CN202688279U - Integrated gasification furnace - Google Patents
Integrated gasification furnace Download PDFInfo
- Publication number
- CN202688279U CN202688279U CN2012201491948U CN201220149194U CN202688279U CN 202688279 U CN202688279 U CN 202688279U CN 2012201491948 U CN2012201491948 U CN 2012201491948U CN 201220149194 U CN201220149194 U CN 201220149194U CN 202688279 U CN202688279 U CN 202688279U
- Authority
- CN
- China
- Prior art keywords
- pot
- pipe
- gasification furnace
- vapourizing furnace
- water
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P20/00—Technologies relating to chemical industry
- Y02P20/10—Process efficiency
Landscapes
- Solid-Fuel Combustion (AREA)
Abstract
The utility model relates to the field of furnaces, in particular to an integrated gasification furnace which comprises a gasification furnace 26 and a pot 24. In the gasification furnace 26, a gasification furnace water-cooling wall pipe 14 is connected with a gasification furnace upper annular collecting box 10 and a gasification furnace lower annular collecting box 19 to form a pipe support structure of the pipe and the annular collecting boxes. A total air inlet pipe 17 is respectively connected with an upper air ring 13, a lower air ring 16 and an air inlet 22 under the furnace. A rotating furnace bar 20 welded above an ash tray 21 is arranged in a hearth 29, and the pot 24 arranged on the gasification furnace 26 is vertically connected with a boiler barrel 30 and an annular collecting box 8 under the pot through a pot water-cooling wall pipe 5 and a pot convection pipe bundle 6. A gasification furnace body which is formed by rolling and welding steel plates is replaced, the gasification furnace water-cooling wall pipe 14 is connected with the gasification furnace upper annular collecting box 10 and the gasification furnace lower annular collecting box 19 to form the pipe support structure of the pipe and the annular collecting boxes, the cost is reduced, and the integrated gasification furnace which can not only burn coal, but also burn other biomass fuel is simple to operate, convenient to maintain and high in thermal efficiency, and reduces cost.
Description
Technical field
The utility model relates to field of boilers, is a kind of integral gasifier.
Background technology
Existing vapourizing furnace is as main take fire coal, the coal combustion release of heat, the vapourizing furnace body rolls the water jacket that is welded by steel plate, water in the water jacket absorbs the heat of coal combustion release and produces water vapor, water molecules in the water vapor is sent into furnace bottom by pipeline again, with the main component carbon of coal, add by a certain percentage in addition air, generate coal gas with airborne major ingredient oxygen reaction.Because water leg structure must adopt doughnut-shaped steel plate, cost is high, and bearing capacity is low, so existing vapourizing furnace is all worked under low-pressure state, steam quality is low, and the output gas quality is low.
Summary of the invention
The shortcoming that exists for solving existing vapourizing furnace, thereby the utility model is saved cost with the pipe frame structure that water jacket makes annular header and pipe into, improve bearing capacity, improve combustion gas quality, the integral gasifier of the fuel such as other biomass that not only can coal combustion can also burn.
The purpose of this utility model is realized by following technical scheme: a kind of integral gasifier, it comprises vapourizing furnace 26 and pot 24 two portions, wherein vapourizing furnace 26 is by gasifier water-cooling wall pipe 14, connect on the vapourizing furnace, lower annular header 10,19, the pipe frame structure of looping header and pipe, vapourizing furnace water outlet base 11 is set on the annular header 10 on the vapourizing furnace, vapourizing furnace water inlet pipe 18 is set on the annular header 19 under the vapourizing furnace, vapourizing furnace blowdown base 27, coal filling hole 28 is set on the body of heater, total blast pipe 17 connects respectively solar or lunar halo 13, upcast ventilation pipe 12, lower solar or lunar halo 16, blast inlet 22 under lower air conduit 15 and the stove, the burner hearth 29 interior rotating grates 20 that arrange, rotating grate 20 is welded on the ash-pan 21; The pot 24 that arranges on the vapourizing furnace 26 is by pot water wall tube 5 and pot convection bank 6, connect up and down drum 30, the lower annular header 8 of pot, on the lower annular header 8 of pot pot water inlet pipe 9, pot blow-off pipe 7 are set, pot water lever mark rest 3, pot blowdown base 4, steam outlet pipe 2, pot safety valve base 1, pot tensimeter base 23 are set on the drum 30.
