CN202610784U - One-legged raking pile simple platform at sea - Google Patents
One-legged raking pile simple platform at sea Download PDFInfo
- Publication number
- CN202610784U CN202610784U CN 201220247224 CN201220247224U CN202610784U CN 202610784 U CN202610784 U CN 202610784U CN 201220247224 CN201220247224 CN 201220247224 CN 201220247224 U CN201220247224 U CN 201220247224U CN 202610784 U CN202610784 U CN 202610784U
- Authority
- CN
- China
- Prior art keywords
- leg
- pillar
- sea
- legged
- piling bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Foundations (AREA)
- Earth Drilling (AREA)
Abstract
The utility model relates to a one-legged raking pile simple platform at sea, which comprises an upper part module and a lower part structure arranged under the upper part module, wherein the lower part structure is a one-legged upright post mounted in the center of the bottom of the upper part module; a plurality of inclined steel piles are arranged on the periphery of the one-legged upright post; a drill conductor is mounted at the lower part of the upper part module; and thus the one-legged raking pile simple platform structure is formed through the connection. The one-legged raking pile simple platform at sea is simple in structure, simplifies a complex space frame structure under the premise of meeting production operation requirements at sea, reduces the use amount of steel products substantially, shortens the construction working periods, and saves the construction cost; and meanwhile, as components of the simple platform are connected through an assembly method at sea, the weight of each part is reduced; the requirements for the offshore construction ships are further reduced, and the installation cost is saved.
Description
Technical field
The utility model relates to production platform, relates in particular to a kind of marine solely simple and easy platform of leg taper pile that is suitable for small field and marginal field exploitation in the sea.Belong to offshore oil engineering field.
Background technology
Often to use the offshore oil exploitation platform in the petroleum development engineering at sea.
As shown in Figure 1; Existing offshore production platform comprises: upper module 1, be installed in passive substructure 2---jacket below the upper module 1, wherein, various productions and living facilities (figure does not show) can be installed on the upper module 1; Substructure 2---jacket mainly comprises: four columniform steel pipe leg posts 3; The inside of every steel pipe post 3 all is with piling bar 4, and the effect of piling bar 4 is to squeeze into the seabed with fixing whole flat, is provided with several supporting steel pipes 5 between four steel pipe posts 3; These supporting steel pipes 5 and four steel pipe post 3 a common firm substructure 2---truss-like jackets of forming are in order to support upper module 1.In the framework of jacket, some waterproof casings 6 can be installed as required.When specifically offshore platform being installed, generally be divided into for two steps, at first, jacket transported to the scene, in four steel pipe posts 3 of jacket, piling bar 4 is inserted and squeeze into the seabed, after fixing jacket, again upper module 1 is installed on the jacket.
Above-mentioned offshore production platform, its structure is more stable, is fit to very much be operated in reach under the complicated marine environment condition in the relatively large oil-gas field development application.But, because its weight of offshore platform of this form of structure is heavier relatively, install and more complicated, therefore, its cost is also higher relatively.And in some seas in the exploitation of small field and marginal field, because the required well head number of its oil gas field is less, production facility is also simple relatively, and the personnel of need not garrison operation; And its weight of equipment also is far smaller than the production platform of above-mentioned routine, and is under this condition, if still use the production platform structure of above-mentioned routine, very non-remunerative beyond doubt.Therefore, in the exploitation of middle at sea small field and marginal field, only need to use some simple and easy platforms, can carry out oil producing operation.The utility model promptly designs under above-mentioned situation.
The utility model content
The main purpose of the utility model is to overcome the above-mentioned shortcoming that prior art exists; And providing the only leg taper pile in a kind of sea simple and easy platform, it is simple in structure, can be under the prerequisite that satisfies the offshore production job requirements; Simplified numerous and diverse space frame structure; Reduce the use amount of steel significantly, shortened construction duration, practiced thrift construction cost; Simultaneously,, therefore, alleviated each several part weight, also just reduced requirement, practiced thrift installation cost again the offshore construction boats and ships because each assembly of simple and easy platform is to connect through the mode that assemble at the sea.
The purpose of the utility model is realized by following technical scheme:
The simple and easy platform of the only leg taper pile in a kind of sea; Comprise: upper module, be installed in the substructure below the upper module; It is characterized in that: substructure is a pillar with single leg that is installed in upper module bottom centre; The periphery of this pillar with single leg is provided with the piling bar of several inclinations, and the bottom of this upper module is equipped with waterproof casing, through the above-mentioned simple and easy platform structure of an only leg taper pile that connects and composes.
