CN202652257U - Information communication integration scheduling operation monitoring center - Google Patents

Information communication integration scheduling operation monitoring center Download PDF

Info

Publication number
CN202652257U
CN202652257U CN 201220283812 CN201220283812U CN202652257U CN 202652257 U CN202652257 U CN 202652257U CN 201220283812 CN201220283812 CN 201220283812 CN 201220283812 U CN201220283812 U CN 201220283812U CN 202652257 U CN202652257 U CN 202652257U
Authority
CN
China
Prior art keywords
terminal
information communication
input
graphics workstation
running
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220283812
Other languages
Chinese (zh)
Inventor
王芝茗
喻洪辉
刘树吉
赵永彬
李巍
曲瑞昌
张亚军
周小明
韦明
乔林
李亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
INFORMATION COMMUNICATION BRANCH LIAONING ELECTRIC POWER CO Ltd
State Grid Corp of China SGCC
Original Assignee
INFORMATION COMMUNICATION BRANCH LIAONING ELECTRIC POWER CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by INFORMATION COMMUNICATION BRANCH LIAONING ELECTRIC POWER CO Ltd filed Critical INFORMATION COMMUNICATION BRANCH LIAONING ELECTRIC POWER CO Ltd
Priority to CN 201220283812 priority Critical patent/CN202652257U/en
Application granted granted Critical
Publication of CN202652257U publication Critical patent/CN202652257U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Closed-Circuit Television Systems (AREA)

Abstract

The present utility model relates to an information communication integration scheduling operation monitoring center. A terminal is connected with an input end of an eight-control thirty-two switch, an output end of the eight-control thirty-two switch is connected with an input end of an application server, the application server is respectively connected with input ends of a visualization server, a graphic work station, a cable television, a mobile office terminal, a DVD, an information display terminal, a communication display terminal, a camera and a conference television system through the internet, output ends of the above equipment are jointly connected with an input end of a RGB matrix switcher, an output end of the RGB matrix switcher is respectively connected with an input end of an image processor, a video conference display system and a control room monitor, and an output end of the image processor is connected with a screen. In the center, integration and visibility are realized, reliable operation of the regulation and control center can be ensured, data synchronism and consistency with other systems can be conveniently realized, and standard unification of style, image, color match and monitoring contents of the regulation and control center can be guaranteed.

