Summary of the invention
The purpose of this utility model is in order to finish research and the proving test work to transformer fault and relevant evaluation diagnosis, to develop a kind of transformer that possesses the most common failure analog functuion.
The technical solution that the utility model adopts is: the transformer that possesses the most common failure analog functuion, it comprises transformer body, be provided with silicon sheet core in the described transformer body, be wound with winding on the described silicon sheet core, its difference is: the top of described transformer body is provided with 3 iron core grounding sleeve pipes, draw three ground wires to the iron core grounding sleeve pipe from silicon sheet core, the first ground wire wherein, the second ground wire is drawn from about two adjacent silicon steel discs of 25% chip level position, the 3rd ground wire is drawn from the about siliconized plate of 75% chip level position, and three iron core grounding sleeve pipes are drawn respectively a ground wire and are used for externally being grounded or disconnecting.
By above scheme, described shunting switch is bar formula off circuit tap changer, and the coupling bolt that is connected to the high-voltage terminal place of described winding at a certain gear of shunting switch is installed electric discharge device; The material of described electric discharge device is for being steel, and its bottom is right cylinder, and the top is cone, central angle 120 degree, and the right cylinder tapping of degree bottom, dimension of inner screw thread and bolt are complementary.
The utility model principle: the transformer that possesses the most common failure analog functuion is simulated overheating fault and discharge fault simultaneously by three ground wires and the electric discharge device that is placed on the shunting switch, the failure situations that the fault of simulation occurs when being the operation of emulation transformer.With the first, the 3rd ground wire externally simultaneously ground connection will simulate 2 earth faults of iron core, with first, second ground wire externally while ground connection will simulate short trouble between lamination.After installing electric discharge device, transfer to the tapping gear that electric discharge device is housed, slowly boost, simulate corona discharge after reaching the discharge inception voltage of electric discharge device.
Compared with prior art, technique effect of the present utility model is: take the utility model testing transformer as support, can carry out about the monitoring of the faults such as short circuit between 2 ground connection of iron core, lamination, overheated and shelf depreciation and the research of pick-up unit, the evolution research of fault under various working, fault countermeasure research etc.
Embodiment
The utility model is a kind of transformer that possesses the most common failure analog functuion, can simulate common overheated and discharge fault, realizes the emulation of transformer normal condition, various faults state, can finish research and proving test to the transformer most common failure.
Such as Fig. 1-shown in Figure 4, a kind of transformer that possesses the most common failure analog functuion of the utility model embodiment, it comprises transformer body 1, be provided with silicon sheet core 2 in the described transformer body 1, be wound with winding 3 on the described silicon sheet core 2, the top of described transformer body 1 is provided with 3 iron core grounding sleeve pipes 4, draw three ground wires to iron core grounding sleeve pipe 4 from silicon sheet core 2, the first ground wire 5 wherein, the second ground wire 6 is drawn from about two adjacent silicon steel discs of 25% chip level position, the 3rd ground wire 7 is drawn from the about siliconized plate of 75% chip level position, and three iron core grounding sleeve pipes 4 are drawn respectively a ground wire and are used for externally being grounded or disconnecting.
Concrete, as shown in Figure 4, described shunting switch 8 is bar formula off circuit tap changer, the coupling bolt 9 that is connected to the high-voltage terminal place of described winding 3 at shunting switch 8 a certain gears is installed electric discharge device 10; The material of described electric discharge device 10 is for being steel, and its bottom is right cylinder, and the top is cone, central angle 120 degree, and bottom right cylinder tapping, dimension of inner screw thread and bolt are complementary.
Embodiment of the present utility model comprises fault simulation and correlation test.The enforcement of fault simulation comprises the enforcement of overheating fault simulation and the enforcement of discharge fault simulation.The embodiment of several correlation tests has hereinafter been listed in the correlative study test that correlation test refers to utilize the transformer that possesses transformer most common failure analog functuion of this patent utility model to carry out.
Fault simulation
(a) overheating fault
This design of transformer two kinds of overheating faults of short circuit between multipoint earthing of iron core and lamination.
During the analogue transformer normal operating condition, with the normal ground connection of the first ground wire, second, third ground wire open circuit.
During the analogue transformer multipoint earthing of iron core, with the first, the 3rd ground wire while ground connection, the second ground wire open circuit.At this moment, when static exciter, there is potential difference (PD) in 2 ground connection of iron core between two earth points of iron core, and form the galvanic circle, cause circulation overheated.
Between the analogue transformer lamination during short circuit, with first, second ground wire ground connection simultaneously, the 3rd ground wire open circuit.At this moment, two adjacent silicon steel discs of iron core are ground connection simultaneously, is equivalent to two adjacent siliconized plate short circuits, and the eddy current loss of this short circuit siliconized plate increases, and it is overheated to form.
(b) discharge fault
This design of transformer occur in the corona discharge fault of shunting switch to the lead-in wire between the winding high pressure connection.
When uneasiness was put electric installation, transformer operated to normal condition.
Choose a certain gear and to the coupling bolt at winding high-voltage terminal place, electric discharge device is installed.
The transformer tapping gear is beaten to the gear that is equipped with electric discharge device, slowly boosts, and after reaching discharge inception voltage, the point electrode of electric discharge device is in non-uniform electric field, produces corona discharge.
Correlation test
(a) monitoring and pick-up unit development test
Install sensor additional at testing transformer, and build measuring system, by the simulation of overheating fault simulation and discharge fault, the relevant monitoring of research and pick-up unit.As for overheating fault research top-oil temperature thermometer, the monitoring of fiber grating distributed temperature measuring system equitemperature and pick-up unit, for discharge fault research ultrasound partial discharge, HFCT, monitoring and pick-up unit are put in the offices such as UHF.
(b) the inferior the Study on Fault test of bad condition
State when changing the transformer operation is realized short circuit, overload, thunderbolt, and overexcitation, the bad conditions such as superpotential carry out fault genesis mechanism under bad condition and the research of evolution.Such as the overheating fault of research under overload, the discharge fault under superpotential etc.
(c) Research on Fault Diagnosis Technology
Fault to the transformer simulation is carried out omnibearing monitoring, and collection can characterize the quantity of information of fault, changes the happening part of fault, the factors such as the order of severity, research fault diagnosis technology.As study short circuit diagnostic techniques between multipoint earthing of iron core fault diagnosis technology, lamination, Partial discharges diagnosis technology, partial discharge location diagnostic techniques etc.
(d) fault countermeasure development test
After the research transformer breaks down, take which kind of measure can guarantee power grid security and device security, reduce economic loss.By the simulation test to the different countermeasures of different faults, each tactful result is carried out analysis and evaluation, work out the optimal strategy for each fault.
The part such as the utility model transformer body, sleeve pipe, off circuit tap changer, heat radiator is according to the standard design such as GB1094.1, GB1094.2, GB1094.3, GB1094.5 and manufacturing.