The utility model is rational in infrastructure, the vapourizing furnace body rolled to be welded by steel plate make gasifier water-cooling wall pipe 14 into, connect the upper and lower annular header 10 of vapourizing furnace, 19, the pipe frame structure of looping header and pipe, saved widely manufacturing firm and user's cost, improve bearing capacity and steam quality, the inflammable gas quality that produces improves, not only can coal combustion can also the burn integral gasifier of the fuel such as other biomass, it is simple to operate, cost, easy to maintenance, thermo-efficiency is high.
Description of drawings
Fig. 1 is the utility model cross-sectional schematic;
Fig. 2 is that the external structure synoptic diagram is looked on the utility model left side.
Embodiment
The below utilizes drawings and Examples that the utility model is further described.
With reference to Fig. 1-2, a kind of integral gasifier, it comprises vapourizing furnace 26 and pot 24 two portions, wherein vapourizing furnace 26 is by gasifier water-cooling wall pipe 14, connect on the vapourizing furnace, lower annular header 10,19, the pipe frame structure of looping header and pipe, vapourizing furnace water outlet base 11 is set on the annular header 10 on the vapourizing furnace, vapourizing furnace water inlet pipe 18 is set on the annular header 19 under the vapourizing furnace, vapourizing furnace blowdown base 27, coal filling hole 28 is set on the body of heater, and total blast pipe 17 connects respectively solar or lunar halo 13, upcast ventilation pipe 12, lower solar or lunar halo 16, blast inlet 22 under lower air conduit 15 and the stove, the burner hearth 29 interior rotating grates 20 that arrange, rotating grate 20 is welded on the ash-pan 21; The pot 24 that arranges on the vapourizing furnace 26 is by pot water wall tube 5 and pot convection bank 6, connect up and down drum 30, the lower annular header 8 of pot, on the lower annular header 8 of pot pot water inlet pipe 9, pot blow-off pipe 7 are set, pot water lever mark rest 3, pot blowdown base 4, steam outlet pipe 2, pot safety valve base 1, pot tensimeter base 23 are set on the drum 30.
Its principle of work is: water enters annular header 19 under the vapourizing furnace by vapourizing furnace water inlet pipe 18, water is heated along gasifier water-cooling wall pipe 14 absorption burner hearths 29 heats and rises to annular header 10 on the vapourizing furnace, hot water continues to draw along vapourizing furnace water outlet base 11, introduced in the lower annular header 8 of pot by pot water inlet pipe 9, if want the high steam of pressure, water should be drawn from vapourizing furnace water outlet base 11 rear by after the hot water pump pressurization, enter again a pot lower annular header 8, hot water continues to rise after pot water wall tube 5 and pot convection bank 6 heat absorptions, part water becomes steam and enters drum 30, in continuous endothermic process, water becomes steam and reaches rated pressure from steam outlet pipe 2 discharges.A part is delivered to the hot system that uses, and sub-fraction input rotating grate 20 times is used for vapourizing furnace 26 gas making.Pot water lever mark rest 3 is set on the drum 30, thereby can observes the moisturizing of water level control water pump, pot blowdown base 4 is for dirt, the body refuse got rid of in the drum 30, and pot safety valve base 1, pot tensimeter base 23 are used for controlling, observe pot 24 interior vapor pressures.
Wind enters respectively blast inlet 22 under the stove from total blast pipe 17, passes ash-pan 21 and is blown into rotating grate 20; Secondary air enters lower air conduit 15 by lower solar or lunar halo 16 and enters burner hearth 29 again; Tertiary air enters upcast ventilation pipe 12 by upper solar or lunar halo 13 and enters burner hearth 29 tops again, water molecules in airborne like this oxygen, the water vapor and the carbon in the fuel are in burner hearth 29, utilize pyrolysis gasification method so that the Controlled burning under anoxic condition of these fuel, redox reaction occurs, produce the inflammable gass such as carbon monoxide, hydrogen, methane, finish energy by solid-state conversion to gaseous state, again by gas secondary combustion releases heat, so because finally be that the gaseous combustion heat release can meet the requirement of environmental protection.
