CN202689189U - Connecting member for construction secondary beam - Google Patents
Connecting member for construction secondary beam Download PDFInfo
- Publication number
- CN202689189U CN202689189U CN 201220289780 CN201220289780U CN202689189U CN 202689189 U CN202689189 U CN 202689189U CN 201220289780 CN201220289780 CN 201220289780 CN 201220289780 U CN201220289780 U CN 201220289780U CN 202689189 U CN202689189 U CN 202689189U
- Authority
- CN
- China
- Prior art keywords
- secondary beam
- steel plate
- construction
- connecting member
- construction secondary
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model discloses a connecting member for a construction secondary beam. The connecting member for the construction secondary beam comprises a construction secondary beam provided with an edge check plate connected with the construction secondary beam in fastened mode, a steel plate is arranged beside the edge check plate, the steel plate is connected with the construction secondary beam in fastened mode through high-strength welding studs, and a concrete building surface is poured between the steel plate and the edge check plate. The connecting member for the construction secondary beam is simple in structure, strong in stability, low in level of construction difficulty, and beneficial to promotion and application.
Description
Technical field
The utility model relates to fixed mechanism, particularly a kind of building secondary beam fixing mechanism simple in structure.
Background technology
The building secondary beam mainly works to transmit load on the top of girder.In the junction of girder and secondary beam, girder can be regarded as the bearing (fixed bearing) of secondary beam.As long as the reinforcing bar of building secondary beam stretches into the requirement that the length of girder satisfies anchorage length.The anchorage length of reinforcing bar and the span of beam are irrelevant, and be only relevant with diameter and the profile of the tension design strength of reinforcing bar, concrete tension design strength and reinforcing bar.The fixed mechanism of existing building secondary beam technology, complex structure, steadiness is poor.
The utility model content
For the problems referred to above, the utility model aims to provide a kind of simple in structure, building secondary beam connecting elements that steadiness is strong.
For realizing this technical purpose, scheme of the present utility model is: a kind of building secondary beam connecting elements, comprise the building secondary beam, be equiped with edge guard on this building secondary beam, described edge guard and described building secondary beam are fastenedly connected, described edge guard next door is equiped with steel plate, and described steel plate is fastenedly connected with described building secondary beam by high strength weldering nail, is cast with the concrete flooring between described steel plate and edge guard.
The building secondary beam connecting elements that the utility model provides, simple in structure, steadiness is strong, and difficulty of construction is little, is beneficial to promote the use.
Description of drawings
Fig. 1 is structural representation of the present utility model.
The specific embodiment
Below in conjunction with the drawings and specific embodiments the utility model is described in further details.
As shown in Figure 1, a kind of building secondary beam connecting elements of the utility model embodiment, it comprises building secondary beam 1, be equiped with edge guard 3 on the described building secondary beam, described edge guard 3 is fastenedly connected with described building secondary beam 1, described edge guard 3 next doors are equiped with steel plate 2, and described steel plate 2 is fastenedly connected with described building secondary beam 1 by high strength weldering nail 5, and 3 of described steel plate 2 and edge guard are cast with concrete building 4.This connecting elements, simple in structure, steadiness is strong, and difficulty of construction is little, is beneficial to promote the use.
The above; it only is preferred embodiment of the present utility model; not in order to limiting the utility model, any trickle modification that every foundation technical spirit of the present utility model is done above embodiment, be equal to and replace and improve, all should be included within the protection domain of technical solutions of the utility model.
Claims (1)
1. build the secondary beam connecting elements for one kind, comprise the building secondary beam, be equiped with edge guard on this building secondary beam, described edge guard and described building secondary beam are fastenedly connected, it is characterized in that: described edge guard next door is equiped with steel plate, described steel plate is fastenedly connected with described building secondary beam by high strength weldering nail, is cast with the concrete flooring between described steel plate and edge guard.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220289780 CN202689189U (en) | 2012-06-19 | 2012-06-19 | Connecting member for construction secondary beam |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220289780 CN202689189U (en) | 2012-06-19 | 2012-06-19 | Connecting member for construction secondary beam |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202689189U true CN202689189U (en) | 2013-01-23 |
Family
ID=47544826
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220289780 Expired - Fee Related CN202689189U (en) | 2012-06-19 | 2012-06-19 | Connecting member for construction secondary beam |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202689189U (en) |
-
2012
- 2012-06-19 CN CN 201220289780 patent/CN202689189U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103388408B (en) | A kind of building structure external prestressing muscle reinforces steering block | |
CN201826519U (en) | Building template | |
CN203626080U (en) | Self-resetting shear wall with replaceable coupling beam | |
CN204491830U (en) | Can restore funcitons frame-brace structure system | |
CN203321054U (en) | Tower of wind turbine generator | |
CN204491825U (en) | Can restore funcitons Aseismic Structure System | |
CN204491828U (en) | Can restore funcitons frame structure system | |
CN202689189U (en) | Connecting member for construction secondary beam | |
CN205259361U (en) | Connected node of reinforced concrete column and light -duty girder steel | |
CN203200657U (en) | Composite bridge deck slab with FRP component provided with ribs and concrete | |
CN102535650A (en) | Device for connecting composite wallboard and floor slab | |
CN202627543U (en) | Frame beam main reinforcement fixing device | |
CN202284359U (en) | Steel structure concrete support beam | |
CN204212791U (en) | Driving face Novel front canopy hoisting ring device | |
CN202492930U (en) | Connecting device of composite wallboards and floorslabs | |
CN203066351U (en) | Reinforcement structure of steel-encased-concrete composite beam | |
CN202380645U (en) | Steel bar anchoring component with reinforced concrete structure | |
CN201666004U (en) | Reinforcing body connected by using anchor bolts | |
CN204491827U (en) | Can restore funcitons new structural systen | |
CN201943218U (en) | Anchoring structure of steel bar of shear wall in profile steel concrete column | |
CN201762989U (en) | Steel and wood combined type sub keel | |
CN205035927U (en) | Power consumption enhancement mode assembled precast shear wall | |
CN204186124U (en) | The small-sized upright triangle tower of roofing | |
CN202830963U (en) | Wind-resisting column and foundation connecting mechanism | |
CN202370248U (en) | Support structure for high cavity capping construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130123 Termination date: 20140619 |
|
EXPY | Termination of patent right or utility model |