CN202614546U - Air-cooled cold water heat pump set performance testing device - Google Patents

Air-cooled cold water heat pump set performance testing device Download PDF

Info

Publication number
CN202614546U
CN202614546U CN 201220252861 CN201220252861U CN202614546U CN 202614546 U CN202614546 U CN 202614546U CN 201220252861 CN201220252861 CN 201220252861 CN 201220252861 U CN201220252861 U CN 201220252861U CN 202614546 U CN202614546 U CN 202614546U
Authority
CN
China
Prior art keywords
water
district
thermostatic control
heat release
constant temperature
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN 201220252861
Other languages
Chinese (zh)
Inventor
张忠斌
杜垲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southeast University
Original Assignee
Southeast University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southeast University filed Critical Southeast University
Priority to CN 201220252861 priority Critical patent/CN202614546U/en
Application granted granted Critical
Publication of CN202614546U publication Critical patent/CN202614546U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Images

Landscapes

  • Testing Resistance To Weather, Investigating Materials By Mechanical Methods (AREA)

Abstract

The utility model discloses an air-cooled cold water heat pump set performance testing device including a cabinet type blower fan coil pipe, a dissipation cold water set, a constant temperature water tank, and an air-cooled cold water set to be tested. The coil pipe heat radiation water inlet and the coil pipe heat radiation water outlet of the cabinet type blower fan coil pipe are respectively connected to the water outlet of the heat releasing zone and the water inlet of the balancing zone in the constant temperature water tank, the water inlet of the dissipation cold water set is connected to the water outlet of the balancing zone in the constant temperature water tank, the water outlet of the dissipation cold water set is connected to the refrigerant water inlet of the balancing zone and the refrigerant water inlet of the thermostatic control zone in the constant temperature water tank, and the water inlet and the water outlet of the air-cooled cold water set to be tested are respectively connected to the refrigerant water outlet of the thermostatic control zone and the water inlet of the heat releasing zone in the constant temperature water tank. The zoned water tank equipped with notched separator plates provided is free of an additional blending device and can provide the constant water inlet working condition for the performance testing of the air-cooled cold water set.

