CN202706042U - 改进型快构围堤 - Google Patents

改进型快构围堤 Download PDF

Info

Publication number
CN202706042U
CN202706042U CN 201220201102 CN201220201102U CN202706042U CN 202706042 U CN202706042 U CN 202706042U CN 201220201102 CN201220201102 CN 201220201102 CN 201220201102 U CN201220201102 U CN 201220201102U CN 202706042 U CN202706042 U CN 202706042U
Authority
CN
China
Prior art keywords
causeway
slope
levee
construction
outside
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220201102
Other languages
English (en)
Inventor
吕敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI HYDRAULIC ENGINEERING GROUP Co Ltd
Original Assignee
SHANGHAI HYDRAULIC ENGINEERING GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI HYDRAULIC ENGINEERING GROUP Co Ltd filed Critical SHANGHAI HYDRAULIC ENGINEERING GROUP Co Ltd
Priority to CN 201220201102 priority Critical patent/CN202706042U/zh
Application granted granted Critical
Publication of CN202706042U publication Critical patent/CN202706042U/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

改进型快构围堤,密排联体通长袋(2)层上方再逐层叠码吹填砂袋外棱体(6),在逐层升高的同时构成断面呈梯形的堤体,堤体顶部加固构成堤顶(9),在该堤体向外一侧坡面、坡底覆压土工布与袋装碎石反滤层(4)和护脚抛石(3),并在该外侧坡面表面安装预制栅栏板(7)和预制砼空心板(8),同时,在该堤体内侧坡面前方逐层堆码吹填砂袋内棱体(13),其中,内棱体(13)低于外棱体(6)。通过设置紧固安装结构,构件以安装单元理念预备制成,按照涉及联结关系,现场高效快速构筑,制造构建周期短,结构牢固,维护、拆除便捷,主要构件可以重复利用,防渗、防波性能显著提高,工作时状态稳定,性能可靠耐用。

