CN202644704U CN 201220288528 CN201220288528U CN202644704U CN 202644704 U CN202644704 U CN 202644704U CN 201220288528 CN201220288528 CN 201220288528 CN 201220288528 U CN201220288528 U CN 201220288528U CN 202644704 U CN202644704 U CN 202644704U
Authority
CN
China
Prior art keywords
well
road inspection
inspection well
well structure
well seat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220288528
Other languages
Chinese (zh)
Inventor
蒋锋
吴正军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No4 Metallurgical Construction Co Of China Ltd
Original Assignee
No4 Metallurgical Construction Co Of China Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No4 Metallurgical Construction Co Of China Ltd filed Critical No4 Metallurgical Construction Co Of China Ltd
Priority to CN 201220288528 priority Critical patent/CN202644704U/en
Application granted granted Critical
Publication of CN202644704U publication Critical patent/CN202644704U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a building structure of public facilities, in particular to a road inspection well structure. A precast concrete well ring is laid at the top of a shaft; a well seat is connected onto the precast concrete well ring and is connected with support templates; and embedded hooks are arranged on the support templates. The road inspection well structure has the characteristics of simple structure, lower construction cost, better safety performance, stronger drainage ability and the like.

Description

The road inspection well structure
Technical field
The utility model relates to a kind of communal facility building structure, especially relates to a kind of road inspection well structure.
Background technology
Urban road is as a communal facilities, and in the today that constantly promotes city taste, creates civilized communities, it is particularly important that presentation quality seems.For many years, in each grade road, generally all exist the distortion of rainwater, sewage inspection well, Lu Jing joint portion to sink, well lid comes off and the problems such as Lu Jing joint portion be full of cracks.These problems not only can affect the attractive in appearance of the use function of road and urban environment, also can cause the damage of motor vehicles, can cause traffic accident when serious, because causing the manhole well lid, a variety of causes comes off simultaneously, make on the ground earth and foreign material fall into easily in the well, make pipeline be difficult to normal draining, also can affect ground pedestrian, vehicle and other movable safety and comforts, when serious even cause human casualty accident.
Summary of the invention
The utility model mainly is relatively poor for the existing safety of prior art, drainability a little less than, the technical problem that waits provides a kind of simple in structure, construction cost is lower, safety is better, the road inspection well structure that drainability is stronger.
Above-mentioned technical problem of the present utility model is mainly solved by following technical proposals: the pit shaft top is covered with the Prefabricated Concrete walling crib, is connected with the well seat on the Prefabricated Concrete walling crib, and the well seat is connected with formwork supporting plate, is provided with pre-buried suspension hook on the formwork supporting plate.Can lay net on the pre-buried suspension hook in the pit shaft, prevent that people or article from dropping in the well, not affect draining simultaneously.
As preferably, be provided with adjusting nut on the well seat, the well seat is connected on the Prefabricated Concrete walling crib by adjusting nut.Can regulate the height of well seat in pit shaft by adjusting nut.
Therefore, the utlity model has simple in structure, the characteristics such as construction cost is lower, and safety is better, and drainability is stronger.
Description of drawings
Accompanying drawing 1 is overall structure schematic diagram of the present utility model.
The specific embodiment
Below by embodiment, and by reference to the accompanying drawings, the technical solution of the utility model is described in further detail.
Embodiment 1: pit shaft 1 top is covered with Prefabricated Concrete walling crib 2, Prefabricated Concrete walling crib 2 interior pre-buried three steel concrete fragments of brick, every reinforced concrete block exceeds well inwall 5cm, is used for placing thick this board size of the anti-fall plate of circular steel reinforced concrete of 6cm and is slightly less than manhole well head internal diameter; Be connected with well seat 5 on the Prefabricated Concrete walling crib 2, well seat 5 is connected with formwork supporting plate 3, is provided with pre-buried suspension hook 4 on the formwork supporting plate 3.Be provided with adjusting nut 6 on the well seat 5, well seat 5 is connected to (as shown in Figure 1) on the Prefabricated Concrete walling crib 2 by adjusting nut 6.

Claims (2)

1. road inspection well structure, consisted of by pit shaft and the well lid that covers on the pit shaft top, it is characterized in that described pit shaft (1) top is covered with Prefabricated Concrete walling crib (2), be connected with well seat (5) on the Prefabricated Concrete walling crib (2), well seat (5) is connected with formwork supporting plate (3), is provided with pre-buried suspension hook (4) on the formwork supporting plate (3).
2. road inspection well structure according to claim 1 is characterized in that being provided with adjusting nut (6) on the described well seat (5), and well seat (5) is connected on the Prefabricated Concrete walling crib (2) by adjusting nut (6).
CN 201220288528 2012-06-11 2012-06-11 Road inspection well structure Expired - Fee Related CN202644704U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220288528 CN202644704U (en) 2012-06-11 2012-06-11 Road inspection well structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220288528 CN202644704U (en) 2012-06-11 2012-06-11 Road inspection well structure

Publications (1)

Publication Number Publication Date
CN202644704U true CN202644704U (en) 2013-01-02

Family

ID=47413828

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220288528 Expired - Fee Related CN202644704U (en) 2012-06-11 2012-06-11 Road inspection well structure

Country Status (1)

Country Link
CN (1) CN202644704U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105484294A (en) * 2015-12-15 2016-04-13 重庆亘宇园林景观工程有限公司 Assembly settlement-prevention well seat
CN108729533A (en) * 2017-04-24 2018-11-02 五冶集团上海有限公司 A kind of rainwater collection pool venthole concrete blinding and preparation method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105484294A (en) * 2015-12-15 2016-04-13 重庆亘宇园林景观工程有限公司 Assembly settlement-prevention well seat
CN108729533A (en) * 2017-04-24 2018-11-02 五冶集团上海有限公司 A kind of rainwater collection pool venthole concrete blinding and preparation method thereof

Similar Documents

Publication Publication Date Title
CN201276708Y (en) Security anti-drop wellhead device for rain/sewage inspection shaft
CN202644704U (en) Road inspection well structure
CN104631507B (en) A kind of manufacture method of concrete combined manhole cover
CN202722124U (en) Three-dimensional greening landscape wall
CN203795373U (en) River channel bank protection structure
CN103306306A (en) Anti-differential settlement inspection well device and construction method thereof
CN204385766U (en) The safe barrier covering plate structure of existing road piping shaft
CN106917527A (en) A kind of concealed underground garage of family expenses
CN202416532U (en) Precast resin concrete drain
CN2893020Y (en) Road sewage apparatus
CN202849893U (en) Concrete slab pavement structure
CN101845825A (en) Calibration method for lifting of movable examination well shutter
CN201738330U (en) Tower crane base construction
CN201538974U (en) Well cover seat
CN203795471U (en) Safety inspection well structure
CN205116002U (en) Six to shift comb pinion rack telescoping device
CN204370831U (en) The additional Fabricated balcony structure in old community
CN203200892U (en) Road surface water-collecting well
CN201221130Y (en) Rain water and sewage water manhole structure
CN202202396U (en) Shaft structure of road safety well
CN209082661U (en) Water-bound is received in the catch-basin comb integration for being embedded in dividing strip
CN205046660U (en) Prevention waterlogging well lid structure
CN203440906U (en) Rainwater pipeline opening preventing pedestrian from falling into
CN202559387U (en) Well lid with adjustable wellhole crossing height
CN201742766U (en) Flowerpot used for road isolation belt or roadside

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130102