Description

Wind-cooled cold-water source pump performance test apparatus
Technical field
The utility model belongs to the Building Environment and Equipment Engineering technical field, relates to a kind of handpiece Water Chilling Units performance test apparatus.
Background technology
Wind-cooled cold-water source pump performance test apparatus is a kind of test unit that the test operation condition environment can be provided for the test of wind-cooled cold-water unit performance, can be used for carrying out the measurement of wind-cooled cold-water unit refrigerating capacity, power and energy effciency ratio.Existing wind-cooled cold-water source pump performance test apparatus is normally by being constituted by examination wind-cooled cold-water unit, constant temperature water tank and heat abstractor; Its principle of work is: when the wind-cooled cold-water unit is done refrigerating operaton; The wind-cooled cold-water unit is the low-temperature receiver of constant temperature water tank; This moment, constant temperature water tank need come the balance low-temperature receiver by electric heater unit, thereby guaranteed the temperature constant of constant temperature water tank; When the wind-cooled cold-water unit was done heating operation, the wind-cooled cold-water unit was the thermal source of constant temperature water tank, and this moment, constant temperature water tank needed the heat abstractor on outer boundary to dissipate unnecessary heat, thereby had guaranteed the temperature constant of constant temperature water tank.
According to national standard positive displacement and centrifugal cold water (heat pump) unit performance test method (GB/T 10870-2001), the performance test of wind-cooled cold-water unit need provide constant import and export condition.Chinese patent CN 202126360 U disclose a kind of wind-cooled cold-water unit performance proving installation; This patent employing end equipment is controlled out temperature, and 12 ℃ ± 0.1 ℃ water temperature with 7 ℃ ± 0.1 ℃ of inlet temperature is controlled but this device is difficult to guarantee outlet temperature.
The main flow proving installation of wind-cooled cold-water unit performance more is to adopt constant temperature water tank to carry out temperature control.Constant temperature water tank normally is made up of stainless steel casing, pipe interface, temperature sample connection and fluid level controller etc., and in order to prevent the casing heat dissipation, outside surface adopts insulating rubber plastic to be incubated usually.The function of constant temperature water tank is the medium that guarantees in the water tank, the normally temperature constant of water, salt solution or ethylene glycol solution etc.The temperature constant of medium need be achieved through the balance adjustment mode of thermal source heating and low-temperature receiver cooling usually.Other media transport with heat transfer characteristic and water seemingly, following narration is research object with water.But because certain height that is filled with water is arranged, the water temperature in the water tank certainly exists lamination, and the serious levels water temperature temperature difference can reach 10 ℃, wants to guarantee the temperature constant not a duck soup of whole water tank.
So, on body structure, by constant temperature water tank consider that be divided into two cavitys forms.Chinese patent CN200720061288.9 discloses a kind of constant temperature water tank, can water-use for environment be provided for snowfall simulation, rainfall.This constant temperature water tank adopts dividing plate that casing is divided into heating zone and cooling zone: the hot water that is higher than environment temperature can be supplied in the heating zone; The cold water that is lower than environment temperature can be supplied in the cooling zone; And be provided with stirring system respectively in these two zones, schematic diagram is seen Fig. 1.But this water tank still can't be realized the constant water temperature of temperature fluctuation ± 0.1 ℃, also just can't constant water inlet working condition be provided for the test of wind-cooled cold-water (heat pump) unit performance.Simultaneously,, can realize the water route cyclic process, dispose stirring system again and come balancing water temperature to seem unnecessary because wind-cooled cold-water (heat pump) unit performance pilot system itself needs the multichannel water-flow chart, and power consumption.Therefore, use common constant temperature water tank to provide constant water inlet working condition by no means easy as the performance test of wind-cooled cold-water unit.
The utility model content
Technical matters:The utility model provides a kind of can reduce wind-cooled cold-water unit energy consumption, practices thrift the wind-cooled cold-water source pump performance test apparatus of system's initial cost and operation energy consumption.
Technical scheme:The wind-cooled cold-water source pump performance test apparatus of the utility model; Comprise cabinet type fan coil, dissipation handpiece Water Chilling Units, constant temperature water tank and tried the wind-cooled cold-water unit; The coil pipe of cabinet type fan coil heat radiation water inlet and coil pipe dispel the heat water delivering orifice respectively with constant temperature water tank in heat release district water delivering orifice be connected with the equilibrium area cooling water inlet; The dissipation handpiece Water Chilling Units water inlet of dissipation handpiece Water Chilling Units is connected with the equilibrium area water delivering orifice in the constant temperature water tank; Dissipation handpiece Water Chilling Units water delivering orifice simultaneously with constant temperature water tank in the import of equilibrium area chilled water be connected with the chilled water import of thermostatic control district, tried the wind-cooled cold-water unit by test-run a machine group water inlet with by test-run a machine group water delivering orifice respectively with constant temperature water tank in thermostatic control district chilled water export and be connected with the chilled water import of heat release district;
