CN202620638U - Expanding comprehensive training device - Google Patents
Expanding comprehensive training device Download PDFInfo
- Publication number
- CN202620638U CN202620638U CN 201220301387 CN201220301387U CN202620638U CN 202620638 U CN202620638 U CN 202620638U CN 201220301387 CN201220301387 CN 201220301387 CN 201220301387 U CN201220301387 U CN 201220301387U CN 202620638 U CN202620638 U CN 202620638U
- Authority
- CN
- China
- Prior art keywords
- column
- cross coupling
- horizontal beam
- center stand
- upright post
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Ladders (AREA)
Abstract
The utility model disclose an expanding comprehensive training device, which comprises upright posts, and horizontal beams and crossed beams on the tops of the upright posts, wherein a high-level concentric bridge is arranged among the first upright post, the second upright post and the first horizontal beam; a climbing wall is arranged among the second upright post, the third upright post and the second horizontal beam; a walking platform is arranged among the third upright post, the fourth upright post and the third horizontal beam; a broken bridge is arranged among the fourth upright post, the first upright post and the fourth horizontal beam; a giant ladder is arranged among the fourth upright post, the central upright post and the first crossed beam; a high-level lever is arranged among the first upright post, the central upright post and the second crossed beam; a child broken bridge is arranged among the second upright post, the central upright post and the third crossed beam; and a child lever is arranged among the third upright post, the central upright post and the fourth crossed beam. The expanding comprehensive training device has the advantages of simple structure, attractive appearance, capability of saving a large quantity of raw materials, and small floor area.
Description
Technical field
The utility model belongs to the body-building apparatus technical field, particularly a kind of expansion combined training equipment.
Background technology
At present, according to traditional way, every suit body-building apparatus all need two high be 10 meters, diameter be 0.22 meter seamless steel pipe as column, if make eight cover equipment then need ten six roots of sensation seamless steel pipes, waste raw material, and need take a large amount of training courts.
The utility model content
The utility model provide a kind of simple in structure, be convenient to implement and expansion combined training equipment with low cost.
For realizing above-mentioned purpose; The technical scheme of the utility model is: a kind of expansion combined training equipment; Comprise the horizontal beam and the cross coupling at column and column top, cross coupling is positioned at horizontal beam inside, and column comprises first column, second column, the 3rd column, the 4th column and center stand column; Horizontal beam comprises first horizontal beam, second horizontal beam, the 3rd horizontal beam and the 4th horizontal beam, and cross coupling comprises first cross coupling, second cross coupling, the 3rd cross coupling and the 4th cross coupling; Be provided with the concentric bridge in high-altitude between first column, second column and first horizontal beam; Be provided with Pan Yaqiang between second column, the 3rd column and second horizontal beam; Be provided with A Walk in the Clouds between the 3rd column, the 4th column and the 3rd horizontal beam; Be provided with bridge cut-off between the 4th column, first column and the 4th horizontal beam; Be provided with giant's ladder between the 4th column, center stand column and first cross coupling; Be provided with the high-altitude between first column, center stand column and second cross coupling and grab thick stick; Be provided with children's bridge cut-off between second column, center stand column and the 3rd cross coupling; Be provided with children between the 3rd column, center stand column and the 4th cross coupling and grab thick stick.
The concentric bridge in said high-altitude comprises the walking rope of being located between first column and second column and protection rope, and the walking rope ends is provided with half space through support.
Said Pan Yaqiang comprises the connecting rod of being located between second column and the 3rd column and protection rope, and connecting rod is provided with climbs the precipice metope, climbs the precipice metope and is provided with handgrip and wooden pawl, climbs metope bottom, precipice and is provided with support.
Said A Walk in the Clouds comprises the walking rope of being located between the 3rd column and the 4th column and protection rope, is interval with pedal on the walking rope, and the walking rope ends is provided with half space through support.
Said bridge cut-off comprises the protection rope of being located between the 4th column and first column, and the 4th column and the first column top are provided with relative bridge cut-off face through diagonal brace respectively.
