CN202627018U - Rigid protective retaining curtain wall - Google Patents
Rigid protective retaining curtain wall Download PDFInfo
- Publication number
- CN202627018U CN202627018U CN 201220222072 CN201220222072U CN202627018U CN 202627018 U CN202627018 U CN 202627018U CN 201220222072 CN201220222072 CN 201220222072 CN 201220222072 U CN201220222072 U CN 201220222072U CN 202627018 U CN202627018 U CN 202627018U
- Authority
- CN
- China
- Prior art keywords
- rigid
- curtain wall
- wall
- wall body
- body connecting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model provides a rigid protective retaining curtain wall. The rigid protective retaining curtain wall comprises a plurality of rows of ground anchors which are arranged on an edge slope from top to bottom, wherein the ground anchor of the bottommost row is vertically and fixedly provided with a rigid supporting frame; a protective layer is arranged at the outer side of the rigid supporting frame; a buffering cushion is arranged between the edge slope and the protective layer; upper and lower layers of wall body connecting transverse ribs are arranged at the inner side of the rigid supporting frame; a traction pull rod is arranged between the lower layer of the wall body connecting transverse rib and the ground anchor; a traction rope is arranged between the upper layer of the wall body connecting transverse rib and the ground anchor; a vertical top support is arranged at the lower part of the lower layer of the wall body connecting transverse rib; and an inclined support is arranged at the lower part of the upper layer of the wall body connecting transverse rib. The rigid protective retaining curtain wall disclosed by the utility model adopts field welding and binding, adjusts measures to local conditions, and is convenient and flexible to mount; the wall body connecting transverse ribs and bamboo boards are paved so that the stressing area of the a rigid protective retaining curtain wall can be enlarged, local concentrated stress is avoided, and crushed stone and earth slag are prevented from penetrating through the retaining curtain wall; and a supporting fixing manner of inner side traction, outer side top support and ground anchor anchoring is adopted so that a wall body is stable and reliable and the impact resistance is strong.
Description
Technical field
The utility model relates to safety, environmental-protection device in a kind of slope excavation engineering, and particularly a kind of rigid protection keeps off native curtain wall.
Background technology
In the slope excavation engineering construction; Usually the phenomenon and the requirement of guaranteeing construction part below road that have working face cross-operation up and down; Construction safety, environmental protection problem are given prominence to; Particularly in deep high mountain and steep gorge area, side slope is precipitous, and practical, reliable safety prevention measure is the necessary condition that the slope excavation engineering is carried out smoothly.
Summary of the invention
The utility model technical problem to be solved provides a kind of slope excavation construction and keeps off native curtain wall with rigid protection, can install according to the job site orographic condition, through increasing the lifting surface area of the native curtain wall of retaining; Avoid local pressure to concentrate, it is reliably firm to keep off native curtain wall, and can prevent that the gravelly soil slag from passing the native curtain wall of retaining; Effectively improve safety, environmental-protection effect, and install, change tear open simple to operation, can with the supporting use of on-the-spot other protective equipment; Construction speed is fast, and cost is lower.
The purpose of the utility model is achieved in that
A kind of rigid protection keeps off native curtain wall; It is included in the many rows earth anchor that is provided with from bottom to up on the side slope, descends most and vertically is installed with rigid cage on row's earth anchor, and the rigid cage outside is provided with overcoat; Be provided with cushion pad between side slope and the overcoat; The rigid cage inboard is provided with up and down two-layer body of wall and connects horizontal bar, is provided with drawing pull bar between lower floor's body of wall connection horizontal bar and the earth anchor, is provided with pull rope between upper strata body of wall connection horizontal muscle and the earth anchor; Lower floor body of wall connection horizontal bar bottom is provided with vertically shores, and body of wall connection horizontal muscle bottom, upper strata is provided with diagonal brace.
Above-mentioned pull rope is provided with many groups at interval, and every group is 2, is separately fixed on the different earth anchors, and the angle of two pull rope formation is less than or equal to 60 degree.
Above-mentioned body of wall connects horizontal bar and ties up weldering by two steel pipes up and down and form.
Above-mentioned earth anchor length is 1.5-2.0m.
