CN202615219U - Intelligent building electric power monitoring device - Google Patents

Intelligent building electric power monitoring device Download PDF

Info

Publication number
CN202615219U
CN202615219U CN 201220259388 CN201220259388U CN202615219U CN 202615219 U CN202615219 U CN 202615219U CN 201220259388 CN201220259388 CN 201220259388 CN 201220259388 U CN201220259388 U CN 201220259388U CN 202615219 U CN202615219 U CN 202615219U
Authority
CN
China
Prior art keywords
module
intelligent building
programmable logic
data
logic controller
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220259388
Other languages
Chinese (zh)
Inventor
徐斌
古雄文
刘岩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHUHAI PILOT TECHNOLOGY Co Ltd
Original Assignee
ZHUHAI PILOT TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHUHAI PILOT TECHNOLOGY Co Ltd filed Critical ZHUHAI PILOT TECHNOLOGY Co Ltd
Priority to CN 201220259388 priority Critical patent/CN202615219U/en
Application granted granted Critical
Publication of CN202615219U publication Critical patent/CN202615219U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Testing And Monitoring For Control Systems (AREA)
  • Alarm Systems (AREA)

Abstract

An intelligent building electric power monitoring device comprises a device control module, a data collecting and processing module, an industrial control computer, a display module, a data recording module, an alarming module, a parameter correction module and a programmable controller. The programmable controller is connected with an on-site instrument or equipment. The data collecting and processing module is connected with the programmable controller. The data collecting and processing module is respectively connected with the industrial control computer and the data recording module. The industrial control computer is respectively connected with the device control module. The device control module is respectively connected with the data recording module, the alarming module, the parameter correction module and the programmable controller. The beneficial effect of the device is that the monitoring device helps to provide strong guarantee for stable operation of an electric power apparatus in an intelligent building.