Constant temperature water tank comprises casing, longitudinal baffle, spill cavity and lateral partitions; Be arranged on the preceding facade of said casing and the longitudinal baffle between the facade of back casing is divided into left and right two zones; Wherein a regions is the thermostatic control district; The opposite side zone is divided into heat release district and combined balance system district by lateral partitions; Spill cavity is arranged on the side of longitudinal baffle towards heat release district and combined balance system district; The dividing plate height of spill cavity is higher than the height of longitudinal baffle and lateral partitions, and the base plate of spill cavity is provided with spout hole, is provided with the connection heat release district of closing on spill cavity and first breach in combined balance system district at the lateral partitions downside; Be provided with second breach in the connection thermostatic control district and the heat release district of wall box at the longitudinal baffle downside, the longitudinal baffle downside also is provided with the connection thermostatic control district of closing on wall box and the 3rd breach in combined balance system district;
In the thermostatic control district, base plate is provided with the chilled water outlet of thermostatic control district, and wall box is provided with chilled water import of thermostatic control district and water supplement port, and the district also is provided with liquid level gauge, temp probe and electric heater unit in said thermostatic control;
In the heat release district, base plate is provided with heat release district water delivering orifice, and wall box is provided with the chilled water import of heat release district;
In the combined balance system district, base plate is provided with the equilibrium area water delivering orifice, and wall box is provided with equilibrium area cooling water inlet and the import of equilibrium area chilled water.
In the utility model, the breach area of first breach, second breach and the 3rd breach is greater than the orifice area of the chilled water import of said thermostatic control district, the chilled water import of heat release district, equilibrium area cooling water inlet and the import of equilibrium area chilled water.
In the utility model, chilled water import of thermostatic control district and the import of equilibrium area chilled water are connected with 90 ° of elbows that are positioned at box inside respectively; Said water supplement port, heat release district water delivering orifice, the chilled water import of heat release district and equilibrium area cooling water inlet are connected with 45 ° of elbows that are positioned at box inside respectively; The water delivering orifice of 90 ° of elbows and 45 ° of elbows is towards the bottom of casing.
When being begun the refrigeration performance test by examination wind-cooled cold-water (heat pump) unit; Use side water by examination wind-cooled cold-water (heat pump) unit passes through to use the side water pump; Thermostatic control district chilled water water delivering orifice water intaking from the thermostatic control zone gets into by the test-run a machine group and uses the side water-side heat; Used the water outlet of side water by the test-run a machine group, get back to constant temperature water tank through the heat release district chilled water import in heat release zone.Too high in order to prevent temperature; The handpiece Water Chilling Units water inlet high temperature protection of heat dissipation; The water delivering orifice water intaking in the heat release district in heat release zone transports through cabinet type fan coil water pump, gets into the preliminary consumption that cabinet type fan coil is accomplished heat; Through the water that heat dissipates, get back to water tank via the equilibrium area cooling water inlet in combined balance system zone.Equilibrium area water delivering orifice water intaking in the combined balance system district gets into the dissipation handpiece Water Chilling Units, the problem that too high protection is reported to the police with regard to the handpiece Water Chilling Units temperature that can not dissipate like this.After handpiece Water Chilling Units excess enthalpy heat dissipation, backwater is divided into two-way, and one the tunnel gets back to constant temperature water tank via the equilibrium area chilled water import in combined balance system zone, and one the tunnel gets back to constant temperature water tank via the thermostatic control district chilled water import in thermostatic control zone.Like this, the outside clockwise cyclic process of water tank is accomplished.
When being begun the heat pump performance test by examination wind-cooled cold-water (heat pump) unit; Use side water by examination wind-cooled cold-water (heat pump) unit passes through to use the side water pump; From the thermostatic control district chilled water water intaking in thermostatic control zone, get back to constant temperature water tank through the heat release district chilled water import in heat release zone.The water delivering orifice water intaking in the heat release district in heat release zone transports through cabinet type fan coil water pump, gets into cabinet type fan coil.Usually, the blower fan of cabinet type fan coil does not leave.When the refrigerating capacity of quilt examination wind-cooled cold-water (heat pump) unit is very big, can open the blower fan of cabinet type fan coil.At this moment, the water and air heat exchange that cabinet type fan coil table cooling coil is inside and outside, water can a part absorb heat from air, thereby can reduce the electrically heated injected volume of constant temperature water tank.Then, backwater is got back to water tank via the equilibrium area cooling water inlet in combined balance system zone.In the water intaking of the equilibrium area water delivering orifice in combined balance system district, get into the dissipation handpiece Water Chilling Units, the one tunnel gets back to constant temperature water tank via the equilibrium area chilled water import in combined balance system zone, and one the tunnel gets back to constant temperature water tank via the thermostatic control district chilled water import in thermostatic control zone.Like this, the outside clockwise cyclic process of water tank is accomplished.
Water tank outer loop process, the counter clockwise direction that must bring the difference in height of each regional water level of water tank, this difference in height to promote between inner three zones of water tank circulates.
The heat release district receives by the use side water water outlet of examination wind-cooled cold-water (heat pump) unit, and through water pump this part water is introduced cabinet type fan coil units and carry out heat release; The combined balance system district receives cabinet type fan coil units water outlet; And through water pump this part water is introduced the heat dissipation and carry out the secondary heat release with air-cooled (perhaps water-cooled) handpiece Water Chilling Units (hereinafter to be referred as the dissipation handpiece Water Chilling Units), this zone is also taken back in a part of water outlet of the handpiece Water Chilling Units that dissipates simultaneously; The thermostatic control zone receives another part water outlet of dissipation handpiece Water Chilling Units, and the water inlet condition of being used side water by examination wind-cooled cold-water (heat pump) unit is provided.Above water-flow chart process is accomplished the outside water route cyclic process of constant temperature water tank.