Description

改进型快构围堤
技术领域
本实用新型涉及水利工程中的围堤技术领域,尤其是改进型快构围堤。 
背景技术
目前,围堰筑堤工程工期长,包含筑堤砂在内的材料需求量大,材料进场难度大,筑堤砂、石料运输受横沙东滩一、二、四期促於堤的影响,无法直接由大吨位船只运输等原因,为材料运输组织、运输设备的选择造成一定的难度,与多数同类工程相比,低滩围垦工程较厚的淤泥层加大了筑堤施工难度,若加载控制不当,易造成施工期失稳现象,另一方面,围堤工程造地进度要求紧,而通用技术中以现场逐一构件施工作业为主,施工强度高,工期长,构件一次性应用,建造和维护成本较高,同时,部分工程堤基范围主要为粉砂土质,地基的抗冲刷能力极差,在波浪、水流作用下极易起动、导致冲刷,出现冲刷沟、冲刷坑,因此,如何在相对较短的工期内完成堤体分级加载是工程的难点。 
发明内容
本实用新型的发明目的在于提供一种改进型快构围堤。 
实现本实用新型的发明目的措施在于:密排联体通长袋层上方再逐层叠码吹填砂袋,在逐层升高的同时构成断面呈梯形的外棱体,堤体顶部加固构成堤顶,在该堤体向外一侧坡面、坡底覆压土工布与袋装碎石反滤层,坡底设置护脚抛石,并在该外侧坡面表面安装预制栅栏板和预制砼空心板,同时,在该堤体内侧坡面前方逐层堆码吹填砂袋构成内棱体,其中,内棱体低于外 棱体。 
本实用新型的优点在于,通过设置紧固安装结构,构件以安装单元理念预备制成,按照涉及联结关系,现场高效快速构筑,制造构建周期短,结构牢固,维护、拆除便捷,主要构件可以重复利用,防渗、防波性能显著提高,工作时状态稳定,性能可靠耐用。 
附图说明
图1是本实用新型的断面结构示意图 
图2是本实用新型的立体效果结构示意图 
附图标记包括: 
滩面1,联体通长袋2,护脚抛石3,土工布与袋装碎石反滤层4,埋石砼镇脚5,吹填砂袋外棱体6,预制栅栏板7,预制砼空心板8,堤顶9,内护坡10,子堰11,青坎12,内棱体13。 
具体实施方式
密排联体通长袋2层上方再逐层叠码吹填砂袋外棱体6,在逐层升高的同时构成断面呈梯形的堤体,堤体顶部加固构成堤顶9,在该堤体向外一侧坡面、坡底覆压土工布与袋装碎石反滤层4,坡底设置护脚抛石3,并在该外侧坡面表面安装预制栅栏板7和预制砼空心板8,同时,在该堤体内侧坡面前方逐层堆码吹填砂袋内棱体13,其中,内棱体13低于外棱体。 
前述中,在内棱体13和外棱体6间吹填堤芯砂土至青坎12高程,青坎12以上沿内坡面线逐层吹填砂袋子堰11和堤芯砂土形成上部堤身,在其形成的内坡面上固定内护坡10。 
前述堤体底部联体通长袋2铺排于滩面1上。 
土工布与袋装碎石反滤层4和护脚抛石3共同构成护脚结构。抛石备料堆码在围堤外侧。反滤土工布4为机织布,230g/m2。 
埋石砼镇脚5呈1000mm×800mm。 
吹填砂袋外棱体6顶高程5.00m,顶宽4.0m,外坡坡比1∶3,内坡坡比1∶1,施工管袋采用鸳鸯袋,外部迎浪侧≥2.5m范围内采用200g/m2防老化机织布,内部管袋采用175g/m2防老化编织布。充填砂袋内棱体顶高程3.50m,顶宽3.0m,外坡坡比1∶2.5,内坡坡比1∶1,内坡压坡子堰宽度为2.0m,内棱体和子堰管袋均采用150g/m2防老化编织布。上下相邻两层吹填砂袋外沿伸出错开部位以袋装砂找平。 
堤顶9位于围堤中心线上,堤顶高程6.9m。 
作为一个实施例,在堤体外侧坡较长,或需要强化防护的情况下,在堤顶(9)和埋石砼镇脚(5)间外棱体(6)土方坡面整理后及时铺设土工布与袋装碎石反滤层(4),并及时安装上部预制栅栏板(7)和预制砼空心板(8);另外,堤顶(9)由外侧浆砌块石挡墙、内侧路肩和路面组成,路面结构为碎石垫层、粉煤灰三渣基层并以沥青砼筑面,外侧浆砌块石挡墙作为防浪墙,墙顶高程7.9m-8.1m,墙高1.0m-1.1m;路面向内侧形成2%的泻水坡度,内侧路肩筑素砼。。 
内护坡10为彩砖拱圈草皮护坡。内护坡底筑素砼排水沟,沟通坡脚排水沟与青坎内侧。 
子堰11由吹填砂袋构筑。 
内棱体13外露部分以土工模袋护坡,在内棱体13与子堰11间平台为青坎12。青坎12宽度为8-18m,青坎12顶面高程为4.00m-3.50m,向内呈泻水坡度,吹填坡面找平后,铺覆0.20m厚粘土,表面播散草籽植草; 
本实用新型中,根据施工现场的实际情况筑堤砂采用吹砂船加接力的方式吹砂至大堤,块石采用平底船短驳的方式进行运送。 
本实用新型中,库区堤基范围为淤积的土层,淤泥厚度平均2.0-6.0。构件分级加载,每级加载合理划分多个工作面平行施工,方便在加载间歇期做好后序施工的准备工作,各工序衔接紧密, 
本实用新型中,为防止出现冲刷沟,在施工准备阶段,将首先并及时地做好滩面1的铺排和联体通长袋2的铺设。 
在以上实施例中,未及叙述的涉及实施的其他必要技术等采用现有技术,不再依次列举详述。 

Claims (4)

