CN101845825A CN201010118106A CN201010118106A CN101845825A CN 101845825 A CN101845825 A CN 101845825A CN 201010118106 A CN201010118106 A CN 201010118106A CN 201010118106 A CN201010118106 A CN 201010118106A CN 101845825 A CN101845825 A CN 101845825A
Authority
CN
China
Prior art keywords
well
well lid
cage ring
combination
lid combination
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201010118106A
Other languages
Chinese (zh)
Inventor
姜静怡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Yili Municipal Construction & Decoration Engineering Co Ltd
Original Assignee
Guizhou Yili Municipal Construction & Decoration Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Yili Municipal Construction & Decoration Engineering Co Ltd filed Critical Guizhou Yili Municipal Construction & Decoration Engineering Co Ltd
Priority to CN201010118106A priority Critical patent/CN101845825A/en
Publication of CN101845825A publication Critical patent/CN101845825A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention discloses a calibration method for lifting of a movable examination well shutter, comprising the following steps of: (1) adding an isolation ring out of a well shutter combination formed by the movable examination well shutter and a well base; (2) reserving reinforcing steel bars on the periphery of the isolating ring, burying the reserved reinforcing steel bars into ground to form a material integrated with the ground; (3) when the well shutter combination is placed in the isolation ring, reserving a gasket and an embedded fixing clip between the well shutter combination and the isolation ring; (4) arranging a cushion layer at the lower edge of the well shutter combination and the isolation ring and reserving a gap therebetween; (5) when maintenance is required, inserting a crowbar into the gap, prying the movable examination well shutter combination, and placing a special gasket between the well shutter combination and the isolation ring if the movable examination well shutter combination is needed to raise to the normal position; and on the contrary, extracting the reserved gasket between the well shutter combination and the isolation ring. The invention can solve the repairing problem of the well base of an examination well which sinks, raises or tilts under pressure. And the maintenance is dry operation which can be accomplished within an hour, thereby not causing traffic jam, easing the labor intensity and having low cost and high efficiency.