Description

A kind of intelligent building electric force monitoring apparatus
Technical field
The utility model relates to a kind of electric force monitoring apparatus, relates in particular to a kind of intelligent building electric force monitoring apparatus.
Background technology
Along with the continuous increase of consumer in the modern architecture, and people make to be that building provides the confession power distribution equipment of the energy to become more and more important to the continuous pursuit of power supply reliability.Therefore, reliability, security, continuity and the quality of power supply of confession power distribution equipment, service efficiency, use cost etc. also more and more come into one's own.
In the covil construction, electric energy is the main energy sources source of the normal operation of architectural lighting, air-conditioning regulating device, supply and exhaust device and water feeding and draining device or the like in modern times; And a series of intelligent devices of fire alarm installation, safety apparatus or the like depend on electricity especially as support of the device energy and signal support.Now, electric force monitoring apparatus becomes one of device that each intelligent building must be provided with basically.If say that electric power is equivalent to the blood of intelligent building, electric device is exactly the requisite blood circulation device of intelligent construction so; So to say that intelligent building is not if be provided with electric force monitoring apparatus, and that loses supervision and control with regard to being equivalent to the blood of oneself, and so, such intelligent building can not be referred to as the intelligent building of real meaning.Electric force monitoring apparatus has some idea of to intelligent building importance.Electric force monitoring apparatus is that the even running of electric device provides strong assurance, now becomes just gradually to supply indispensable important component part in the power distribution equipment.
The utility model content
The purpose of the utility model is to provide a kind of intelligent building electric force monitoring apparatus; It comprises device control module, data acquisition and processing module, industrial computer, display module, data recordin module, alarm module, parameter correcting module and Programmable Logic Controller; Wherein Programmable Logic Controller connects field instrument and/or equipment; Data acquisition is connected Programmable Logic Controller with processing module; Data acquisition is connected industrial computer and data recordin module respectively with processing module, and industrial computer connects display module and device control module respectively, and device control module connects data recordin module, alarm module, parameter correcting module and Programmable Logic Controller respectively.
The intelligent building electric force monitoring apparatus of the utility model can be accomplished following function:
(1) data acquisition and processing
Real time datas such as the various analog quantitys of transformer station, switching value, electricity, protection information are gathered and data necessary is carried out pre-service and deposited real-time storehouse in certain format through Master Control Unit; Regularly upgrade, control instruction and after judgement is errorless, be sent to Master Control Unit and topworks all kinds of.
(2) security monitoring supervising device
Through the running status real time monitoring of operator workstation, various operational factors are shown in real time have off-limit alarm, alarm indication and form timing and printing function to various electrical equipments in the electric substation.
(3) control function
The operations staff controls the switching of full station isolating switch, disconnector, capacitor group, the phase angularpitch and the commutated current output current of reactor through keyboard or mouse; Need to advance inspection to legitimacy, the control device barring condition of its order through device software, to illegal command with the control operation device refusal execution of not satisfying barring condition.Supervising device can limit operation people's operating right, has only controlled variable and alarm threshold that " responsible official " just can setting device, and unit state history of printing data can only be checked in common family.
(4) event handling
When transformer station has an accident, when fault and incident such as out-of-limit, supervising device will be done a series of processing automatically, as the tripping operation of opening circuit, and start accident signal simultaneously, will withdraw from respective picture, the memory of record accident, make picture corresponding failure point variable color etc.
(5) picture shows
The single wire device figure of display device state and important parameter, three-phase voltage, three-phase current curve and all kinds of service chart, real-time working condition figure form all kinds of report form statistics etc. in real time.
(6) operation and emergency review record
There are accurate recording all operations and time that the operations staff is carried out, to any accident trigger can both note relevant or all amounts of recollecting so that analyze.
(7) historical record
Can carry out statistic record to the ruuning situation of various kinds of equipment, accurately intactly a recording operation, definite value change, accident and fault etc. can generate all kinds of forms, daily record automatically, generate automatically and carry out accident picture hard copy etc.
(8) reactive-load compensation
As the reactive power compensation device of the important component part of supervising device can be regular the self-checking device power factor, when the fluctuation of rating of set factor is comparatively violent, also can manual adjustments so that the device all-the-time stable a good state relatively.
(9) alarm module
When supervising device and various unit break down when wrong self-diagnosis system can correct failure judgement content, send alerting signal.
Description of drawings
Fig. 1 is the functional-block diagram of electric force monitoring apparatus.
Embodiment
The intelligent building electric force monitoring apparatus of the utility model adopts the DCU distribution control unit structure at Programmable Logic Controller PLC, communicator and operational administrative station; Existing at present many products can the various models of following extension Programmable Logic Controller; The formation of forming Programmable Logic Controller and dividing device is used for real-time sequential control and than the stepless control of multiloop.
As shown in Figure 1,8 pairs of field instruments of Programmable Logic Controller and/or equipment are controlled, and wherein field instrument can be PMAC725 or the PMAC625 that Zhuhai Pilot Technology Co., Ltd. produces.Data acquisition and processing module 2 are from Programmable Logic Controller 8 image data, carry out pre-service and deposit data recordin module 5 in certain format necessary data; Regularly upgrade; Simultaneously, the data after this processing are admitted to industrial computer 3, and this industrial computer 3 is connected to display module 4; Show various operational factors in real time, the operator can keep watch on the running status of various electrical equipments in building through this display module 4.Industrial computer is connected with device control module 1, and device control module 1 is connected with data recordin module 5, alarm module 6, parameter correcting module 7, Programmable Logic Controller 8 respectively.Industrial computer 3 also is connected to external input devices such as keyboard and/or mouse; The data that device control module 1 obtains from data acquisition and processing module 2 according to industrial computer 3 are carried out operational analysis and are come automatic control data logging modle 5, alarm module 6, parameter correcting module 7, Programmable Logic Controller 8, and perhaps device control module 1 is come manual control data recordin module 5, alarm module 6, parameter correcting module 7, Programmable Logic Controller 8 according to industrial computer 3 from the various control commands of external input device input.
Programmable Logic Controller 8 has constituted the slave computer part of installing with field instrument and/or equipment, and device control module 1, data acquisition and processing module 2, industrial computer 3, display module 4, data recordin module 5, alarm module 6 and parameter correcting module 7 have constituted the epigynous computer section of device.