The clockwise water route cyclic process in outside water route has driven the inner water of water tank and has flowed through the counterclockwise of breach, forms the cyclic process in the inner water route of constant temperature water tank.Certainly, the cyclic process of outside water route relies on the water pump realization, and the cyclic process of inner water route relies on the water-head of each cavity in the constant temperature water tank to realize, so the breach bore is greater than the caliber of outer loop water intaking, more than the twice of normally corresponding water intaking caliber reaches.
The moisturizing of constant temperature water tank directly gets into the thermostatic control zone, and moisturizing also can be used for chilled water in the time of necessary.When water tank need clean blowdown, the sewage in the water tank was discharged via blow-off pipe.When the water level of water tank surpassed spill cavity, unnecessary water was discharged via spill cavity.The height of spill cavity is higher than the height of dividing plate, and the water of three subregions of constant temperature water tank also is communicated with at water tank upper, and constant temperature water tank is divided into not is three zones fully independently to dividing plate thus.
The heat release district realizes being used the water outlet of side water to carry out heat release through cabinet type fan coil units by examination wind-cooled cold-water (heat pump) unit; What is more important can directly get into the dissipation handpiece Water Chilling Units in the combined balance system district through the water after the cabinet type fan coil units heat release, and the handpiece Water Chilling Units inflow temperature that is unlikely to dissipate is too high and cause the unit high temperature protection.The combined balance system district realizes that through the dissipation handpiece Water Chilling Units excess enthalpy of water body heat discharges, and a water part that discharges through the heat excess enthalpy directly gets into the thermostatic control zone, and another part returns the combined balance system district.Why the water outlet of dissipation handpiece Water Chilling Units is divided into two-way, mainly is that the cooling that guarantees the thermostatic control zone is unlikely to excessive, and dissipation handpiece Water Chilling Units backwater plays a buffer action to the combined balance system district.The thermostatic control zone guarantees that the use side water inflow temperature of quilt examination wind-cooled cold-water (heat pump) unit is constant, and this regional low-temperature receiver is the backwater of dissipation handpiece Water Chilling Units.Under the rare occasion, moisturizing also can be used as this regional low-temperature receiver.Low-temperature receiver is realized this regional excess enthalpy cooling.This regional thermal source is electrical heating, and the control of controllable silicon power regulator is adopted in electrical heating, through the PID reconciliation statement, can realize 0~100% the continuous adjustment process of heat.Excess enthalpy cooling and 0~100% continuously adjustable electrical heating concur, and realize that this regional water temperature is constant.
Take over for dissipation handpiece Water Chilling Units two-way backwater, add 90 ° of stainless steel bends of a corresponding specification in the water tank inboard; Connecting pipe all should add 45 ° of stainless steel bends of a corresponding specification in the water tank inboard on each sidewall of all the other casings, and elbow down.
Beneficial effect:The wind-cooled cold-water source pump performance test apparatus of the utility model; Core is constant temperature water tank; In casing, be provided with the dividing plate that has breach; Constant temperature water tank is divided into three regional separations of heat release district, combined balance system district and thermostatic control but incomplete distinct area, and water is in the circulation of described zone, and the utility model compared with prior art has the following advantages:
(1) compares with the constant temperature water tank that agitating device is set separately; The utility model need not add special stirring measure; Rely on the water route circulation of pilot system to realize that heat dissipates and the combined balance system process fully; In the process of pilot system operation, the energy consumption of special agitating device can save.
(2) outside circulation of water route clockwise and the circulation acting in conjunction of the counterclockwise water route of internal partition breach; Realize the constant fluid dynamic equilibrium environment of thermostatic control zone water temperature; The water passage circulation system of this similar " Tai Ji " can effectively solve the phenomenon of water tank water temperature inside layering.The water temperature layering seriously is because the heat transfer of water body mainly relies on natural convection, and the water passage circulation system of similar " Tai Ji " that the utility model is introduced is effectively organized pilot system outside water route circulation and water tank internal flow, forms forced convertion.
(3) the use side water water inlet condition of being tried wind-cooled cold-water (heat pump) unit can provide through constant temperature water tank.Via heat release district heat release, combined balance system district combined balance system, thus solving the water tank water temperature delamination stage by stage by the big problem of test-run a machine group inflow temperature fluctuation, the thermostatic control zone is final realizes that water temperature is constant, the control temperature accuracy is at ± 0.1 ℃.
(4) especially for being come water by the heat pump operating mode of examination wind-cooled cold-water unit; By the chilled water water outlet of examination wind-cooled cold-water (heat pump) unit; Through after outside and the cabinet type fan coil heat radiation cooling air heat exchange, get back to water tank once more, chilled water is cooled to below after the environment temperature; After this part water gets into the handpiece Water Chilling Units of water tank heat transmission once more, can guarantee the efficient stable operation of handpiece Water Chilling Units.