Said pillar with single leg is by the steel pipe manufacturing.
Be to adopt the piling bar guidance set to be linked to be an integral body between the piling bar of said pillar with single leg and several inclinations, and the piling bar of several inclinations is positioned at orthogonal two planes.
The piling bar of said inclination is welded to connect into an integral body at the top by the imperial crown plate with the piling bar guidance set.
Said waterproof casing is installed in the inside of pillar with single leg or is parallel to the outside that pillar with single leg is installed on pillar with single leg.
Adopt the guiding connected mode to be connected between the top of said waterproof casing and the deck on upper module, employing clamp connected mode connects as one between waterproof casing and the pillar with single leg.
The beneficial effect of the utility model: the utility model is owing to adopt technique scheme; It is simple in structure; Can under the prerequisite that satisfies the offshore production job requirements, simplify numerous and diverse space frame structure, reduce the use amount of steel significantly; Shorten construction duration, practiced thrift construction cost; Simultaneously,, therefore, alleviated each several part weight, also just reduced requirement, practiced thrift installation cost again the offshore construction boats and ships because each assembly of simple and easy platform is to connect through the mode that assemble at the sea.
Description of drawings:
Fig. 1 is the prior art structural representation.
Fig. 2 is the utility model structural representation.
Main label declaration among the figure:
1. upper module, 2. substructure, 3. column, 4. piling bar, 5. supporting steel pipe, 6. waterproof casing, 7. cable protecting tube, 8. deck, 9. piling bar, 10. piling bar guidance set.
The specific embodiment
As shown in Figure 2; The utility model comprises: upper module 1, be installed in passive substructure 2 below the upper module 1, wherein, various productions and living facilities (figure does not show) can be installed on the deck 8 of upper module 1; Substructure 2 is for being installed in the pillar with single leg 3 of upper module 1 bottom centre; Pillar with single leg 3 is by the steel pipe manufacturing, when installing, adopts welding manner to connect as one between upper module 1 and the pillar with single leg 3 at sea; And pillar with single leg 3 is squeezed into to setting the mud degree of depth by pile hammer.The periphery of pillar with single leg 3 is provided with the piling bar 9 of several inclinations; Present embodiment is: the piling bar that is provided with two inclinations; Be to adopt piling bar guidance set 10 to be linked to be an integral body between the piling bar 9 of pillar with single leg 3 and inclination; The piling bar 9 of two inclinations is positioned at orthogonal two planes, in order to the environmental load of opposing from all directions; When at sea installing, the piling bar 9 of several inclinations is welded to connect into an integral body at the top by the imperial crown plate with piling bar guidance set 10; And through piling bar guidance set 10 piling bar 9 that tilts is squeezed into to setting the mud degree of depth by pile hammer.
The bottom of upper module 1 is equipped with waterproof casing 6; Present embodiment is:; Waterproof casing 6 is parallel to that pillar with single leg 3 is installed in the outside of pillar with single leg or waterproof casing 6 is directly installed on the inside of pillar with single leg 3; During installation, respectively pillar with single leg 3 and waterproof casing 6 are squeezed into to setting the mud degree of depth by pile hammer.Adopt the clamp connected mode to connect as one between pillar with single leg 3 and the waterproof casing 6, waterproof casing 6 is not born upper load.Adopt the clamp connected mode to connect as one between standpipe and cable protecting tube 7 and the pillar with single leg 3.Adopt the guiding connected mode to be connected between the top of waterproof casing 6 and the deck 8 on upper module 1, waterproof casing 6 only transmits the level environment load at this.
Clamp, piling bar guidance set are prior art.
The above; It only is the preferred embodiment of the utility model; Be not that the utility model is done any pro forma restriction; Every technical spirit according to the utility model all still belongs in the scope of the utility model technical scheme any simple modification, equivalent variations and modification that above embodiment did.
Claims (6)
1. simple and easy platform of the only leg taper pile in sea; Comprise: upper module, be installed in the substructure below the upper module; It is characterized in that: substructure is a pillar with single leg that is installed in upper module bottom centre; The periphery of this pillar with single leg is provided with the piling bar of several inclinations, and the bottom of this upper module is equipped with waterproof casing, through the above-mentioned simple and easy platform structure of an only leg taper pile that connects and composes.
2. the simple and easy platform of the only leg in sea according to claim 1 is characterized in that: said pillar with single leg is by the steel pipe manufacturing.