Claims (2)

1. intelligent building electric force monitoring apparatus; It comprises device control module (1), data acquisition and processing module (2), industrial computer (3), display module (4), data recordin module (5), alarm module (6), parameter correcting module (7) and Programmable Logic Controller (8); It is characterized in that Programmable Logic Controller (8) connects field instrument and/or equipment; Data acquisition is connected Programmable Logic Controller (8) with processing module (2); Data acquisition is connected industrial computer (3) and data recordin module (5) respectively with processing module (2); Industrial computer (3) connects display module (4) and device control module (1) respectively, and device control module (1) connects data recordin module (5), alarm module (6), parameter correcting module (7) and Programmable Logic Controller (8) respectively.
2. intelligent building electric force monitoring apparatus according to claim 1 is characterized in that industrial computer (3) is connected with external input device.
CN 201220259388 2012-06-04 2012-06-04 Intelligent building electric power monitoring device Expired - Lifetime CN202615219U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220259388 CN202615219U (en) 2012-06-04 2012-06-04 Intelligent building electric power monitoring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220259388 CN202615219U (en) 2012-06-04 2012-06-04 Intelligent building electric power monitoring device

Publications (1)

Publication Number Publication Date
CN202615219U true CN202615219U (en) 2012-12-19

Family

ID=47348904

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220259388 Expired - Lifetime CN202615219U (en) 2012-06-04 2012-06-04 Intelligent building electric power monitoring device

Country Status (1)

Country Link
CN (1) CN202615219U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105847024A (en) * 2015-01-16 2016-08-10 松下知识产权经营株式会社 Data management device, method and system
CN107404154A (en) * 2017-09-26 2017-11-28 南京乔天自动化科技有限公司 Automation of transformation substations equipment fault self-healing system and method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105847024A (en) * 2015-01-16 2016-08-10 松下知识产权经营株式会社 Data management device, method and system
CN107404154A (en) * 2017-09-26 2017-11-28 南京乔天自动化科技有限公司 Automation of transformation substations equipment fault self-healing system and method

Similar Documents

Publication Publication Date Title
US8923993B2 (en) Method and system for engineering a substation automation system
US9647783B2 (en) Automatic checking method for clock synchronization and specialized apparatus thereof
CN202084997U (en) Digital integrated AC/DC power supply chief monitoring device
CN104242472B (en) A kind of railway station low buckling distribution intelligent monitor system
CN204758748U (en) Cubical switchboard intelligent integrated monitoring devices
CN102064610A (en) Automatic voltage control substation system of distributed power station based on devices
CN105573243A (en) Pump station monitoring system based on PLC
CN103117597A (en) Wind power generation box type transformer intelligent monitoring system and control method thereof
CN202616876U (en) Substation visualization system based on operating perceiving
CN106093636A (en) The analog quantity check method of the secondary device of intelligent grid and device
CN202615219U (en) Intelligent building electric power monitoring device
CN108964259A (en) A kind of power grid intelligence control system
CN103279520A (en) Power substation secondary system failure reconnaissance method
CN102375105A (en) Simulation test system of substation equipment relay protection system
CN111585253B (en) Direct current protection measurement and control device with multiple early warning
CN109768619B (en) Automatic debugging system and debugging method for monitoring information
CN104142648A (en) Management and control terminal of urban rail traffic low-voltage power distribution system
CN103956828A (en) Medium and low voltage electricity distribution intelligent terminal
CN203659303U (en) Intelligent transformer station monitor training system
CN204103594U (en) Mesolow intelligent distribution terminal
CN105119384A (en) High risk and important client remote monitoring system
CN105391180A (en) Automated power dispatching monitoring alarm system
CN202798164U (en) Comprehensive anti-error blocking device based on 3G wireless communication network
CN114924525A (en) Coal mine power distribution monitoring system and method based on programmable logic controller
CN204290503U (en) Integral intelligent AC power case

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20121219

CX01 Expiry of patent term