described outside framework is fitted on two opening support frame outer walls, is provided with the circular punching of installing for fixture in the joint place of outside framework and two opening support frames.
3. a kind of hoop bracket for video monitoring system is installed on the steel tube tower in electric transmission line according to claim 2, it is characterized in that: described two opening support frames are the right angle U-shaped, and the two ends of outside framework fit together with the base, right angle of described two opening support frames respectively.
4. a kind of hoop bracket for video monitoring system is installed on the steel tube tower in electric transmission line according to claim 2, it is characterized in that: the weld of an end of described two opening support frames and the lateral wall of main hoop bracket is connected to each other.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220306423 CN202706637U (en) | 2012-06-28 | 2012-06-28 | Video monitoring system mounting hold-hoop support for steel tube tower in electric transmission line |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220306423 CN202706637U (en) | 2012-06-28 | 2012-06-28 | Video monitoring system mounting hold-hoop support for steel tube tower in electric transmission line |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202706637U true CN202706637U (en) | 2013-01-30 |
Family
ID=47586952
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220306423 Expired - Fee Related CN202706637U (en) | 2012-06-28 | 2012-06-28 | Video monitoring system mounting hold-hoop support for steel tube tower in electric transmission line |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202706637U (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104316666A (en) * | 2014-11-06 | 2015-01-28 | 中国水产科学研究院渔业机械仪器研究所 | Water quality monitoring buoy sensor mounting clamp |
CN106049957A (en) * | 2015-04-07 | 2016-10-26 | 斯坦陵布什大学 | Frame supported height adjustable pylon |
CN107366816A (en) * | 2017-09-14 | 2017-11-21 | 建浩支架(昆山)有限公司 | Free splicing display suspension bracket |
CN107394698A (en) * | 2017-08-04 | 2017-11-24 | 北京航空航天大学 | Cable shade assembly and rocket |
CN108523703A (en) * | 2017-03-03 | 2018-09-14 | 广东美的生活电器制造有限公司 | Cooking machine |
CN108682103A (en) * | 2018-07-16 | 2018-10-19 | 海南电网有限责任公司海口供电局 | The system and its monitoring method of packaged type preventing damage to power transmission line caused by external force |
CN114016806A (en) * | 2021-11-11 | 2022-02-08 | 中国铁塔股份有限公司 | Chain type reinforcing method for rod/tower |
-
2012
- 2012-06-28 CN CN 201220306423 patent/CN202706637U/en not_active Expired - Fee Related
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104316666A (en) * | 2014-11-06 | 2015-01-28 | 中国水产科学研究院渔业机械仪器研究所 | Water quality monitoring buoy sensor mounting clamp |
CN106049957A (en) * | 2015-04-07 | 2016-10-26 | 斯坦陵布什大学 | Frame supported height adjustable pylon |
CN108523703A (en) * | 2017-03-03 | 2018-09-14 | 广东美的生活电器制造有限公司 | Cooking machine |
CN107394698A (en) * | 2017-08-04 | 2017-11-24 | 北京航空航天大学 | Cable shade assembly and rocket |
CN107394698B (en) * | 2017-08-04 | 2019-01-11 | 北京航空航天大学 | Cable shade assembly and rocket |
CN107366816A (en) * | 2017-09-14 | 2017-11-21 | 建浩支架(昆山)有限公司 | Free splicing display suspension bracket |
CN108682103A (en) * | 2018-07-16 | 2018-10-19 | 海南电网有限责任公司海口供电局 | The system and its monitoring method of packaged type preventing damage to power transmission line caused by external force |
CN114016806A (en) * | 2021-11-11 | 2022-02-08 | 中国铁塔股份有限公司 | Chain type reinforcing method for rod/tower |
CN114016806B (en) * | 2021-11-11 | 2023-08-15 | 中国铁塔股份有限公司 | Chain type reinforcing method for pole/tower |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202706637U (en) | Video monitoring system mounting hold-hoop support for steel tube tower in electric transmission line | |
TW201911735A (en) | Three-in-one coupling insertion-pull type water surface photovoltaic power generation unit and power generation system thereof | |
CN203160795U (en) | Pitch point of tower leg of steel tube tower and capable of preventing local yielding | |
CN201975787U (en) | +/-800 kV convertor station direct-current filter suspension mounting structure | |
CN205046911U (en) | Triangle -shaped section steel pylons | |
CN203568690U (en) | Track connecting structure capable of bearing complex load | |
CN206608283U (en) | A kind of pylon for wind-power electricity generation | |
CN202081689U (en) | Alternating-current ultrahigh voltage single-tower dual-loop terminal tower | |
CN212412591U (en) | Join in marriage and become JP cabinet fast-assembling maintenance platform | |
CN202081693U (en) | Straight steel pipe rod of extra-high voltage DC grounding electrode line | |
CN203367853U (en) | Leaning tower structure for high voltage capacitor device | |
CN202090662U (en) | Alternating current extra-high voltage same-tower and dual-loop strain tower | |
CN103398229B (en) | Nuclear power station nuclear island high anti-seismic belt pallet with holes | |
CN204435986U (en) | A kind of steel tube tower node | |
CN207348571U (en) | Multistage linking pylon | |
CN219431495U (en) | High-voltage iron tower safety monitoring station mounting frame | |
CN207717676U (en) | A kind of novel insulator filth collector | |
CN202121229U (en) | Column cap of bracket for electrical equipment | |
CN202441098U (en) | Ladder and pull rope type steel tube tower | |
CN201588414U (en) | Supporting structure for framework scaffolds | |
CN206942288U (en) | A kind of electric power tower | |
CN201489948U (en) | Installation and fixation structure for transformer | |
CN204947527U (en) | A kind of iron tower of power transmission line cable bearer | |
CN204001817U (en) | Combined support frame | |
CN205316651U (en) | Outer quick -witted suspension support structure of firm air conditioner |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130130 Termination date: 20190628 |
|