(5) the inner breach area of water tank is greater than chilled water induction pipe open area; Guarantee that circulation of outside water route and inner water route circulation flow rate are synchronous; The flowing velocity field synchronization guarantees that temperature field, water tank flat-temperature zone is synchronous, and then guarantees not appearance temperature lamination of water tank flat-temperature zone.
(6) chilled water import of thermostatic control district and the import of equilibrium area chilled water are connected with 90 ° of elbows that are positioned at box inside respectively; The water delivering orifice of 90 ° of elbows is towards the bottom of casing; Can prevent the impact of low temperature water inlet like this, guarantee that the temperature fluctuations disturb effect to the flat-temperature zone of chilled water drops to minimum water temperature in the water tank; Water supplement port, heat release district water delivering orifice, the chilled water import of heat release district, heat release district cooling water inlet and equilibrium area cooling water inlet are connected with 45 ° of elbows that are positioned at box inside respectively; The water delivering orifice of 45 ° of elbows is towards the bottom of casing; The Temperature Distribution of water inlet in the appointed area accomplished in can conveniently intake like this rapid diffusion in water tank is asked rapidly.
Description of drawings
Below in conjunction with accompanying drawing and specific embodiment the utility model is done further detailed explanation.
Fig. 1 is a disclosed heat recovery wind-cooled cold-water unit environmental simulation proving installation schematic diagram in the prior art.
Fig. 2 is the principle assumption diagram of the utility model test unit.
Fig. 3 is the structural front view of the constant temperature water tank in the utility model test unit.
Fig. 4 is along the topology view of A-A hatching line among Fig. 2.
Fig. 5 be among Fig. 2 along B to topology view.
Fig. 6 is along the topology view of C-C hatching line among Fig. 3.
Fig. 7 is along the topology view of D-D hatching line among Fig. 3.
Among the figure: the 1-casing; The 2-longitudinal baffle; The 3-lateral partitions; 4-thermostatic control district; 5-heat release district; 6-combined balance system district; The 7-spill cavity; Facade before the 11-; Facade behind the 12-; 31-first breach; 21-second breach; 22-the 3rd breach; The chilled water outlet of 41-thermostatic control district; The chilled water import of 43-thermostatic control district; The 44-water supplement port; The 45-liquid level gauge; The 46-temp probe; The 47-electric heater unit; 51-heat release district water delivering orifice; The chilled water import of 52-heat release district; 61-equilibrium area water delivering orifice; 62-equilibrium area cooling water inlet; The import of 63-equilibrium area chilled water; The 71-spout hole; The cabinet type fan coil of 8-; 81-coil pipe heat radiation water inlet; 82-coil pipe heat radiation water delivering orifice; 9-dissipation handpiece Water Chilling Units; 91-dissipation handpiece Water Chilling Units water inlet; 92-dissipation handpiece Water Chilling Units water delivering orifice; 10-is tried the wind-cooled cold-water unit; 101-is by test-run a machine group water inlet; 102-is by test-run a machine group water delivering orifice.
Embodiment
Below in conjunction with accompanying drawing to the further explain of the utility model.
The wind-cooled cold-water source pump performance test apparatus of the utility model comprises cabinet type fan coil 8, dissipation handpiece Water Chilling Units 9, constant temperature water tank and by examination wind-cooled cold-water unit 10; The coil pipe of cabinet type fan coil 8 heat radiation water inlet 81 and coil pipe dispel the heat water delivering orifice 82 respectively with constant temperature water tank in heat release district water delivering orifice 51 be connected with equilibrium area cooling water inlet 62; The dissipation handpiece Water Chilling Units water inlet 91 of dissipation handpiece Water Chilling Units 9 is connected with the equilibrium area water delivering orifice 61 in the constant temperature water tank; Dissipation handpiece Water Chilling Units water delivering orifice 92 simultaneously with constant temperature water tank in equilibrium area chilled water import 63 be connected with thermostatic control district chilled water import 43, tried wind-cooled cold-water unit 10 by test-run a machine group water inlet 101 with by test-run a machine group water delivering orifice 102 respectively with constant temperature water tank in thermostatic control district chilled water export 41 and be connected with heat release district chilled water import 52;
Constant temperature water tank comprises casing 1, longitudinal baffle 2, spill cavity 7 and lateral partitions 3; Be arranged on the preceding facade 11 of said casing 1 and the longitudinal baffle 2 between the facade 12 of back casing 1 is divided into left and right two zones; Wherein a regions is thermostatic control district 4; The opposite side zone is divided into heat release district 5 and combined balance system district 6 by lateral partitions 3; Spill cavity 7 be arranged on longitudinal baffle 2 towards the heat release district 5 with the side in combined balance system district 6; The dividing plate height of spill cavity 7 is higher than the height of longitudinal baffle 2 and lateral partitions 3, and the base plate of spill cavity 7 is provided with spout hole 71, is provided with the connection heat release district 5 of closing on spill cavity 7 and first breach 31 in combined balance system district 6 at lateral partitions 3 downsides; Be provided with second breach 21 in connection thermostatic control district 4 with the heat release district 5 of casing 1 sidewall at longitudinal baffle 2 downsides, longitudinal baffle 2 downsides also are provided with the connection thermostatic control district 4 of closing on casing 1 sidewall and the 3rd breach 22 in combined balance system district 6;
In thermostatic control district 4; Base plate is provided with thermostatic control district chilled water outlet 41; Casing 1 sidewall is provided with thermostatic control district chilled water import 43 and water supplement port 44, also is provided with liquid level gauge 45, temp probe 46 and electric heater unit 47 in said thermostatic control district 4;
In heat release district 5, base plate is provided with heat release district water delivering orifice 51, and casing 1 sidewall is provided with heat release district chilled water import 52;
In combined balance system district 6, base plate is provided with equilibrium area water delivering orifice 61, and casing 1 sidewall is provided with equilibrium area cooling water inlet 62 and equilibrium area chilled water import 63.