Claims (1)
1. integral gasifier, it comprises vapourizing furnace (26) and pot (24) two portions, it is characterized in that vapourizing furnace (26) is by gasifier water-cooling wall pipe (14), connect on the vapourizing furnace, lower annular header (10,19), the pipe frame structure of looping header and pipe, vapourizing furnace water outlet base (11) is set on the annular header on the vapourizing furnace (10), vapourizing furnace water inlet pipe (18) is set on the annular header under the vapourizing furnace (19), vapourizing furnace blowdown base (27), coal filling hole (28) is set on the body of heater, total blast pipe (17) connects respectively solar or lunar halo (13), upcast ventilation pipe (12), lower solar or lunar halo (16), blast inlet (22) under lower air conduit (15) and the stove, rotating grate (20) is set in the burner hearth (29), and rotating grate (20) is welded on the ash-pan (21); The upper pot (24) that arranges of vapourizing furnace (26) is by pot water wall tube (5) and pot convection bank (6), connect up and down drum (30), the lower annular header (8) of pot, on the lower annular header (8) of pot a pot water inlet pipe (9), pot blow-off pipe (7) are set, a pot water lever mark rest (3), pot blowdown base (4), steam outlet pipe (2), pot safety valve base (1), pot tensimeter base (23) are set on the drum (30).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012201491948U CN202688279U (en) | 2012-04-11 | 2012-04-11 | Integrated gasification furnace |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012201491948U CN202688279U (en) | 2012-04-11 | 2012-04-11 | Integrated gasification furnace |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202688279U true CN202688279U (en) | 2013-01-23 |
Family
ID=47543926
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012201491948U Expired - Fee Related CN202688279U (en) | 2012-04-11 | 2012-04-11 | Integrated gasification furnace |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202688279U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103836711A (en) * | 2014-03-13 | 2014-06-04 | 河南理工大学 | Biomass semi-gasification heating system |
CN103836712A (en) * | 2014-03-13 | 2014-06-04 | 河南理工大学 | Domestic energy-saving heat supply device |
CN108410514A (en) * | 2018-04-03 | 2018-08-17 | 山西阳煤化工机械(集团)有限公司 | The double headers of gasification furnace fin panel casing |
-
2012
- 2012-04-11 CN CN2012201491948U patent/CN202688279U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103836711A (en) * | 2014-03-13 | 2014-06-04 | 河南理工大学 | Biomass semi-gasification heating system |
CN103836712A (en) * | 2014-03-13 | 2014-06-04 | 河南理工大学 | Domestic energy-saving heat supply device |
CN103836712B (en) * | 2014-03-13 | 2016-04-20 | 河南理工大学 | Domestic energy-saving heating plant |
CN108410514A (en) * | 2018-04-03 | 2018-08-17 | 山西阳煤化工机械(集团)有限公司 | The double headers of gasification furnace fin panel casing |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201246733Y (en) | Angle pipe type biomass direct combustion boiler | |
CN103644562A (en) | Combined type energy-saving biomass fuel boiler | |
CN202688279U (en) | Integrated gasification furnace | |
CN204388074U (en) | A kind of isobaric air compartment being applicable to CFB garbage burning boiler | |
CN103256607A (en) | Compound-type waste incineration boiler | |
CN1987058B (en) | Combustion machine and steam turbine combined circulation system for gas boiler | |
CN103471103A (en) | Furnace for combined combustion of methane of garbage leachate and garbage | |
CN203880691U (en) | Chimney-free multifunctional oil/gas-fired boiler | |
CN206347552U (en) | A kind of support connecting base applied to boiler erection | |
CN207418577U (en) | Heat recovery boiler in a kind of production glass microballoon | |
CN203478310U (en) | Device for preventing grate surface of layer-burning boiler from coking | |
CN102563597A (en) | 300MW co-combustion blast furnace gas boiler and mounting method | |
CN201212729Y (en) | Biomass granular fuel boiler | |
CN205155976U (en) | Novel waste incinerator's preheated air system | |
CN201531869U (en) | Multi-purpose boiler | |
CN203163226U (en) | Blocking-proof hot-water boiler | |
CN201373554Y (en) | New energy gasified no-chimney energy-saving environment-friendly boiler | |
CN102889585A (en) | Environment-friendly energy-saving vertical boiling boiler | |
CN201746519U (en) | Biomass gasification furnace | |
CN103615725B (en) | The energy-conservation direct-combustion furnace of domestic garbage gasification melting | |
CN200961131Y (en) | Integrated gas generator | |
CN104390218A (en) | Constant pressure wind chamber applied to CFB (circulating fluid bed) waste incineration boiler | |
CN2898639Y (en) | Biomass gas-making boiler | |
CN102994150A (en) | Gasifying method and vertical air inlet device of biomass gasifier | |
CN204494800U (en) | Biomass fuel waterpipe type heat exchange vacuum hot water unit |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130123 Termination date: 20130411 |