1.改进型快构围堤,其特征是:密排联体通长袋(2)层上方再逐层叠码吹填砂袋外棱体(6),在逐层升高的同时构成断面呈梯形的堤体,堤体顶部加固构成堤顶(9),在该堤体向外一侧坡面、坡底覆压土工布与袋装碎石反滤层(4)和护脚抛石(3),并在该外侧坡面表面安装预制栅栏板(7)和预制砼空心板(8),同时,在该堤体内侧坡面前方逐层堆码吹填砂袋内棱体(13),其中,内棱体(13)低于外棱体(6)。
2.如权利要求1所述的改进型快构围堤,其特征在于,在内棱体(13)和外棱体(6)间吹填堤芯砂土至青坎(12)高程,青坎(12)以上沿内坡面线逐层吹填砂袋子堰(11)和堤芯砂土形成上部堤身,在其形成的内坡面上固定内护坡(10)。
3.如权利要求1所述的改进型快构围堤,其特征在于,土工布与袋装碎石反滤层(4)和护脚抛石(3)共同构成护脚结构。
4.如权利要求1所述的改进型快构围堤,其特征在于,在堤体外侧坡较长,或需要强化防护的情况下,在堤顶(9)和埋石砼镇脚(5)间外棱体(6)土方坡面整理后及时铺设土工布与袋装碎石反滤层(4),并及时安装上部预制栅栏板(7)和预制砼空心板(8);另外,堤顶(9)由外侧浆砌块石挡墙、内侧路肩和路面组成,路面结构为碎石垫层、粉煤灰三渣基层并以沥青砼筑面,外侧浆砌块石挡墙作为防浪墙,墙顶高程7.9m-8.1m,墙高1.0m-1.1m;路面向内侧形成2%的泻水坡度,内侧路肩筑素砼。 
CN 201220201102 2012-05-08 2012-05-08 改进型快构围堤 Expired - Lifetime CN202706042U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220201102 CN202706042U (zh) 2012-05-08 2012-05-08 改进型快构围堤

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220201102 CN202706042U (zh) 2012-05-08 2012-05-08 改进型快构围堤

Publications (1)

Publication Number Publication Date
CN202706042U true CN202706042U (zh) 2013-01-30

Family

ID=47586360

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220201102 Expired - Lifetime CN202706042U (zh) 2012-05-08 2012-05-08 改进型快构围堤

Country Status (1)

Country Link
CN (1) CN202706042U (zh)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104831684A (zh) * 2015-03-26 2015-08-12 成都格瑞思文化传播有限公司 一种易于通行的护堤
CN105064291A (zh) * 2015-08-18 2015-11-18 水利部交通运输部国家能源局南京水利科学研究院 水库清淤防沙的梯级挡沙坝生态系统
CN105604075A (zh) * 2016-03-04 2016-05-25 中铁隧道集团二处有限公司 便于恢复的临时坞口围堰施工方法及围堰结构
CN105908764A (zh) * 2016-06-02 2016-08-31 中铁隧道集团二处有限公司 塑性混凝土防渗墙和钢筋混凝土挡墙相结合的防渗系统
CN108316236A (zh) * 2017-01-16 2018-07-24 中交上海航道勘察设计研究院有限公司 一种围垦工程中适用于大潮差的堤坝及其多龙口合龙方法
CN109322279A (zh) * 2018-10-09 2019-02-12 连云港金海岸开发建设有限公司 海相软土和工业废渣资源化利用的海堤结构及其施工方法
CN110012855A (zh) * 2019-01-18 2019-07-16 上海海洋大学 一种高沙土地区池塘养殖成蟹的方法
CN111622179A (zh) * 2020-05-28 2020-09-04 上海市水利工程设计研究院有限公司 一种海堤生态改造的栅栏板护坡结构及其施工方法
CN115561433A (zh) * 2022-11-10 2023-01-03 四川省公路规划勘察设计研究院有限公司 降雨作用下土质陡坡开裂试验装置及其边界构造方法