In other embodiment of the utility model; The front and back position in heat release district 5 and combined balance system district 6 can be exchanged; In like manner, the zone at heat release district 5 and 6 places, combined balance system district can be exchanged with the zone in thermostatic control district 4; These do not influence the utility model purpose and effect, all within the protection domain of the utility model.
Among the embodiment of the utility model, the breach area of first breach 31, second breach 21 and the 3rd breach 22 is greater than the orifice area of said thermostatic control district chilled water import 43, heat release district chilled water import 52, equilibrium area cooling water inlet 62 and equilibrium area chilled water import 63.
In the utility model, the thermostatic control district chilled water import 43 and the equilibrium area chilled water import 63 of water tank is connected with 90 ° of elbows that are positioned at casing 1 inboard respectively; Said water supplement port 44, heat release district water delivering orifice 51, heat release district chilled water import 52 and equilibrium area cooling water inlet 62 are connected with one respectively and are positioned at 45 ° of inboard elbows of casing 1; The water delivering orifice of 90 ° of elbows and 45 ° of elbows is towards the bottom of casing 1.
When being begun the heat pump performance test by examination wind-cooled cold-water (heat pump) unit; Use side water by examination wind-cooled cold-water (heat pump) unit passes through to use the side water pump; Thermostatic control district chilled water water delivering orifice 41 water intakings from thermostatic control zone 4 get into by the test-run a machine group and use the side water-side heat; Used the water outlet of side water by the test-run a machine group, get back to constant temperature water tank through the heat release district chilled water import 52 in heat release district 5.Too high in order to prevent temperature, the handpiece Water Chilling Units water inlet high temperature protection of heat dissipation, water delivering orifice 51 water intakings transport through cabinet type fan coil water pump in the heat release district in heat release district 5, get into the preliminary dissipation that cabinet type fan coil is accomplished heat.Water through the heat dissipation; Equilibrium area cooling water inlet 62 via combined balance system district 6 is got back to water tank; Equilibrium area water delivering orifice 61 water intakings in combined balance system district 6 get into the dissipation handpiece Water Chilling Units, the problem that too high protection is reported to the police with regard to the handpiece Water Chilling Units temperature that can not dissipate like this.After handpiece Water Chilling Units excess enthalpy heat dissipation, backwater is divided into two-way, and one the tunnel gets back to constant temperature water tank via the equilibrium area chilled water import 63 in combined balance system district 6, and one the tunnel gets back to constant temperature water tank via the thermostatic control district chilled water import 43 in thermostatic control zone.Like this, the outside clockwise cyclic process of water tank is accomplished.
Water tank outer loop process; Must bring the difference in height of each regional water level of water tank; The counter clockwise direction that this difference in height has promoted between inner three zones of water tank circulates: the water in thermostatic control zone 4 gets into combined balance system district 6 via second breach 21; The water in combined balance system district 6 gets into heat release district 5 via first breach 31, and the water in the heat release district 5 gets into thermostatic control zone 4 via the 3rd breach 22.Like this, the inner counterclockwise cyclic process of water tank is accomplished.
The temperature constant in thermostatic control zone 4 is to lean on this regional Cooling and Heat Source to concur realization.This regional low-temperature receiver is the backwater that the dissipation handpiece Water Chilling Units is brought via temp probe 46; Via water supplement port 44, the ball-cock assembly of establishing in the employing is controlled the moisturizing water level in the time of necessary, and the moisturizing that brings from the external world also can be played the effect to 4 coolings of thermostatic control zone.This regional thermal source is arranged on the electrical heating on the electric heater unit 47; The platinum resistance temperature sensor collecting temperature that this part electrical heating adopts the RTD interface to be provided with; Via the pid number reconciliation statement, the electrical heating amount of control controllable silicon power regulator realization 0~100% is regulated continuously.That is to say that the cold that the dissipation handpiece Water Chilling Units is brought through regulating the electrical heating balance cold of heat continuously, is realized the temperature constant that this is regional with the 4 excess enthalpies cooling of thermostatic control zone.In order to prevent the electric heating tube dry combustion method, constant temperature water tank is provided with liquid level gauge 45 specially, and the water level in the water tank is in case low excessively, liquid level gauge 45 will output alarm signal to switch board, carry out the buzzing warning.
Overflow is made up of a spill cavity 7; Realize draining through overflow vent 71; The height of this cavity will be higher than the height of dividing plate, that is to say that the water in the constant temperature water tank also is communicated with on dividing plate top, and promptly constant temperature water tank is separated into three is not complete distinct area to dividing plate.The blowdown of water tank is discharged through being positioned at the bottom blow-down mouth of pipe.
The two-way backwater of dissipation handpiece Water Chilling Units is taken over, and adds 90 ° of stainless steel bends of a corresponding specification in the water tank inboard; Connecting pipe all should add 45 ° of stainless steel bends of a corresponding specification in the water tank inboard on all the other each sidewalls, and elbow down.Except that blow-off pipe, each connecting pipe of other on the water tank bottom base plate all should leave the 50mm height in water tank inside; 100mm is stretched out in all adapters.Tank lid can adopt with the stainless steel material of the same material of casing and make, and the both sides of tank lid can respectively dispose a grip, and tank lid covers on the flanging of casing top and tank box is used.Glass wool or rubber-plastics material insulation can be adopted in the outside of casing and tank lid, and insulation layer thickness is 30mm, and the heat-insulation layer outside can adopt corrosion resistant plate to decorate.