Technique effect below the utility model has been obtained:
The rigid protection that the utility model provides keeps off native curtain wall; Adopt field Welding and colligation; It is easy for installation flexible to suit measures to local conditions, and body of wall connects horizontal bar and Bamboo strip plate is mated formation through being provided with, and can increase the lifting surface area that rigidity is kept off native curtain wall; Avoid local pressure to concentrate, and can prevent that the gravelly soil slag from passing the native curtain wall of retaining; Adopt the support fixation mode of " shore in interior side-lining, the outside, earth anchor anchoring ", the body of wall secure, anti-impact force is strong; And most of mounting material can repeatedly change tears repeated use open; When effectively improving safety, environmental-protection effect, also reduce construction cost, accelerated construction speed.
Description of drawings
Below in conjunction with accompanying drawing and embodiment the utility model is described further.
Fig. 1 is the front view of the utility model apparatus structure;
Fig. 2 is the lateral view of Fig. 1.
The specific embodiment
A kind of rigid protection keeps off native curtain wall shown in Fig. 1-2; It is included in the many rows earth anchor 7 that is provided with from bottom to up on the side slope 10, descends most and vertically is installed with rigid cage 1 on row's earth anchor, and the rigid cage outside is provided with overcoat 2; Be provided with cushion pad 8 between side slope and the overcoat; The rigid cage inboard is provided with up and down two-layer body of wall and connects horizontal bar 6, is provided with drawing pull bar 5 between lower floor's body of wall connection horizontal bar and the earth anchor, is provided with pull rope 4 between upper strata body of wall connection horizontal muscle and the earth anchor; Lower floor body of wall connection horizontal bar bottom is provided with vertically shores 9, and body of wall connection horizontal muscle bottom, upper strata is provided with diagonal brace 3.
Preferably, described pull rope is provided with many groups at interval, and every group is 2, is separately fixed on the different earth anchors, and the angle of two pull rope formation is less than or equal to 60 degree.Described body of wall connects horizontal bar and ties up weldering by two steel pipes up and down and form.Described earth anchor length is 1.5-2.0m.
The implementation step of the utility model is following:
1, φ 38 round steel of imbedding long 1.5~2.0m after the boring of employing hammer drill are as earth anchor 7 joint bars, convenient and quick construction;
2, on earth anchor 7 joint bar φ 38mm round steel, weld I20b, height 6.0m forms the vertical rigid support of keeping off native curtain wall; Adopt I18a that the I20b bottom is welded into a whole; Adopt φ 22mm rebar spacing 0.25m that vertical rigid support is welded into integral body, form rigid cage 1;
3, with Bamboo strip plate adopt φ 22mm reinforcing bar tie up bar (spacing 2.0m) divide 1~3 layer mat formation, colligation is inboard in rigid cage, forms overcoat 2, local colligation tire is as buffering;
4, adopt two φ 50mm thick walled steel tubes to tie up weldering and form body of wall and connect horizontal bar 6, respectively in rigid cage middle and lower part, the outside and one group of each colligation of middle and upper part;
5, adopt 3 I20b of the φ every spacing of 18mm wire rope that one group of pull rope 4 is set; After φ 18mm steel wire penetrating is kept off the body of wall connection horizontal bar 6 of native curtain wall middle and upper part; Traction is anchored on earth anchor 7 joint bars, and every group of pull rope 4 passes the angle that forms behind the body of wall connection horizontal bar 6 and should be not more than 60 °;
6, adopt 3 I20b of the φ every spacing of 22mm reinforcing bar that one group of drawing pull bar 5 is set, after every φ 22mm reinforcing bar passed the body of wall connection horizontal bar 6 of the native curtain wall of retaining middle and lower part, hard connection traction was anchored on earth anchor 7 joint bars;
7, side slope adopts the I18a i iron to stay on the bottom of the body of wall connection horizontal bar 6 in the native curtain wall of the retaining outside down, and every spacing 1.2m is provided with 1 I18a and shores; The inboard φ 50mm thick walled steel tube that adopts of I18a is made the twice diagonal brace simultaneously, prevents that I18a from shoring stress deformation.
8, before rigidity was kept off native curtain wall use, side (going up the side slope position) was filled loose material within it in advance, like straw bag, slag charge etc., during excavation, before the native curtain wall of retaining, formed certain buffering; In the digging process, before buffer strip, build a groove earlier, keep the excavation slag charge to drop in the ditch.