Said giant's ladder comprises the connection anchor ear on first cross coupling, connects anchor ear and is provided with rope ladder.
Said high-altitude is grabbed thick stick and is comprised the connection anchor ear on second cross coupling, and the connection anchor ear is provided with through chain sling grabs thick stick, grabs the thick stick below and is provided with preparation platform column, prepares platform column upper end and is provided with the preparation platform; Be provided with the protection rope between first column and the center stand column; Center stand column is provided with and prepares the half space of height such as platform grade.
Said children's bridge cut-off comprises the floorings that second column and center stand column middle part are oppositely arranged, and bridge cut-off face below is provided with diagonal brace; Be provided with the protection rope between second column and the center stand column.
Said children grab thick stick and comprise the connection anchor ear on the 4th cross coupling, and the connection anchor ear is provided with through chain sling grabs thick stick, and center stand column is provided with the half space towards the 3rd column; Be provided with the protection rope between the 3rd column and the center stand column.
Be respectively equipped with pedal on said first column, second column, the 3rd column, the 4th column and the center stand column.
Compared with prior art, the utility model has the advantages that:
1, the utility model comprises the horizontal beam and the cross coupling at column and column top; Cross coupling is positioned at horizontal beam inside; Column comprises first column, second column, the 3rd column, the 4th column and center stand column; Horizontal beam comprises first horizontal beam, second horizontal beam, the 3rd horizontal beam and the 4th horizontal beam, and cross coupling comprises first cross coupling, second cross coupling, the 3rd cross coupling and the 4th cross coupling; Be provided with the concentric bridge in high-altitude between first column, second column and first horizontal beam; Be provided with Pan Yaqiang between second column, the 3rd column and second horizontal beam; Be provided with A Walk in the Clouds between the 3rd column, the 4th column and the 3rd horizontal beam; Be provided with bridge cut-off between the 4th column, first column and the 4th horizontal beam; Be provided with giant's ladder between the 4th column, center stand column and first cross coupling; Be provided with the high-altitude between first column, center stand column and second cross coupling and grab thick stick; Be provided with children's bridge cut-off between second column, center stand column and the 3rd cross coupling; Be provided with children between the 3rd column, center stand column and the 4th cross coupling and grab thick stick, it is simple in structure, and good looking appearance is convenient to implement; Can practice thrift a large amount of raw material, reduce manufacturing cost, can improve stock utilization; Structural strength is high, and floor space is little, can save the land resource of a large amount of preciousnesses.
2, in the utility model, be provided with children's bridge cut-off and children especially and grab thick stick, also be fit to children and use, all-ages, the scope of application is wide.
Description of drawings
Fig. 1 is the structural representation of the utility model;
Fig. 2 is the structural representation of the concentric bridge of Fig. 1 high and medium;
Fig. 3 is the structural representation of Pan Yaqiang among Fig. 1;
The structural representation of Fig. 4 for strolling in Fig. 1 medium cloud;
Fig. 5 is the structural representation of bridge cut-off among Fig. 1;
Fig. 6 is the structural representation of giant's ladder among Fig. 1;
Fig. 7 grabs the structural representation of thick stick for Fig. 1 high and medium;
Fig. 8 is the structural representation of children's bridge cut-off among Fig. 1;
Fig. 9 grabs the structural representation of thick stick for children among Fig. 1.
The specific embodiment
Expansion combined training equipment as shown in Figure 1; It comprises the horizontal beam and the cross coupling at column and column top; Cross coupling is positioned at horizontal beam inside; Column comprises first column 11, second column 12, the 3rd column 13, the 4th column 14 and center stand column 15, and horizontal beam comprises first horizontal beam 21, second horizontal beam 22, the 3rd horizontal beam 23 and the 4th horizontal beam 24, and cross coupling comprises first cross coupling 31, second cross coupling 32, the 3rd cross coupling 33 and the 4th cross coupling 34.On first column 11, second column 12, the 3rd column 13, the 4th column 14 and center stand column 15, be respectively equipped with pedal 9.