Claims (3)

1. wind-cooled cold-water source pump performance test apparatus; It is characterized in that; This device comprises cabinet type fan coil (8), dissipation handpiece Water Chilling Units (9), constant temperature water tank and is tried wind-cooled cold-water unit (10); The coil pipe of said cabinet type fan coil (8) heat radiation water inlet (81) and coil pipe dispel the heat water delivering orifice (82) respectively with constant temperature water tank in heat release district water delivering orifice (51) be connected with equilibrium area cooling water inlet (62); The dissipation handpiece Water Chilling Units water inlet (91) of said dissipation handpiece Water Chilling Units (9) is connected with equilibrium area water delivering orifice (61) in the constant temperature water tank; Dissipation handpiece Water Chilling Units water delivering orifice (92) simultaneously with constant temperature water tank in equilibrium area chilled water import (63) is connected with thermostatic control district chilled water import (43), said tried wind-cooled cold-water unit (10) by test-run a machine group water inlet (101) with by test-run a machine group water delivering orifice (102) respectively with constant temperature water tank in thermostatic control district chilled water export (41) and be connected with heat release district chilled water import (52);
Said constant temperature water tank comprises casing (1), longitudinal baffle (2), spill cavity (7) and lateral partitions (3); Be arranged on the preceding facade (31) of said casing (1) and the longitudinal baffle (2) between the back facade (12) casing (1) is divided into left and right two zones; Wherein a regions is thermostatic control district (4); The opposite side zone is divided into heat release district (5) and combined balance system district (6) by lateral partitions (3); Said spill cavity (7) is arranged on the side of longitudinal baffle (2) towards heat release district (5) and combined balance system district (6); The dividing plate height of spill cavity (7) is higher than the height of longitudinal baffle (2) and lateral partitions (3); The base plate of spill cavity (7) is provided with spout hole (71); Be provided with the connection heat release district (5) of closing on spill cavity (7) and first breach (31) of combined balance system district (6) at lateral partitions (3) downside; Be provided with second breach (21) of connection thermostatic control district (4) and heat release district (5) of casing (1) sidewall at longitudinal baffle (2) downside, longitudinal baffle (2) downside also is provided with the connection thermostatic control district (4) of closing on casing (1) sidewall and the 3rd breach (22) of combined balance system district (6);
In said thermostatic control district (4); Base plate is provided with thermostatic control district chilled water outlet (41); Casing (1) sidewall is provided with thermostatic control district chilled water import (43) and water supplement port (44), also is provided with liquid level gauge (45), temp probe (46) and electric heater unit (47) in said thermostatic control district (4);
In said heat release district (5), base plate is provided with heat release district water delivering orifice (51), and casing (1) sidewall is provided with heat release district chilled water import (52);
In said combined balance system district (6), base plate is provided with equilibrium area water delivering orifice (61), and casing (1) sidewall is provided with equilibrium area cooling water inlet (62) and equilibrium area chilled water import (63).
2. a kind of wind-cooled cold-water source pump performance test apparatus according to claim 1; It is characterized in that the breach area of said first breach (31), second breach (21) and the 3rd breach (22) is greater than the orifice area of said thermostatic control district chilled water import (43), heat release district chilled water import (52), equilibrium area cooling water inlet (62) and equilibrium area chilled water import (63).
3. a kind of wind-cooled cold-water source pump performance test apparatus according to claim 1; It is characterized in that said thermostatic control district chilled water import (43) and equilibrium area chilled water import (63) are connected with one respectively and are positioned at 90 ° of inboard elbows of casing (1); Said water supplement port (44), heat release district water delivering orifice (51), heat release district chilled water import (52) and equilibrium area cooling water inlet (62) are connected with one respectively and are positioned at 45 ° of inboard elbows of casing (1); The water delivering orifice of said 90 ° of elbows and 45 ° of elbows is towards the bottom of casing (1).
CN 201220252861 2012-05-31 2012-05-31 Air-cooled cold water heat pump set performance testing device Withdrawn - After Issue CN202614546U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220252861 CN202614546U (en) 2012-05-31 2012-05-31 Air-cooled cold water heat pump set performance testing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220252861 CN202614546U (en) 2012-05-31 2012-05-31 Air-cooled cold water heat pump set performance testing device

