CN202659157U - Novel three-section flexible driller room bracket - Google Patents
Novel three-section flexible driller room bracket Download PDFInfo
- Publication number
- CN202659157U CN202659157U CN 201220189034 CN201220189034U CN202659157U CN 202659157 U CN202659157 U CN 202659157U CN 201220189034 CN201220189034 CN 201220189034 CN 201220189034 U CN201220189034 U CN 201220189034U CN 202659157 U CN202659157 U CN 202659157U
- Authority
- CN
- China
- Prior art keywords
- stand columns
- novel
- pillar stand
- column
- driller room
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000003028 elevating effect Effects 0.000 claims description 9
- 230000008719 thickening Effects 0.000 claims description 2
- 238000005553 drilling Methods 0.000 abstract description 7
- 239000004576 sand Substances 0.000 abstract 1
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 1
Images
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model discloses a novel three-section flexible driller room bracket, which mainly comprises a lifting mechanism, a bench body, a base and hinge pins, wherein the lifting mechanism is connected with the bench body and the base by the hinge pins. The novel three-section flexible driller room bracket is characterized in that the lifting mechanism adopts a three-section flexible structure; the lifting mechanism consists of upper stand columns, middle sand columns and lower stand columns; the bench body is sheathed on the end parts of the upper stand columns; the end parts of the upper stand columns are sheathed on the middle stand columns; the end parts of the middle stand columns are sheathed on the lower stand columns; and taper-shaped guide devices are arranged on the connection ends of the upper stand columns and the middle stand columns as well as the connection ends of the middle stand columns and the lower stand columns. The novel three-section flexible driller room bracket is mainly used for supporting a driller room, the driller room well drilling operation is stable, and the novel three-section flexible driller room bracket can be used for the integral transportation of the driller room so as to satisfy the requirement of vast majority of users.
Description
Technical field
The utility model relates to the technical field of oil/gas drilling, specifically a kind of can with the driller house whole Transporting novel three the joint telescopic driller house support.
Background technology
Raising along with rig human oriented design degree, users at home and abroad improves synchronously to the truck-mounted drill rig functional performance, on most of rig floor of past easy driller's case now by be equipped with complete and heat-insulating property preferably driller house replace, and the driller house support principal mode of existing support driller house mainly is divided into and revolves lift-type and telescopic two kinds: revolve lift-type driller house support, what elevating mechanism adopted is to revolve lift-type, mainly is comprised of stage body, stage body column, base, base column, column, transportation support etc.If realize integrated transportation, then require driller house support and driller house height to be no more than and shipping height, need like this to reduce stage body column and base column height, increase strut length, but along with the increase of strut length, in order to satisfy the Column stability requirement, need to strengthen the column size, the increasing of column size can't be satisfied with driller house and realize integrated transportation so that the size of column under travel position increases to some extent.The two joint stretching structures that telescopic driller house support lifting mechanism adopts, this support is similar to telescopic base, mainly is comprised of stage body, stage body column, base, base column etc.It is concordant with drilling floor surface that the driller house support height requires, so that its height dimension under travel position specified altitude when being far longer than with the integrated transportation of driller house, so the two-segment type jack column can't transport with the driller house one.
Summary of the invention
The purpose of this utility model provides a kind of novel driller house support, is mainly used to support driller house, guarantees that the driller house drillng operation is stable, and can be used for the driller house whole Transporting, to satisfy users' requirement.
The technical solution of the utility model is: the telescopic driller house support of these novel three joints, mainly comprise: elevating mechanism, stage body, base, bearing pin, described elevating mechanism connects stage body and base, is connected by bearing pin, it is characterized in that: described elevating mechanism adopts the three-section type stretching structure.
Described elevating mechanism is made of upper pillar stand, central post and lower pillar stand, and described stage body is placed in the upper pillar stand end, and the upper pillar stand end is placed on the central post, and the central post end is placed on the lower pillar stand, and the taper guiding device is located at upper pillar stand and central post, central post link.
Described taper guiding connection device adopts the tapered guiding connection mechanism of thickening at column and the overlapping junction of column, is divided into inner column fairlead and outer column fairlead, and the inner column fairlead is fixed, and the outer column fairlead is detachable.
The flexible driller house support of this novel three joints of the utility model provides a kind of desirable flexible department of three joints room to bore support for the technical field of oil/gas drilling, by be equipped with the main parts size such as stage body, upper pillar stand, central post, lower pillar stand, base, taper guiding device, support drilling floor surface linkage, this device can be mainly used to support driller house, guarantee that the driller house drillng operation is stable, and can be used for the driller house whole Transporting, not superelevation.By the application of New-support, originally needed the parts of two cars transportation, as long as a car just can solve, greatly saved cost of transportation.
Description of drawings
Below in conjunction with the drawings and specific embodiments the utility model is further described.
Fig. 1 is structural representation of the present utility model.
Fig. 2 is left diagram of the present utility model.
Fig. 3 is travel position figure of the present utility model.
