CN202627018U - Rigid protective retaining curtain wall - Google Patents

Rigid protective retaining curtain wall Download PDF

Info

Publication number
CN202627018U
CN202627018U CN 201220222072 CN201220222072U CN202627018U CN 202627018 U CN202627018 U CN 202627018U CN 201220222072 CN201220222072 CN 201220222072 CN 201220222072 U CN201220222072 U CN 201220222072U CN 202627018 U CN202627018 U CN 202627018U
Authority
CN
China
Prior art keywords
rigid
curtain wall
wall
wall body
body connecting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220222072
Other languages
Chinese (zh)
Inventor
童耀
谭登国
张玉莉
刘宏生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GEZHOUBA GROUP FOUNDATION ENGINEERING Co Ltd
Original Assignee
GEZHOUBA GROUP FOUNDATION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GEZHOUBA GROUP FOUNDATION ENGINEERING Co Ltd filed Critical GEZHOUBA GROUP FOUNDATION ENGINEERING Co Ltd
Priority to CN 201220222072 priority Critical patent/CN202627018U/en
Application granted granted Critical
Publication of CN202627018U publication Critical patent/CN202627018U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model provides a rigid protective retaining curtain wall. The rigid protective retaining curtain wall comprises a plurality of rows of ground anchors which are arranged on an edge slope from top to bottom, wherein the ground anchor of the bottommost row is vertically and fixedly provided with a rigid supporting frame; a protective layer is arranged at the outer side of the rigid supporting frame; a buffering cushion is arranged between the edge slope and the protective layer; upper and lower layers of wall body connecting transverse ribs are arranged at the inner side of the rigid supporting frame; a traction pull rod is arranged between the lower layer of the wall body connecting transverse rib and the ground anchor; a traction rope is arranged between the upper layer of the wall body connecting transverse rib and the ground anchor; a vertical top support is arranged at the lower part of the lower layer of the wall body connecting transverse rib; and an inclined support is arranged at the lower part of the upper layer of the wall body connecting transverse rib. The rigid protective retaining curtain wall disclosed by the utility model adopts field welding and binding, adjusts measures to local conditions, and is convenient and flexible to mount; the wall body connecting transverse ribs and bamboo boards are paved so that the stressing area of the a rigid protective retaining curtain wall can be enlarged, local concentrated stress is avoided, and crushed stone and earth slag are prevented from penetrating through the retaining curtain wall; and a supporting fixing manner of inner side traction, outer side top support and ground anchor anchoring is adopted so that a wall body is stable and reliable and the impact resistance is strong.