Description

The integrated management and running of information communication Surveillance center
Technical field
The utility model relates to the management and running supervising device, the specifically integrated management and running of a kind of information communication Surveillance center.
Background technology
Management and running Surveillance center refers to O﹠M supervisory control system (IMS), safety monitoring system (ISS), use live system (IAS), power dispatching telephone system, communication scheduling telephone system, T-MIS, communications equipment room dynamic environment monitoring system, video monitoring system, fire early-warning system, communications network management system carries out on line real-time monitoring.
For Surveillance center limited human resources and hardware resource, monitor simultaneously each system ageing, promptness and fail safe have larger hidden danger, color and the specification of each system's display interface are very withered uneven simultaneously, fit up coarsely, the aspects such as the video picture of large-size screen monitors, splicing and definition, resolution are compared with advanced level of today and have also been had larger gap.
Along with information-based high speed development, the business of the every production and operation of company strengthens day by day to the dependence of information system, because system is huge and complicated, the difficulty of discovery and process information fault also improves constantly.
The utility model content
For above-mentioned weak point of the prior art, the technical problems to be solved in the utility model provides the integrated management and running of a kind of visual information communication Surveillance center.
The technical scheme that the utility model adopts for achieving the above object is: the integrated management and running of a kind of information communication Surveillance center, terminal is connected with the input of 8 controls, 32 switches, the output of 8 controls, 32 switches is connected with the input of application server, application server by network respectively with visualization server, graphics workstation, cable TV, the mobile office terminal, DVD, information display terminal, the communication demonstration terminal, camera, the input of TV conference system connects, described visualization server, graphics workstation, cable TV, the mobile office terminal, DVD, information display terminal, the communication demonstration terminal, camera, the output of TV conference system is connected to the input of rgb matrix switch jointly, the output of rgb matrix switch connects respectively the input of image processor, video conference display system and OPS's monitor, the output of image processor is connected with screen.
Described terminal is the PC device end.
The master control main frame that described 8 controls, 32 switches are comprised of 41 minute 4 switches.
Described application server is the server that vision signal is transmitted by network.
Described graphics workstation comprises main screen graphics workstation, left side screen graphics workstation, right side screen graphics workstation and ring screen graphics workstation.
Described rgb matrix switch is for the equipment that the multi-screen signal is converted to the single screen signal.
The utlity model has following advantage:
1. reliability: guarantee the safe and reliable of design, make 7 * 24 hours reliability services in regulation and control center;
2. maintainable: as hardware system, software systems to be safeguarded diagnosis, make it possess higher maintainability;
3. open: application system itself and required third party's software and hardware product thereof are all selected the general or standardized product of following international standard and power industry standard, the maintenance of reduction system, upgrading, improvement cost, satisfy the explorative requirement of system, adopt open architecture, open environment is provided;
4. uniformity: regulation and control center style, image, collocation of colour are netted company's high unity with state; Guarantee that regulation and control center monitoring contents norm is unified;
5. adaptability: adapt to the application of net province company, have widely applicability, guarantee that the regulation and control center all can be suitable for the monitoring content of newly-increased access, satisfies the multiple demands such as daily monitoring, window displaying, emergency disposal;
6. economy: according to life cycle management design concept and method, under the prerequisite that guarantees high reliability, by the Technological Economy analysis-by-synthesis, preferentially adopt the high technology and equipment of the ratio of performance to price;
7. advanced: as to represent domestic and international advanced level and regulation and control center development trend;
8. flexibility: design realizes interface flexible, and increase and decrease is convenient, and the monitoring combining form is various, and following extensibility is strong.
Description of drawings
Fig. 1 is Organization Chart of the present utility model.
Wherein: 1. terminal, 2.8 control 32 exchanger hosts, 3. application servers, 4. visualization server, 5. graphics workstation, 6. cable TV, 7. mobile office terminal, 8.DVD, 9. information display terminal, 10. communication demonstration terminal, 11. cameras, 12. TV conference system, 13.RGB matrix switcher, 14. image processors, 15. video conference display systems, 16. OPS's monitor, 17. screens
Embodiment
Below in conjunction with drawings and Examples the utility model is described in further detail.
As shown in Figure 1, terminal 1 of the present utility model is connected with the input of 8 controls, 32 switches 2, the output of 8 controls, 32 switches 2 is connected with the input of application server 3, application server 3 by network respectively with visualization server 4, graphics workstation 5, cable TV 6, mobile office terminal 7, DVD8, information display terminal 9, communication demonstration terminal 10, camera 11, the input of TV conference system 12 connects, described visualization server 4, graphics workstation 5, cable TV 6, mobile office terminal 7, DVD8, information display terminal 9, communication demonstration terminal 10, camera 11, the output of TV conference system 12 is connected to the input of rgb matrix switch 13 jointly, the output of rgb matrix switch 13 connects respectively the input of image processor 14, video conference display system 15 and OPS's monitor 16, the output of image processor 14 is connected with screen 17.Described terminal 1 is the PC device end.The master control main frame that described 8 controls, 32 switches 2 are comprised of 41 minute 4 switches.Described application server 3 is servers that vision signal is transmitted by network.Described graphics workstation 5 comprises main screen graphics workstation, left side screen graphics workstation, right side screen graphics workstation and ring screen graphics workstation.Described rgb matrix switch 13 is for the equipment that the multi-screen signal is converted to the single screen signal.Described visualization server 4 is with monitoring and shows the server that index is showed by the visual presentation interface.Described information display terminal 9 is the terminals for exhibition information kind equipment and system.Described communication demonstration terminal 10 is the terminals for exhibition information kind equipment and system.
The regulation and control center function is divided monitoring and is represented two parts, and its content is mainly as follows:
1. monitoring function is as follows:
1) network equipment and network channel running status;
2) operating index such as main process equipment operation conditions, internal memory and cpu busy percentage;
3) database running status, percent of Log Space Used, database table space utilization rate etc.;
4) middleware running status;
5) safety means running status, security threat and the monitoring of security incident situation;
6) desktop management system and illegal external connection situation monitoring;
7) dynamic environment monitorings such as the whole province's information communication machine room humiture, UPS, DC power supply; The machine room video monitoring;
8) operation system index monitoring;
9) communication core transmission network, regional key A, B network management, communication data network management, soft switchcall server, intelligent grid communications management system;
10) power scheduling, information communication dispatching telephone;
2. display function is as follows
1) O﹠M comprehensive monitoring system (IMS) data display;
2) comprehensive inquiry analytical system (IAS) data display;
3) network security monitoring system (ISS) data display;
4) GIS-Geographic Information System (GIS) is showed;
5) operation of power networks information display;
6) operation and management information is showed;
7) intelligent grid communications management system, communication core transmission network, regional key A, B network management are showed.