Claims (4)
1. a rigid protection keeps off native curtain wall; It is characterized in that: it is included in the many rows earth anchor (7) that is provided with from bottom to up on the side slope (10), descends most and vertically is installed with rigid cage (1) on row's earth anchor, and the rigid cage outside is provided with overcoat (2); Be provided with cushion pad (8) between side slope and the overcoat; The rigid cage inboard is provided with up and down two-layer body of wall and connects horizontal bar (6), is provided with drawing pull bar (5) between lower floor's body of wall connection horizontal bar and the earth anchor, is provided with pull rope (4) between upper strata body of wall connection horizontal muscle and the earth anchor; Lower floor body of wall connection horizontal bar bottom is provided with vertically shores (9), and body of wall connection horizontal muscle bottom, upper strata is provided with diagonal brace (3).
2. rigid protection according to claim 1 keeps off native curtain wall, it is characterized in that: described pull rope is provided with many groups at interval, and every group is 2, is separately fixed on the different earth anchors, and the angle of two pull rope formation is less than or equal to 60 degree.
3. rigid protection according to claim 1 and 2 keeps off native curtain wall, it is characterized in that: described body of wall connects horizontal bar and ties up weldering by two steel pipes up and down and form.
4. rigid protection according to claim 1 and 2 keeps off native curtain wall, it is characterized in that: described earth anchor length is 1.5-2.0m.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220222072 CN202627018U (en) | 2012-05-17 | 2012-05-17 | Rigid protective retaining curtain wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220222072 CN202627018U (en) | 2012-05-17 | 2012-05-17 | Rigid protective retaining curtain wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202627018U true CN202627018U (en) | 2012-12-26 |
Family
ID=47380229
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220222072 Expired - Fee Related CN202627018U (en) | 2012-05-17 | 2012-05-17 | Rigid protective retaining curtain wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202627018U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104912088A (en) * | 2014-03-11 | 2015-09-16 | 葛洲坝集团基础工程有限公司 | Slope protection structure and construction method thereof |
-
2012
- 2012-05-17 CN CN 201220222072 patent/CN202627018U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104912088A (en) * | 2014-03-11 | 2015-09-16 | 葛洲坝集团基础工程有限公司 | Slope protection structure and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106522242B (en) | For soft stratum close to underground structure foundation pit supporting system construction method | |
CN104404861A (en) | Steel trestle provided with steel anchor pile and construction method of steel trestle | |
CN203034464U (en) | Truss type foundation pit supporting structure | |
CN106759376B (en) | For closing on the construction method of the Anchored Sheet Pile Wall for Excavation system of existing underground structure | |
CN104912088A (en) | Slope protection structure and construction method thereof | |
CN111021373A (en) | Slope reinforcing apparatus for building municipal works | |
CN108442232A (en) | Assembled steel suspension bridge structure and its construction method | |
CN108708284B (en) | A kind of steel trestle construction method for resisting flood discharge bed scour | |
CN109667273A (en) | A kind of construction method of deep foundation pit supporting structure | |
CN103306295A (en) | Rigid frame pile supporting and blocking structure | |
CN206035505U (en) | Stride across hangar tunnel structure of debris flow gully | |
CN202627018U (en) | Rigid protective retaining curtain wall | |
CN108951647A (en) | Construction method for supporting is excavated in hole in the hole of open trench tunnel | |
CN105821771B (en) | Overlength case bridge jacking construction technique and its constructing structure under high roadbed city expressway | |
CN207538068U (en) | A kind of high slope framed revetment | |
CN205676918U (en) | A kind of underlying structure of tower crane steel Platform pipe column foundation | |
JP5032255B2 (en) | Rockfall protection and avalanche prevention facility | |
CN206376274U (en) | A kind of single-pile elevated bearing-platform and anchor cable tower-crane foundation structure | |
CN214328330U (en) | Ramp way back pressure embankment deformation control structure | |
CN106223344B (en) | A kind of ground line piled anchor frame foundation pit supporting method | |
JP5504951B2 (en) | Seismic reinforcement method for structures and seismic reinforcement structure for structures | |
CN210033432U (en) | Reinforcing structure for shield tunnel to penetrate existing building | |
CN211446971U (en) | Combined supporting structure for fissure development rock slope | |
CN210214570U (en) | Tower crane slide rail mounting structure | |
CN206408631U (en) | Anchored Sheet Pile Wall for Excavation system for closing on existing underground structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20121226 Termination date: 20200517 |