3. the simple and easy platform of the only leg in sea according to claim 1 and 2 is characterized in that: be to adopt the piling bar guidance set to be linked to be an integral body between the piling bar of said pillar with single leg and several inclinations, and the piling bar of several inclinations is positioned at orthogonal two planes.
4. the simple and easy platform of the only leg in sea according to claim 3 is characterized in that: the piling bar of said inclination is welded to connect into an integral body at the top by the imperial crown plate with the piling bar guidance set.
5. the simple and easy platform of the only leg in sea according to claim 1 is characterized in that: said waterproof casing is installed in the inside of pillar with single leg or is parallel to the outside that pillar with single leg is installed on pillar with single leg.
6. according to claim 1 or the simple and easy platform of the only leg in 5 described seas; It is characterized in that: adopt the guiding connected mode to be connected between the top of said waterproof casing and the deck on upper module, employing clamp connected mode connects as one between waterproof casing and the pillar with single leg.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220247224 CN202610784U (en) | 2012-05-29 | 2012-05-29 | One-legged raking pile simple platform at sea |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220247224 CN202610784U (en) | 2012-05-29 | 2012-05-29 | One-legged raking pile simple platform at sea |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202610784U true CN202610784U (en) | 2012-12-19 |
Family
ID=47344496
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220247224 Expired - Lifetime CN202610784U (en) | 2012-05-29 | 2012-05-29 | One-legged raking pile simple platform at sea |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202610784U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112681274A (en) * | 2020-12-02 | 2021-04-20 | 中国电建集团华东勘测设计研究院有限公司 | Self-floating and self-elevating offshore electrical platform and installation method thereof |
-
2012
- 2012-05-29 CN CN 201220247224 patent/CN202610784U/en not_active Expired - Lifetime
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112681274A (en) * | 2020-12-02 | 2021-04-20 | 中国电建集团华东勘测设计研究院有限公司 | Self-floating and self-elevating offshore electrical platform and installation method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101857072B (en) | Unconditional stability equipped deep-draft floating production platform and offshore installation method thereof | |
CN101798807B (en) | Heavy-draft truss upright-column combined platform | |
CN103129715B (en) | Conduit-rack semi-submersible type oil-extraction platform | |
CN201961509U (en) | Unconditional stability equipped deep-draft floating oil production platform | |
US20080213048A1 (en) | Method for fabricating and transporting an integrated buoyancy system | |
CN102616344A (en) | Heavy draught truss type floating platform | |
CN102080520A (en) | Deepwater subsea manifold structure | |
CN2911009Y (en) | One-leg three-pile simple platform suitable for developing medium-small oil fields in sea | |
CN107140138A (en) | A kind of dry tree oil storage semi-submersible type production platform of deep drinking water | |
CN206204912U (en) | The multifunctional girder structure of self-elevating ocean platform | |
CN201647096U (en) | Modular platform for deep draft truss column | |
CN103046521A (en) | Novel, simple and easy wellhead rack structure and construction method | |
CN201963273U (en) | Deep-water underwater pipe manifold structure | |
CN102582786A (en) | Building process for deep sea spar platform | |
CN103046906A (en) | Novel subsea manifold basic structure | |
CN105292392A (en) | Relocatable self-elevating drilling production platform and self-installing and recycling method thereof | |
CN203094391U (en) | Semi-submersible platform with heave plates | |
CN104088266A (en) | Standardized movable wellhead platform installed in floatover mode | |
CN204491564U (en) | A kind of jacket for offshore structure | |
CN202610781U (en) | Single-leg simple platform at sea | |
CN202610784U (en) | One-legged raking pile simple platform at sea | |
CN103482036A (en) | Buoyancy tower type ocean platform | |
CN101424177B (en) | Down-in type marginal oil field underwater drilling basal disc for drilling ship and manufacture and installation method | |
CN202414124U (en) | Multi-vertical-column truss type platform | |
CN203684192U (en) | Offshore jacket production platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 100010 Chaoyangmen North Street, Dongcheng District, Dongcheng District, Beijing Co-patentee after: Offshore Oil Engineering Co., Ltd. Patentee after: China Offshore Oil Group Co., Ltd. Address before: 100010 Chaoyangmen North Street, Dongcheng District, Dongcheng District, Beijing Co-patentee before: Offshore Oil Engineering Co., Ltd. Patentee before: China National Offshore Oil Corporation |
|
CP01 | Change in the name or title of a patent holder | ||
CX01 | Expiry of patent term |
Granted publication date: 20121219 |
|
CX01 | Expiry of patent term |