As shown in Figure 2; Be provided with the concentric bridge in high-altitude between first column 11, second column 12 and first horizontal beam 21; The concentric bridge in high-altitude comprises the walking rope of being located between first column 11 and second column 12 16 and protection rope 17, and walking rope 16 two ends are provided with half space 19 through support 18.
As shown in Figure 3; Be provided with Pan Yaqiang between second column 12, the 3rd column 13 and second horizontal beam 22; Pan Yaqiang comprises the connecting rod of being located between second column 12 and the 3rd column 13 25 and protection rope 26; Connecting rod 25 is provided with climbs precipice metope 27, climbs precipice metope 27 and is provided with handgrip 28 and wooden pawl 29, climbs metope bottom, precipice and is provided with support 20.
As shown in Figure 4; Be provided with A Walk in the Clouds between the 3rd column 13, the 4th column 14 and the 3rd horizontal beam 23; A Walk in the Clouds comprises the walking rope of being located between the 3rd column 13 and the 4th column 14 35 and protection rope 36; Be interval with pedal 37 on the walking rope 35, walking rope 35 two ends are provided with half space 39 through support 38.
As shown in Figure 5; Be provided with bridge cut-off between the 4th column 14, first column 11 and the 4th horizontal beam 24; Bridge cut-off comprises that protection rope 41, the four columns 14 and first column, 11 tops be located between the 4th column 14 and first column 11 are provided with relative bridge cut-off face 43 through diagonal brace 42 respectively.
As shown in Figure 6, be provided with giant's ladder between the 4th column 14, center stand column 15 and first cross coupling 31, giant's ladder comprises the connection anchor ear 51 on first cross coupling 31, connects anchor ear 51 and is provided with rope ladder 52.
As shown in Figure 7; Be provided with the high-altitude between first column 11, center stand column 15 and second cross coupling 32 and grab thick stick; The high-altitude is grabbed thick stick and is comprised the connection anchor ear 61 on second cross coupling 32; Connection anchor ear 61 is provided with through chain sling 62 grabs thick stick 63, grabs thick stick 63 belows and is provided with preparation platform column 64, prepares platform column 64 upper ends and is provided with preparation platform 65.Between first column 11 and center stand column 15, be provided with protection rope 66.Center stand column 15 is provided with and prepares the half space 67 of platform 65 height such as grade.
As shown in Figure 8, be provided with children's bridge cut-off between second column 12, center stand column 15 and the 3rd cross coupling 33, children's bridge cut-off comprises the floorings 71 that second column 12 and center stand column 15 middle parts are oppositely arranged, bridge cut-off face 71 belows are provided with diagonal brace 72.Between second column 12 and center stand column 15, be provided with protection rope 73.
As shown in Figure 9, be provided with children between the 3rd column 13, center stand column 15 and the 4th cross coupling 34 and grab thick stick, children grab thick stick and comprise the connection anchor ear 81 on the 4th cross coupling 34, connect anchor ear 81 and are provided with through chain sling 82 and grab thick stick 83.Between half space 84, the three columns 13 of the 3rd column 13 and center stand column 15, be provided with protection rope 85 being provided with on the center stand column 15.
Claims (10)
1. expand the combined training equipment for one kind; It is characterized in that: the horizontal beam and the cross coupling that comprise column and column top; Cross coupling is positioned at horizontal beam inside; Column comprises first column, second column, the 3rd column, the 4th column and center stand column, and horizontal beam comprises first horizontal beam, second horizontal beam, the 3rd horizontal beam and the 4th horizontal beam, and cross coupling comprises first cross coupling, second cross coupling, the 3rd cross coupling and the 4th cross coupling; Be provided with the concentric bridge in high-altitude between first column, second column and first horizontal beam; Be provided with Pan Yaqiang between second column, the 3rd column and second horizontal beam; Be provided with A Walk in the Clouds between the 3rd column, the 4th column and the 3rd horizontal beam; Be provided with bridge cut-off between the 4th column, first column and the 4th horizontal beam; Be provided with giant's ladder between the 4th column, center stand column and first cross coupling; Be provided with the high-altitude between first column, center stand column and second cross coupling and grab thick stick; Be provided with children's bridge cut-off between second column, center stand column and the 3rd cross coupling; Be provided with children between the 3rd column, center stand column and the 4th cross coupling and grab thick stick.