Publications (1)

Publication Number Publication Date
CN202614546U true CN202614546U (en) 2012-12-19

Family

ID=47348235

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220252861 Withdrawn - After Issue CN202614546U (en) 2012-05-31 2012-05-31 Air-cooled cold water heat pump set performance testing device

Country Status (1)

Country Link
CN (1) CN202614546U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102680268A (en) * 2012-05-31 2012-09-19 东南大学 Performance test device of air-cooling water chilling unit
CN113252380A (en) * 2021-06-22 2021-08-13 浙江创能新能源股份有限公司 Automatic test platform of multi-functional heat pump

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102680268A (en) * 2012-05-31 2012-09-19 东南大学 Performance test device of air-cooling water chilling unit
CN102680268B (en) * 2012-05-31 2014-07-09 东南大学 Performance test device of air-cooling water chilling unit
CN113252380A (en) * 2021-06-22 2021-08-13 浙江创能新能源股份有限公司 Automatic test platform of multi-functional heat pump

Similar Documents

Publication Publication Date Title
CN102706679B (en) Constant-temperature water tank for water cooling chiller performance testing system
CN101299000B (en) Heat exchange tester of ground source heat pump underground heat exchanger
CN100494825C (en) Heat pump double water circulation system for ocean thermocline emulation test platform
CN103592142A (en) System for testing heat transfer and resistance characteristics of large-size generating equipment heat exchanger
CN204141839U (en) A kind of water circulation constant temperature thermal source experimental provision of automatic temperature control heating
CN205536666U (en) Shopping mall's energy -conserving integrated system in cold and hot source
CN102680268B (en) Performance test device of air-cooling water chilling unit
CN205536298U (en) Energy -conserving integrated system in cold and hot source of large supermarket
CN202648973U (en) Combustion gas wall heater performance comprehensive testing device
CN202614546U (en) Air-cooled cold water heat pump set performance testing device
CN203479550U (en) System suitable for testing heat transfer and resistance characteristics of heat exchanger of large-scale generating equipment
CN204678480U (en) A kind of thermal stratification type stores heat-releasing device
CN103912942B (en) A kind of air-conditioning system of indoor automatic air interchanger coupling freezing by change of state device
CN205156679U (en) Compound calorimeter of steam coiled natural gas
CN202614545U (en) Mixing water tank for the performance test of water cooling cold water set
CN103808524A (en) Water-water/water-glycol type water source heat pump assembly performance testing device
CN103471244A (en) Free piston electric heat pump water boiler system
CN204535153U (en) A kind of solar heat switch with energy-storage function
CN209326419U (en) A kind of heat exchanger and its control system based on heat source offer
CN207922365U (en) Solar energy wall-hung boiler hot-water heating system
CN202973570U (en) Water heater
CN205372703U (en) Hanging stove hot -water circulation device
CN201715731U (en) Solar heat pump hot water integrated machine
CN215809282U (en) Energy-saving water heater
CN203222471U (en) Massecuite cooling water recycling device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20121219

Effective date of abandoning: 20140709

RGAV Abandon patent right to avoid regrant