Description

The bearing calibration of lifting of movable examination well shutter
Technical field
The present invention relates to be used for checking the manhole cover of facilities such as underground pipeline, cable, optical cable,, relate in particular to the bearing calibration of its lifting in particular to movable examination well shutter.
Background technology
Traditional manhole cover such as traditional drainage inspection well, rainwater inspection well, sewage manhole often exists the heavy under pressure or inclination of well seat, well lid is easily pushed by wheel and shortcoming such as rout up.And the maintenance of sinking or tilting for well lid, traditional method be adopt manually excavate, levelling again, concrete pouring solidify construction that takes 10 days at the soonest and concrete curing phase.Not only cost height, cycle are long for this, and are wet works.Also can cause the maintenance interval traffic to be obstructed.These problem already cause people's attention.The Chinese patent application part that relates to manhole and well lid thereof reaches thousands of, and most technical schemes are to improve from structure and material.As CN00112189.8 " plumbing manhole cover, seat and production technology thereof ", CN00132052.1 " manhole cover made of composite material and well seat ", CN200310112674.2 " pipe type manhole ", CN03131811.8 " integral type pipe manhole " etc.But thoroughly do not solve the maintenance shortcoming that existing manhole exists yet.For this reason, the inventor is the bearing platform type manhole of development of new once, and relevant patent has " bearing platform type safety manhole " No. 200510003298.2, and its advantage is durable, can ensure driving and pedestrian's safety.But this bearing platform type manhole mainly is divided into well base, pit shaft, well seat, walling crib, cushion cap and well lid, and the structure of whole manhole is comparatively complicated, and cost is higher, and construction is trouble comparatively; Its maintenance is proofreaied and correct to be needed with the use jack, and the manhole of sinking is raise, and just is difficult to keep in repair for reduce the manhole of giving prominence to owing to ground.
Summary of the invention
The object of the present invention is to provide a kind of bearing calibration of lifting of movable examination well shutter,, easily various manhole covers are keeped in repair correction to overcome the shortcoming of prior art.
For reaching goal of the invention, the inventor at movable examination well shutter be meant have well lid, the manhole of well seat and pit shaft, also contain the manhole that cushion cap is arranged certainly, its bearing calibration comprises:
1. the periphery of the well lid combination that constitutes at movable examination well shutter and well seat thereof increases cage ring, and its inner ring just in time holds the well lid combination; Cage ring is isolated well lid combination and road surface constituent material;
2. at the neighboring of cage ring reserved steel bar, during use the reinforcing bar of reserving is imbedded within the constituent material on ground, be combined into integral body with the ground constituent material;
3. when cage ring is inserted in the well lid combination, between well lid combination and cage ring, embed fixation clamp;
4. in the lower edge of cage ring and well lid combination bed course is set, therebetween preset clearance;
5. when needing repairing the manhole cover of that proofread and correct or that raise or inclination, insert the gap with crowbar or ultrathin jack, the manhole cover combination is levered up or jack-up, make its rising make the well seat recover the normal position if desired, just between well lid combination and cage ring, insert special pad and make its rising; Make its decline make the well seat recover the normal position if desired, just between well lid combination and cage ring, extract the pad of reserving out and make its reduction.
Attention is filled the pitch ointment in the gap between cage ring and well seat, prevents that rainwater from infiltrating in the well.
Above-mentioned road surface constituent material comprises the concrete bed course, asphalt concrete layer, the composite bed of concrete layer and bituminous concrete.
Above-mentioned manhole cover front has center screw, also has two lifting handles; The middle part of reverse side is the load round platform that has screw, also has reinforcing rib radially; Well lid is fixed on the load round platform by securing member, and embeds the well seat, and well seat, well lid are linked to be integral body, forms the well lid combination.
The quantity of the peripheral reserved steel bar of above-mentioned cage ring is 1~6 row, and the length of every reinforcing bar is 200~600mm, wherein 60%~70% imbeds within the constituent material of ground.
Reserving the pad gross thickness between combination of above-mentioned well lid and the cage ring is 10~80mm, is that the pad of 10mm, 20mm, 30mm, 50mm is formed by stacking by thickness respectively.
The preset clearance of above-mentioned bed course is parallel clearance or oblique gap, and gradient is 0 °~50 °.
The inventor points out, because the reinforcing bar that cage ring is reserved is imbedded within the constituent material of ground, is combined into integral body with ground, so the problem of change in location can not appear in cage ring substantially, and the problem of having only the well lid combination just to have sinking, raise or tilt; Therefore as long as reserve pad and preset clearance, unclamp the fixation clamp that embeds between well lid combination and the cage ring and just can keep in repair the rectifying inspection well lid easily.
The method that lifting of movable examination well shutter provided by the present invention is proofreaied and correct can solve the reparation problem of the sedimentation under pressure of manhole well seat, rising or inclination like a cork; And maintenance to proofread and correct be the dry farming industry, only must can finish in one hour, can not cause traffic jam, alleviate the labour intensity that the manhole maintenance is proofreaied and correct, maintenance cost is low, efficient is high.Be applicable to movable examination well shutter.
Description of drawings
Accompanying drawing 1 is movable examination well shutter combination and cage ring structural representation, and Fig. 2 is for reserving the schematic diagram of pad; Fig. 3-Fig. 5 is the schematic diagram of special pad.1 is pit shaft among the figure, and 2 is the well seat, and 3 is well lid, and 4 is cage ring, and 5 for reserving pad, and 6 is the ground constituent material, and 7 is the gap, inclined-plane, and 8 is special pad, and 9 is reinforcing bar, and 10 is bed course.
The specific embodiment
Embodiment:
Movable examination well shutter 3 and constitute the well lids combination with well seat 2 increases cage ring 4 at the periphery of well lid combination, and its inner ring holds the well lid combination; Cage ring 4 is isolated the well lid combination and the ground constituent material 6 of road; 4 placing of reinforcements 9 that cage ring 4 peripheries are reserved are imbedded within the ground constituent material 6, be combined into integral body with ground, as shown in Figure 1; When cage ring 4 is inserted in the well lid combination, reserve pad 5 between well lid combination and cage ring 4, gross thickness is 40mm; Lower edge in cage ring 4 and well lid combination is provided with bed course 10, reserves gradient therebetween and be 30 ° gap 7, when needing repairing the rectifying inspection well, inserts gap 7 with crowbar, and the well lid combination of manhole is levered up; Make its rising if desired and make the well seat recover the normal position, just between well lid combination and cage ring 4, insert special pad 8; Make its decline if desired and make the well seat recover the normal position, just between well lid combination and cage ring 4, extract the pad of reserving 5 out.