2. expansion combined training equipment as claimed in claim 1 is characterized in that: the concentric bridge in said high-altitude comprises the walking rope of being located between first column and second column and protection rope, and the walking rope ends is provided with half space through support.
3. expansion combined training equipment as claimed in claim 1; It is characterized in that: said Pan Yaqiang comprises the connecting rod of being located between second column and the 3rd column and protection rope; Connecting rod is provided with climbs the precipice metope, climbs the precipice metope and is provided with handgrip and wooden pawl, climbs metope bottom, precipice and is provided with support.
4. expansion combined training equipment as claimed in claim 1; It is characterized in that: said A Walk in the Clouds comprises the walking rope of being located between the 3rd column and the 4th column and protection rope; Be interval with pedal on the walking rope, the walking rope ends is provided with half space through support.
5. expansion combined training equipment as claimed in claim 1 is characterized in that: said bridge cut-off comprises the protection rope of being located between the 4th column and first column, and the 4th column and the first column top are provided with relative bridge cut-off face through diagonal brace respectively.
6. expansion combined training equipment as claimed in claim 1 is characterized in that: said giant's ladder comprises the connection anchor ear on first cross coupling, connects anchor ear and is provided with rope ladder.
7. expansion combined training equipment as claimed in claim 1; It is characterized in that: said high-altitude is grabbed thick stick and is comprised the connection anchor ear on second cross coupling; The connection anchor ear is provided with through chain sling grabs thick stick, grabs the thick stick below and is provided with preparation platform column, prepares platform column upper end and is provided with the preparation platform; Be provided with the protection rope between first column and the center stand column; Center stand column is provided with and prepares the half space of height such as platform grade.
8. expansion combined training equipment as claimed in claim 1 is characterized in that: said children's bridge cut-off comprises the floorings that second column and center stand column middle part are oppositely arranged, and bridge cut-off face below is provided with diagonal brace; Be provided with the protection rope between second column and the center stand column.
9. expansion combined training equipment as claimed in claim 1 is characterized in that: said children grab thick stick and comprise the connection anchor ear on the 4th cross coupling, and the connection anchor ear is provided with through chain sling grabs thick stick, and center stand column is provided with the half space towards the 3rd column; Be provided with the protection rope between the 3rd column and the center stand column.
10. like arbitrary described expansion combined training equipment among the claim 1-9, it is characterized in that: be respectively equipped with pedal on said first column, second column, the 3rd column, the 4th column and the center stand column.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220301387 CN202620638U (en) | 2012-06-26 | 2012-06-26 | Expanding comprehensive training device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220301387 CN202620638U (en) | 2012-06-26 | 2012-06-26 | Expanding comprehensive training device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202620638U true CN202620638U (en) | 2012-12-26 |
Family
ID=47373886
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220301387 Expired - Fee Related CN202620638U (en) | 2012-06-26 | 2012-06-26 | Expanding comprehensive training device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202620638U (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103977515A (en) * | 2014-06-06 | 2014-08-13 | 河南拓展者休闲体育设备有限公司 | Overhead safety protective device for outdoor training |