Claims (6)

1. the integrated management and running of information communication Surveillance center, it is characterized in that, terminal (1) is connected with the input of 8 control 32 switches (2), the output of 8 control 32 switches (2) is connected with the input of application server (3), application server (3) by network respectively with visualization server (4), graphics workstation (5), cable TV (6), mobile office terminal (7), DVD(8), information display terminal (9), communication demonstration terminal (10), camera (11), the input of TV conference system (12) connects, described visualization server (4), graphics workstation (5), cable TV (6), mobile office terminal (7), DVD(8), information display terminal (9), communication demonstration terminal (10), camera (11), the output of TV conference system (12) is connected to the input of rgb matrix switch (13) jointly, the output of rgb matrix switch (13) connects respectively the input of image processor (14), video conference display system (15) and OPS's monitor (16), the output of image processor (14) is connected with screen (17).
2. the integrated management and running of information communication according to claim 1 Surveillance center is characterized in that, described terminal (1) is the PC device end.
3. the integrated management and running of information communication according to claim 1 Surveillance center is characterized in that, the master control main frame that described 8 control 32 switches (2) are comprised of 41 minute 4 switches.
4. the integrated management and running of information communication according to claim 1 Surveillance center is characterized in that, described application server (3) is the server that vision signal is transmitted by network.
5. the integrated management and running of information communication according to claim 1 Surveillance center is characterized in that, described graphics workstation (5) comprises main screen graphics workstation, left side screen graphics workstation, right side screen graphics workstation and ring screen graphics workstation.
6. the integrated management and running of information communication according to claim 1 Surveillance center is characterized in that, described rgb matrix switch (13) is for the equipment that the multi-screen signal is converted to the single screen signal.
CN 201220283812 2012-06-15 2012-06-15 Information communication integration scheduling operation monitoring center Expired - Fee Related CN202652257U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220283812 CN202652257U (en) 2012-06-15 2012-06-15 Information communication integration scheduling operation monitoring center

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220283812 CN202652257U (en) 2012-06-15 2012-06-15 Information communication integration scheduling operation monitoring center

Publications (1)

Publication Number Publication Date
CN202652257U true CN202652257U (en) 2013-01-02

Family

ID=47421282

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220283812 Expired - Fee Related CN202652257U (en) 2012-06-15 2012-06-15 Information communication integration scheduling operation monitoring center

Country Status (1)

Country Link
CN (1) CN202652257U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103439945A (en) * 2013-08-27 2013-12-11 国家电网公司 Large-size screen displaying system for power operation monitoring center

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103439945A (en) * 2013-08-27 2013-12-11 国家电网公司 Large-size screen displaying system for power operation monitoring center
CN103439945B (en) * 2013-08-27 2016-04-13 国家电网公司 The large screen display system of a kind of power operation Surveillance center

Similar Documents

Publication Publication Date Title
CN102930393A (en) Comprehensive power grid information display visualization system
CN207399423U (en) A kind of distributed network video process apparatus
CN204707207U (en) Based on the tiled display control system of cloud computing technology
CN206164723U (en) Rail transit construction safety risk is synthesized and is monitored large -size screen monitors
CN105208358A (en) Video monitoring system for video-wall configuration
CN108132766A (en) A kind of distribution cloud system and its joining method
CN203492134U (en) Android operating system based intelligent monitor visual intercom terminal
CN204833270U (en) Digital billboard of power supply enterprise's decision -making management
CN110365854A (en) One kind is attended a banquet management system
CN104244029A (en) Advertising machine system with long-distance screen capture function and method of advertising machine system
CN202652257U (en) Information communication integration scheduling operation monitoring center
CN204559760U (en) Intelligent network video monitoring and safeguard management platform linked system
CN201967045U (en) Video monitoring server
CN206195824U (en) Fuse communication system
CN107682673A (en) A kind of method that 4KHDR and HDSDR signals are supervised based on GPU and video IO cards simultaneously
CN106656994A (en) Integrated communication system
Blackwell et al. 54‐6: Holographic 3D Telepresence System with Light Field 3D Displays and Depth Cameras over a LAN
CN204258986U (en) A kind of cluster video monitoring system
CN104202539A (en) Tiled screen meeting display method
CN2932805Y (en) Digital remote viewing and electric combined automated integrated system
CN210804376U (en) Novel control framework of all-in-one LED display screen
CN204442537U (en) Unified command Dispatching Control System
CN204204385U (en) Large screen display system
CN204288200U (en) A kind of liquid crystal display splicing control system
CN1808978A (en) Method of implementing network control of multiple television sets with computer

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA

Effective date: 20121214

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20121214

Address after: 110000 Ningbo Road, Heping District, Liaoning, No. 18, No.

Patentee after: Information Communication Branch, Liaoning Electric Power Co., Ltd.

Patentee after: State Grid Corporation of China

Address before: 110000 Ningbo Road, Heping District, Liaoning, No. 18, No.

Patentee before: Information Communication Branch, Liaoning Electric Power Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130102

Termination date: 20200615