Description

A kind of rigid protection keeps off native curtain wall
Technical field
The utility model relates to safety, environmental-protection device in a kind of slope excavation engineering, and particularly a kind of rigid protection keeps off native curtain wall.
Background technology
In the slope excavation engineering construction; Usually the phenomenon and the requirement of guaranteeing construction part below road that have working face cross-operation up and down; Construction safety, environmental protection problem are given prominence to; Particularly in deep high mountain and steep gorge area, side slope is precipitous, and practical, reliable safety prevention measure is the necessary condition that the slope excavation engineering is carried out smoothly.
Summary of the invention
The utility model technical problem to be solved provides a kind of slope excavation construction and keeps off native curtain wall with rigid protection, can install according to the job site orographic condition, through increasing the lifting surface area of the native curtain wall of retaining; Avoid local pressure to concentrate, it is reliably firm to keep off native curtain wall, and can prevent that the gravelly soil slag from passing the native curtain wall of retaining; Effectively improve safety, environmental-protection effect, and install, change tear open simple to operation, can with the supporting use of on-the-spot other protective equipment; Construction speed is fast, and cost is lower.
The purpose of the utility model is achieved in that
A kind of rigid protection keeps off native curtain wall; It is included in the many rows earth anchor that is provided with from bottom to up on the side slope, descends most and vertically is installed with rigid cage on row's earth anchor, and the rigid cage outside is provided with overcoat; Be provided with cushion pad between side slope and the overcoat; The rigid cage inboard is provided with up and down two-layer body of wall and connects horizontal bar, is provided with drawing pull bar between lower floor's body of wall connection horizontal bar and the earth anchor, is provided with pull rope between upper strata body of wall connection horizontal muscle and the earth anchor; Lower floor body of wall connection horizontal bar bottom is provided with vertically shores, and body of wall connection horizontal muscle bottom, upper strata is provided with diagonal brace.
Above-mentioned pull rope is provided with many groups at interval, and every group is 2, is separately fixed on the different earth anchors, and the angle of two pull rope formation is less than or equal to 60 degree.
Above-mentioned body of wall connects horizontal bar and ties up weldering by two steel pipes up and down and form.
Above-mentioned earth anchor length is 1.5-2.0m.
Technique effect below the utility model has been obtained:
The rigid protection that the utility model provides keeps off native curtain wall; Adopt field Welding and colligation; It is easy for installation flexible to suit measures to local conditions, and body of wall connects horizontal bar and Bamboo strip plate is mated formation through being provided with, and can increase the lifting surface area that rigidity is kept off native curtain wall; Avoid local pressure to concentrate, and can prevent that the gravelly soil slag from passing the native curtain wall of retaining; Adopt the support fixation mode of " shore in interior side-lining, the outside, earth anchor anchoring ", the body of wall secure, anti-impact force is strong; And most of mounting material can repeatedly change tears repeated use open; When effectively improving safety, environmental-protection effect, also reduce construction cost, accelerated construction speed.
Description of drawings
Below in conjunction with accompanying drawing and embodiment the utility model is described further.
Fig. 1 is the front view of the utility model apparatus structure;
Fig. 2 is the lateral view of Fig. 1.
The specific embodiment
A kind of rigid protection keeps off native curtain wall shown in Fig. 1-2; It is included in the many rows earth anchor 7 that is provided with from bottom to up on the side slope 10, descends most and vertically is installed with rigid cage 1 on row's earth anchor, and the rigid cage outside is provided with overcoat 2; Be provided with cushion pad 8 between side slope and the overcoat; The rigid cage inboard is provided with up and down two-layer body of wall and connects horizontal bar 6, is provided with drawing pull bar 5 between lower floor's body of wall connection horizontal bar and the earth anchor, is provided with pull rope 4 between upper strata body of wall connection horizontal muscle and the earth anchor; Lower floor body of wall connection horizontal bar bottom is provided with vertically shores 9, and body of wall connection horizontal muscle bottom, upper strata is provided with diagonal brace 3.
Preferably, described pull rope is provided with many groups at interval, and every group is 2, is separately fixed on the different earth anchors, and the angle of two pull rope formation is less than or equal to 60 degree.Described body of wall connects horizontal bar and ties up weldering by two steel pipes up and down and form.Described earth anchor length is 1.5-2.0m.
The implementation step of the utility model is following:
1, φ 38 round steel of imbedding long 1.5~2.0m after the boring of employing hammer drill are as earth anchor 7 joint bars, convenient and quick construction;
2, on earth anchor 7 joint bar φ 38mm round steel, weld I20b, height 6.0m forms the vertical rigid support of keeping off native curtain wall; Adopt I18a that the I20b bottom is welded into a whole; Adopt φ 22mm rebar spacing 0.25m that vertical rigid support is welded into integral body, form rigid cage 1;
3, with Bamboo strip plate adopt φ 22mm reinforcing bar tie up bar (spacing 2.0m) divide 1~3 layer mat formation, colligation is inboard in rigid cage, forms overcoat 2, local colligation tire is as buffering;
4, adopt two φ 50mm thick walled steel tubes to tie up weldering and form body of wall and connect horizontal bar 6, respectively in rigid cage middle and lower part, the outside and one group of each colligation of middle and upper part;
5, adopt 3 I20b of the φ every spacing of 18mm wire rope that one group of pull rope 4 is set; After φ 18mm steel wire penetrating is kept off the body of wall connection horizontal bar 6 of native curtain wall middle and upper part; Traction is anchored on earth anchor 7 joint bars, and every group of pull rope 4 passes the angle that forms behind the body of wall connection horizontal bar 6 and should be not more than 60 °;
6, adopt 3 I20b of the φ every spacing of 22mm reinforcing bar that one group of drawing pull bar 5 is set, after every φ 22mm reinforcing bar passed the body of wall connection horizontal bar 6 of the native curtain wall of retaining middle and lower part, hard connection traction was anchored on earth anchor 7 joint bars;
7, side slope adopts the I18a i iron to stay on the bottom of the body of wall connection horizontal bar 6 in the native curtain wall of the retaining outside down, and every spacing 1.2m is provided with 1 I18a and shores; The inboard φ 50mm thick walled steel tube that adopts of I18a is made the twice diagonal brace simultaneously, prevents that I18a from shoring stress deformation.
8, before rigidity was kept off native curtain wall use, side (going up the side slope position) was filled loose material within it in advance, like straw bag, slag charge etc., during excavation, before the native curtain wall of retaining, formed certain buffering; In the digging process, before buffer strip, build a groove earlier, keep the excavation slag charge to drop in the ditch.