CN104001316A (en) * | 2014-05-28 | 2014-08-27 | 西安君昂户外运动俱乐部有限公司 | Outdoor training stand with sliding devices |
CN106178394A (en) * | 2016-08-31 | 2016-12-07 | 河南建培实业发展有限公司 | High-altitude outward bound frame |
CN107115616A (en) * | 2017-05-31 | 2017-09-01 | 奇业游乐设备(南京)有限公司 | A kind of climbing frame for aerial shoot Niagara recreation facility |
CN107261455A (en) * | 2017-03-01 | 2017-10-20 | 福建塔拓文化创意有限公司 | One kind adult's high-altitude extension system |
CN110767014A (en) * | 2019-10-24 | 2020-02-07 | 国网山东省电力公司应急管理中心 | Distribution lines high altitude rescue is rack and training system for training |
CN113713316A (en) * | 2021-08-25 | 2021-11-30 | 中国农业科学院都市农业研究所 | Campus farming motion system integrating picking experience and climbing experience |
-
2012
- 2012-06-26 CN CN 201220301387 patent/CN202620638U/en not_active Expired - Fee Related
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104001316A (en) * | 2014-05-28 | 2014-08-27 | 西安君昂户外运动俱乐部有限公司 | Outdoor training stand with sliding devices |
CN103977515A (en) * | 2014-06-06 | 2014-08-13 | 河南拓展者休闲体育设备有限公司 | Overhead safety protective device for outdoor training |
CN103977515B (en) * | 2014-06-06 | 2016-05-11 | 河南建培实业发展有限公司 | Outward bound high-altitude safe protector |
CN106178394A (en) * | 2016-08-31 | 2016-12-07 | 河南建培实业发展有限公司 | High-altitude outward bound frame |
CN106178394B (en) * | 2016-08-31 | 2018-06-29 | 河南建培实业发展有限公司 | High-altitude outward bound frame |
CN107261455A (en) * | 2017-03-01 | 2017-10-20 | 福建塔拓文化创意有限公司 | One kind adult's high-altitude extension system |
CN107115616A (en) * | 2017-05-31 | 2017-09-01 | 奇业游乐设备(南京)有限公司 | A kind of climbing frame for aerial shoot Niagara recreation facility |
CN110767014A (en) * | 2019-10-24 | 2020-02-07 | 国网山东省电力公司应急管理中心 | Distribution lines high altitude rescue is rack and training system for training |
CN113713316A (en) * | 2021-08-25 | 2021-11-30 | 中国农业科学院都市农业研究所 | Campus farming motion system integrating picking experience and climbing experience |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202620638U (en) | Expanding comprehensive training device | |
CN104532749A (en) | Support used for construction of upper beam of main tower of suspension bridge | |
CN202298440U (en) | Steel trestle structure used on cliff terrains | |
CN202672686U (en) | Ultrahigh falling unattached operating scaffold | |
CN204385629U (en) | A kind of support for the construction of suspension bridge king-tower top rail | |
CN202744951U (en) | Light anchorage structure | |
CN206599729U (en) | A kind of Single column pier bridge anti-overturning devices based on structure self-balancing | |
CN103485522A (en) | Novel easily-connected scaffold | |
CN207177382U (en) | A kind of I fonts inclined strut support cooling stack with suspension cable | |
CN201802059U (en) | Overhanging down-stayed scaffold | |
CN207003983U (en) | A kind of high-altitude English truss platform for construction | |
CN211912569U (en) | Multifunctional graduation wall experience type training application equipment | |
CN209603868U (en) | A kind of upper people's ladder of foldable folding and unfolding | |
CN103643790B (en) | It is applicable to the self-crawling type operating platform of colossal column | |
CN202876290U (en) | Rock climbing graduation wall dual-purpose apparatus | |
CN207047868U (en) | A kind of pattern foundation pit supporting structure barricade | |
CN203531413U (en) | Auxiliary structure hoisting whole steel structure wire frame | |
CN206823060U (en) | A kind of chin-up support for being easy to regulation | |
CN202398060U (en) | Portable badminton net | |
CN202194393U (en) | Triangular hoisting structure for steel frame pavement | |
CN207776094U (en) | A kind of grid structure | |
CN207429669U (en) | A kind of children's combination ladder | |
CN105178434B (en) | One kind chooses hovering and hangs building structure, building and annular building mansion | |
CN207193956U (en) | A kind of cement pilework for building | |
CN205444689U (en) | High -order bracing transition mast structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20121226 Termination date: 20130626 |