Claims (6)

1. the bearing calibration of a lifting of movable examination well shutter, its feature comprises:
1. the periphery of the well lid combination that constitutes at movable manhole well lid and well seat thereof increases cage ring, and its inner ring just in time holds the well lid combination; Cage ring is isolated well lid combination and road surface constituent material;
2. at the peripheral reserved steel bar of cage ring, during use the reinforcing bar of reserving is imbedded within the constituent material on ground, be combined into integral body with the ground constituent material;
3. when cage ring is inserted in the well lid combination, between well lid combination and cage ring, reserve pad;
4. in the lower edge of cage ring and well lid combination bed course is set, therebetween preset clearance;
5. when needing repairing the manhole cover of that proofread and correct or that raise or inclination, insert the gap with crowbar or ultrathin jack, the manhole cover combination is levered up or jack-up, it is raise recover the normal position, just between well lid combination and cage ring, insert special pad; It is descended recover the normal position, just between well lid combination and cage ring, extract the pad of reserving out and make its reduction.
2. according to the described bearing calibration of claim 1, it is characterized in that described road surface constituent material comprises the concrete bed course, asphalt concrete layer, the composite bed of concrete layer and bituminous concrete.
3. according to the described bearing calibration of claim 1, it is characterized in that described manhole cover front has center screw, also have two lifting handles; The middle part of reverse side is the load round platform that has screw, also has reinforcing rib radially; Well lid is fixed on the load round platform by securing member, and embeds the well seat, and well seat, well lid are linked to be integral body, forms the well lid combination.
4. according to the described bearing calibration of claim 1, the quantity that it is characterized in that the peripheral reserved steel bar of described cage ring is 1~6 row, and the length of every reinforcing bar is 200~600mm, wherein 60%~70% imbeds within the constituent material of ground.
5. according to the described bearing calibration of claim 1, it is characterized in that reserving the pad gross thickness between described well lid combination and the cage ring is 10~80mm, be that the pad of 10mm, 20mm, 30mm, 50mm is formed by stacking by thickness respectively.
6. according to the described bearing calibration of claim 1, the preset clearance that it is characterized in that described bed course is parallel clearance or oblique gap, and gradient is 0 °~50 °.
CN201010118106A 2010-03-05 2010-03-05 Calibration method for lifting of movable examination well shutter Pending CN101845825A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010118106A CN101845825A (en) 2010-03-05 2010-03-05 Calibration method for lifting of movable examination well shutter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010118106A CN101845825A (en) 2010-03-05 2010-03-05 Calibration method for lifting of movable examination well shutter

Publications (1)

Publication Number Publication Date
CN101845825A true CN101845825A (en) 2010-09-29

Family

ID=42770625

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010118106A Pending CN101845825A (en) 2010-03-05 2010-03-05 Calibration method for lifting of movable examination well shutter

Country Status (1)

Country Link
CN (1) CN101845825A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104060631A (en) * 2014-06-30 2014-09-24 南昌航空大学 Road well lid opening elevation dynamic control structure and construction method thereof
CN104562906A (en) * 2014-12-30 2015-04-29 浙江联运环境工程有限公司 Device and method for repairing manhole cover
CN106703083A (en) * 2017-01-24 2017-05-24 青岛工学院 Height-adjustable well lid
CN107604948A (en) * 2017-09-11 2018-01-19 浙江大成工程项目管理有限公司 A kind of municipal inspection shaft anti-settling structure and its construction method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2081401U (en) * 1990-07-06 1991-07-24 王文质 High-adjustable anti-stealing checking well cover
CN2285324Y (en) * 1996-12-27 1998-07-01 许刚强 Height easyly adjustable frame for manhole cover
CN2594320Y (en) * 2003-01-15 2003-12-24 王仁基 Height adjustable perimeter crushproof safety well tools
CN2706518Y (en) * 2004-05-12 2005-06-29 范正 Steel fiber concrete anti-theft manhole cover
CN2739235Y (en) * 2004-11-09 2005-11-09 郝德青 Manhole cover seat for lifting inspection well
CN2832921Y (en) * 2005-08-05 2006-11-01 王明山 Multifunctional well-head enclosing device
JP4077071B2 (en) * 1998-04-14 2008-04-16 日之出水道機器株式会社 Manhole frame