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104831684A (zh) * 2015-03-26 2015-08-12 成都格瑞思文化传播有限公司 一种易于通行的护堤
CN105064291A (zh) * 2015-08-18 2015-11-18 水利部交通运输部国家能源局南京水利科学研究院 水库清淤防沙的梯级挡沙坝生态系统
CN105604075A (zh) * 2016-03-04 2016-05-25 中铁隧道集团二处有限公司 便于恢复的临时坞口围堰施工方法及围堰结构
CN105908764A (zh) * 2016-06-02 2016-08-31 中铁隧道集团二处有限公司 塑性混凝土防渗墙和钢筋混凝土挡墙相结合的防渗系统
CN105908764B (zh) * 2016-06-02 2017-12-26 中铁隧道集团二处有限公司 塑性混凝土防渗墙和钢筋混凝土挡墙相结合的防渗系统
CN108316236B (zh) * 2017-01-16 2024-01-26 中交上海航道勘察设计研究院有限公司 一种围垦工程中适用于大潮差的堤坝及其多龙口合龙方法
CN108316236A (zh) * 2017-01-16 2018-07-24 中交上海航道勘察设计研究院有限公司 一种围垦工程中适用于大潮差的堤坝及其多龙口合龙方法
CN109322279A (zh) * 2018-10-09 2019-02-12 连云港金海岸开发建设有限公司 海相软土和工业废渣资源化利用的海堤结构及其施工方法
CN109322279B (zh) * 2018-10-09 2020-08-25 连云港金海岸开发建设有限公司 海相软土和工业废渣资源化利用的海堤结构及其施工方法
CN110012855A (zh) * 2019-01-18 2019-07-16 上海海洋大学 一种高沙土地区池塘养殖成蟹的方法
CN111622179A (zh) * 2020-05-28 2020-09-04 上海市水利工程设计研究院有限公司 一种海堤生态改造的栅栏板护坡结构及其施工方法
CN115561433A (zh) * 2022-11-10 2023-01-03 四川省公路规划勘察设计研究院有限公司 降雨作用下土质陡坡开裂试验装置及其边界构造方法
CN115561433B (zh) * 2022-11-10 2023-03-07 四川省公路规划勘察设计研究院有限公司 降雨作用下土质陡坡开裂试验装置及其边界构造方法

Similar Documents

Publication Publication Date Title
CN202706042U (zh) 改进型快构围堤
CN203603105U (zh) 一种壁板式生态挡墙护岸结构
JP5052872B2 (ja) 擁壁の構築方法
CN202559376U (zh) 一种高架桥下临河市政道路结构
KR100902327B1 (ko) 지오튜브를 이용한 제방축조 및 매립공법
CN109629585A (zh) 软弱覆盖层下新型围堰结构及施工方法
CN210315102U (zh) 复合式生态装饰面板护坡加筋路基结构
CN101806226A (zh) 一种采空区堤坝式充填方法
CN209816885U (zh) 软弱覆盖层下新型围堰结构
RU2366782C1 (ru) Способ возведения насыпного сооружения типа дамбы с эксплуатационной дорогой на слабых грунтах
CN111335100A (zh) 适用于沿海地区的堤路结构及其施工方法
CN109750571A (zh) 一种道路塌方应急与永久支挡一体化结构及施工方法
CN210238174U (zh) 旧路改造深层病害复合式微型桩加固结构
CN213805481U (zh) 一种格宾挡土墙
CN213805480U (zh) 一种格宾挡土墙
CN102575462A (zh) 具有树脂制层叠构造物的地下构造物
JP4827165B2 (ja) 長尺土嚢ドレーン補強工法
KR20110046209A (ko) 교량 교각기초 보강 및 세굴방지 시공 방법 및 그 구조물
CN209854656U (zh) 一种堤防
CN108867614B (zh) 一种在泥石流软基上铺垫道路的施工方法
CN102561368B (zh) 一种预压实加筋土块柔性支护结构
CN103898824B (zh) 高寒冻土地区路基用塑料排水板处理基底的方法
CN110219248B (zh) 抗倾覆简易便桥桥墩施工方法及抗倾覆简易便桥施工方法
CN112411619A (zh) 一种格宾挡土墙及其施工方法
CN112458811A (zh) 一种路基加宽结构及路基加宽方法

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20130130