The specific embodiment
Such as Fig. 1, Fig. 2, shown in Figure 3, bore room support stretching structure and adopt three joint stretching structures, be mainly used in supporting driller house, stage body can be fallen on the base during transportation, can satisfy and the integrated transportation of driller house.It comprises stage body 1, upper pillar stand 2(4), bearing pin 3(12), central post 4(4), lower pillar stand 5(4), base 6, taper guiding device 7(8), support drilling floor surface fastening devices 8(2).Stage body 1 is placed on the upper pillar stand 2, connects by bearing pin 3; Upper pillar stand 2 is placed on the central post 4 and can slides up and down, and connects by bearing pin 3; Central post 4 is placed on the lower pillar stand 5 and can slides up and down, and connects by bearing pin 3; Lower pillar stand 5 one ends are packed on the base 6.In Fig. 1, taper guiding device 7 is arranged at upper pillar stand 2 and central post 4, central post 4 and lower pillar stand 5 links, and upper guiding tapered sleeve is welded in the inner column outside, and lower guide cone is welded in the outer column inboard by bolt.In Fig. 2, support table top fastening devices 8 one ends are welded in stent cover, and an end is welded in drilling floor surface, is bolted.Be this transporting bracket state diagram such as Fig. 3, stage body 1 can be fallen on the base 6, and driller house highly is no more than each column between each column, satisfy the whole Transporting requirement.
Claims (3)
1. one kind novel three is saved telescopic driller house support, mainly comprises: elevating mechanism, stage body, base, bearing pin, described elevating mechanism connects stage body and base, is connected by bearing pin, it is characterized in that: described elevating mechanism adopts the three-section type stretching structure.
2. according to claim 1 novel three save telescopic driller house support, it is characterized in that: described elevating mechanism is made of upper pillar stand, central post and lower pillar stand, described stage body is placed in the upper pillar stand end, the upper pillar stand end is placed on the central post, the central post end is placed on the lower pillar stand, and the taper guiding device is located at upper pillar stand and central post, central post link.
3. according to claim 1 novel three save telescopic driller house support, it is characterized in that: described taper guiding connection device, adopt the tapered guiding connection mechanism of thickening at column and the overlapping junction of column, be divided into inner column fairlead and outer column fairlead, the inner column fairlead is fixed, and the outer column fairlead is detachable.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220189034 CN202659157U (en) | 2012-04-28 | 2012-04-28 | Novel three-section flexible driller room bracket |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220189034 CN202659157U (en) | 2012-04-28 | 2012-04-28 | Novel three-section flexible driller room bracket |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202659157U true CN202659157U (en) | 2013-01-09 |
Family
ID=47454067
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220189034 Expired - Fee Related CN202659157U (en) | 2012-04-28 | 2012-04-28 | Novel three-section flexible driller room bracket |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202659157U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104386624A (en) * | 2014-10-31 | 2015-03-04 | 南阳二机石油装备(集团)有限公司 | Driller room sledge and lifting device |
CN106167234A (en) * | 2016-08-18 | 2016-11-30 | 北京天和众邦勘探技术股份有限公司 | A kind of driller room lifting mechanism |
-
2012
- 2012-04-28 CN CN 201220189034 patent/CN202659157U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104386624A (en) * | 2014-10-31 | 2015-03-04 | 南阳二机石油装备(集团)有限公司 | Driller room sledge and lifting device |
CN106167234A (en) * | 2016-08-18 | 2016-11-30 | 北京天和众邦勘探技术股份有限公司 | A kind of driller room lifting mechanism |
CN106167234B (en) * | 2016-08-18 | 2018-07-06 | 北京天和众邦勘探技术股份有限公司 | A kind of driller room lifting mechanism |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201313792Y (en) | Lengthened hinge introducing platform of tower crane | |
CN102815628A (en) | Gantry hydraulic folding-arm crane | |
CN202659157U (en) | Novel three-section flexible driller room bracket | |
CN203048452U (en) | Propeller strut as well as installation structure and crane thereof | |
CN203037472U (en) | Static-load test apparatus for petroleum drilling machine | |
CN205154040U (en) | Drilling derrick upper segment folding mechanism upright walks | |
CN202296907U (en) | Suspension arm balanced movable arm tower crane capable of luffing based on steel rope traction | |
CN102691479A (en) | Slipping luffing mechanism for crossbeam of horizontal directional drilling machine | |
CN201924837U (en) | Automatic folding lambdoidal frame | |
CN205445450U (en) | Foldable safe cat ladder | |
CN204311982U (en) | The machine integrated rig of the tower tower in side | |
CN201635663U (en) | Drilling platform of workover rig | |
CN202766142U (en) | Gantry type hydraulic folding crane | |
CN206457208U (en) | A kind of lifting operating platform | |
CN212953981U (en) | Detachable portal frame | |
CN101817489B (en) | Chain type stroke amplifying lifting column | |
CN209261507U (en) | A kind of pipe handler apparatus | |
CN209817944U (en) | Trailer type folding drilling tower | |
CN207774680U (en) | A kind of portable mechanism jacking apparatus | |
CN205616459U (en) | Soil sampling restores overhead traveling crane elevating system of integrative rig | |
CN201785161U (en) | Folding type triangular suspension bracket | |
CN2929142Y (en) | Novel vertical self lift drilling machine base | |
CN220434795U (en) | Rail type prop and rail car thereof | |
CN204265328U (en) | Telescopic hoist assembling device | |
CN204646123U (en) | A kind of boring tower reconnoitring rig stretches the system of falling automatically |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee | ||
CP01 | Change in the name or title of a patent holder |
Address after: 473000 No. 869 West Zhongzhou Road, Henan, Nanyang Patentee after: RG PETRO-MACHINERY (GROUP) CO., LTD. Address before: 473000 No. 869 West Zhongzhou Road, Henan, Nanyang Patentee before: RG Petro-Machinery (Group) Co., Ltd. |
|
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130109 Termination date: 20210428 |
|
CF01 | Termination of patent right due to non-payment of annual fee |