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2081401U (en) * 1990-07-06 1991-07-24 王文质 High-adjustable anti-stealing checking well cover
CN2285324Y (en) * 1996-12-27 1998-07-01 许刚强 Height easyly adjustable frame for manhole cover
JP4077071B2 (en) * 1998-04-14 2008-04-16 日之出水道機器株式会社 Manhole frame
CN2594320Y (en) * 2003-01-15 2003-12-24 王仁基 Height adjustable perimeter crushproof safety well tools
CN2706518Y (en) * 2004-05-12 2005-06-29 范正 Steel fiber concrete anti-theft manhole cover
CN2739235Y (en) * 2004-11-09 2005-11-09 郝德青 Manhole cover seat for lifting inspection well
CN2832921Y (en) * 2005-08-05 2006-11-01 王明山 Multifunctional well-head enclosing device

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104060631A (en) * 2014-06-30 2014-09-24 南昌航空大学 Road well lid opening elevation dynamic control structure and construction method thereof
CN104060631B (en) * 2014-06-30 2016-02-03 南昌航空大学 A kind of manhole mouth elevation Dynamic controlling structure
CN104562906A (en) * 2014-12-30 2015-04-29 浙江联运环境工程有限公司 Device and method for repairing manhole cover
CN104562906B (en) * 2014-12-30 2016-05-04 浙江联运环境工程有限公司 A kind of for repairing device and the restorative procedure thereof of inspection well cover
CN106703083A (en) * 2017-01-24 2017-05-24 青岛工学院 Height-adjustable well lid
CN107604948A (en) * 2017-09-11 2018-01-19 浙江大成工程项目管理有限公司 A kind of municipal inspection shaft anti-settling structure and its construction method
CN107604948B (en) * 2017-09-11 2020-03-27 浙江大成工程项目管理有限公司 Municipal inspection well anti-settling structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN107059667B (en) Door shape assembled armored concrete box culvert and its construction method
CN110295627B (en) Construction method of road inspection well
CN101845825A (en) Calibration method for lifting of movable examination well shutter
CN102493487B (en) Method for constructing foundation slab embedded with concrete supports
KR100926173B1 (en) Piping structure and method for constructing the same
KR100743242B1 (en) Sinkging method of sink using precast
CN112575819A (en) Manhole cover reinforcing structure and method anchored by using dowel bars and existing pavement foundation
CN116856932A (en) Large-diameter prestress assembly vertical shaft structure containing glass fiber rib part and construction method
KR101259860B1 (en) Trench-type Water Conduit and Method for it
EP3394346B1 (en) Adapter
JP2010007348A (en) Method of temporarily paving manhole recessed area during repairing of manhole
CN107059531A (en) A kind of anti-settling pervious surface and its laying method
CN210002442U (en) novel municipal administration inspection shaft structure
JP6475554B2 (en) Construction method of shaft and construction method of underground storage tank
CN201280758Y (en) Road manhole
CN112813858A (en) Open type corrugated steel culvert structure and construction method thereof
CN205712185U (en) A kind of ladder spiral adjustable well lid of tooth
CN207419538U (en) A kind of height-adjustable inspection shaft covering system
CN206916777U (en) A kind of urban road Combined type safety inspection shaft
JP6402056B2 (en) Vertical shaft, underground storage tank, vertical shaft construction method and underground storage tank construction method
CN213805500U (en) Be used for prosthetic precast concrete structure of well lid settlement
CN211472023U (en) Town road escape canal
CN219930715U (en) Urban viaduct bent cap construction structure utilizing recyclable prefabricated foundation
CN216999855U (en) Anti-settling device for inspection well
CN214994144U (en) Uplift pile for subway station in water-rich stratum

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20100929