Claims (4)

1. a rigid protection keeps off native curtain wall; It is characterized in that: it is included in the many rows earth anchor (7) that is provided with from bottom to up on the side slope (10), descends most and vertically is installed with rigid cage (1) on row's earth anchor, and the rigid cage outside is provided with overcoat (2); Be provided with cushion pad (8) between side slope and the overcoat; The rigid cage inboard is provided with up and down two-layer body of wall and connects horizontal bar (6), is provided with drawing pull bar (5) between lower floor's body of wall connection horizontal bar and the earth anchor, is provided with pull rope (4) between upper strata body of wall connection horizontal muscle and the earth anchor; Lower floor body of wall connection horizontal bar bottom is provided with vertically shores (9), and body of wall connection horizontal muscle bottom, upper strata is provided with diagonal brace (3).
2. rigid protection according to claim 1 keeps off native curtain wall, it is characterized in that: described pull rope is provided with many groups at interval, and every group is 2, is separately fixed on the different earth anchors, and the angle of two pull rope formation is less than or equal to 60 degree.
3. rigid protection according to claim 1 and 2 keeps off native curtain wall, it is characterized in that: described body of wall connects horizontal bar and ties up weldering by two steel pipes up and down and form.
4. rigid protection according to claim 1 and 2 keeps off native curtain wall, it is characterized in that: described earth anchor length is 1.5-2.0m.
CN 201220222072 2012-05-17 2012-05-17 Rigid protective retaining curtain wall Expired - Fee Related CN202627018U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220222072 CN202627018U (en) 2012-05-17 2012-05-17 Rigid protective retaining curtain wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220222072 CN202627018U (en) 2012-05-17 2012-05-17 Rigid protective retaining curtain wall

Publications (1)

Publication Number Publication Date
CN202627018U true CN202627018U (en) 2012-12-26

Family

ID=47380229

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220222072 Expired - Fee Related CN202627018U (en) 2012-05-17 2012-05-17 Rigid protective retaining curtain wall

Country Status (1)

Country Link
CN (1) CN202627018U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104912088A (en) * 2014-03-11 2015-09-16 葛洲坝集团基础工程有限公司 Slope protection structure and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104912088A (en) * 2014-03-11 2015-09-16 葛洲坝集团基础工程有限公司 Slope protection structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN106522242B (en) For soft stratum close to underground structure foundation pit supporting system construction method
CN104404861A (en) Steel trestle provided with steel anchor pile and construction method of steel trestle
CN203034464U (en) Truss type foundation pit supporting structure
CN106759376B (en) For closing on the construction method of the Anchored Sheet Pile Wall for Excavation system of existing underground structure
CN104912088A (en) Slope protection structure and construction method thereof
CN111021373A (en) Slope reinforcing apparatus for building municipal works
CN108442232A (en) Assembled steel suspension bridge structure and its construction method
CN108708284B (en) A kind of steel trestle construction method for resisting flood discharge bed scour
CN109667273A (en) A kind of construction method of deep foundation pit supporting structure
CN103306295A (en) Rigid frame pile supporting and blocking structure
CN206035505U (en) Stride across hangar tunnel structure of debris flow gully
CN202627018U (en) Rigid protective retaining curtain wall
CN108951647A (en) Construction method for supporting is excavated in hole in the hole of open trench tunnel
CN105821771B (en) Overlength case bridge jacking construction technique and its constructing structure under high roadbed city expressway
CN207538068U (en) A kind of high slope framed revetment
CN205676918U (en) A kind of underlying structure of tower crane steel Platform pipe column foundation
JP5032255B2 (en) Rockfall protection and avalanche prevention facility
CN206376274U (en) A kind of single-pile elevated bearing-platform and anchor cable tower-crane foundation structure
CN214328330U (en) Ramp way back pressure embankment deformation control structure
CN106223344B (en) A kind of ground line piled anchor frame foundation pit supporting method
JP5504951B2 (en) Seismic reinforcement method for structures and seismic reinforcement structure for structures
CN210033432U (en) Reinforcing structure for shield tunnel to penetrate existing building
CN211446971U (en) Combined supporting structure for fissure development rock slope
CN210214570U (en) Tower crane slide rail mounting structure
CN206408631U (en) Anchored Sheet Pile Wall for Excavation system for closing on existing underground structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121226

Termination date: 20200517