CN202609829U - Vertical multifunctional combination device for concrete precast tower crane combination foundation connecting tower crane - Google Patents

Vertical multifunctional combination device for concrete precast tower crane combination foundation connecting tower crane Download PDF

Info

Publication number
CN202609829U
CN202609829U CN 201220063444 CN201220063444U CN202609829U CN 202609829 U CN202609829 U CN 202609829U CN 201220063444 CN201220063444 CN 201220063444 CN 201220063444 U CN201220063444 U CN 201220063444U CN 202609829 U CN202609829 U CN 202609829U
Authority
CN
China
Prior art keywords
tower machine
sleeve gasket
tower crane
mainboard
support sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220063444
Other languages
Chinese (zh)
Inventor
张月梅
张思俭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 201220063444 priority Critical patent/CN202609829U/en
Application granted granted Critical
Publication of CN202609829U publication Critical patent/CN202609829U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a vertical multifunctional combination device for a concrete precast tower crane combination foundation connecting tower crane, belongs to foundation fixation of a building tower crane and particularly relates to connection of a concrete precast tower crane combination foundation and a tower crane. Aiming at solving the problems, the utility model provides the vertical multifunctional combination device for the concrete precast tower crane combination foundation connecting tower crane with the advantages that the connection of the tower crane foundation and the tower crane is convenient, and the cost is low. The vertical multifunctional combination device has the technical scheme that the center of a main plate is provided with a first support sleeve pad, four first long holes are radially arranged on the main plate on the periphery of the first support sleeve pad, the included angle between the two adjacent first long holes is 90 degrees, a first support sleeve pad matched with the first long hole is respectively arranged on each first long hole, a second long hole is at least arranged between the at least two first long holes and the third support sleeve pad, and a second support sleeve pad matched with the second long hole is respectively arranged on each second long hole. The vertical multifunctional combination device is used for connecting the tower crane foundation and a tower crane base.

Description

The prefabricated tower machine combination of concrete basis connects the vertical composite set of using of tower machine more
Technical field
The prefabricated tower machine of the utility model concrete combination basis connects the vertical many of tower machine and use composite set, belongs to the basic fixed of building tower crane, be specifically related to the prefabricated tower machine combination of concrete basic with being connected of tower machine.
Background technology
The prefabricated tower machine combination of present concrete basis has site operation cycle weak point, transports convenient to disassembly; Improve the service efficiency and the advantages such as use cost of practicing thrift the tower machine of tower machine, thereby obtain the good application of whole construction market, but in the application on the prefabricated tower machine combination of concrete basis; Tower machine producer is numerous, and many especially countless of model problems such as supporting model is too much occur through regular meeting; Increased productive costs greatly, also do not had the relevant criterion standard of unification of the motherland at present, so though the prefabricated tower machine combination of concrete basis is arranged; But can not use smoothly because of asynthesis, the tower machine often runs into a difficult problem that is difficult to mate when being connected with the prefabricated tower machine combination of concrete basis.
The utility model content
The utility model overcomes the existing in prior technology deficiency, and problem to be solved provides a kind of vertical composite sets of using that foundation for tower crane is connected with the tower machine, the basis of the prefabricated tower machine combination of concrete cheaply connects the tower machine of being convenient to more.
In order to solve the problems of the technologies described above; The technical scheme that the utility model adopted is: the prefabricated tower machine combination of concrete basis connects vertical composite sets of using of tower machine more; Comprise that mainboard, first supports sleeve gasket, second and supports sleeve gasket and the 3rd support sleeve gasket; The central mounting of mainboard has one the 3rd to support sleeve gasket; Be radial four first slotted holes that on mainboard, have around the 3rd support sleeve gasket, the angle between per two first adjacent slotted holes is 90 °, and first a support sleeve gasket that is complementary with it all is installed on each first slotted hole; At least two first slotted holes and the 3rd support between the sleeve gasket and all have one second slotted hole, and second a support sleeve gasket that is complementary with it all is installed on each second slotted hole.
Have a plurality of circular holes on the described mainboard.
Described mainboard or be square or be criss-cross, or is circle.
The center of said mainboard has a centre hole, and the described the 3rd supports sleeve gasket is installed on the centre hole.
The structure that the said first support sleeve gasket, second supports sleeve gasket and the 3rd support sleeve gasket is: internal diameter is not less than the hollow cylinder of its hole internal diameter that is complementary.
Described all first slotted holes, second slotted hole and centre hole top are equipped with the groove that the support sleeve gasket that is complementary with it is installed.
The bottom of described all first slotted holes and second slotted hole all has the groove that is used to lay nut greater than its internal diameter.
The edge of described mainboard is provided with a plurality of centers scale mark.
The utility model compared with prior art has following beneficial effect.
1, the utility model uses bolt with mainboard and the prefabricated tower machine combination of concrete basic fixed, with bolt mainboard is connected with the tower machine then, and support with the support sleeve advance expenditure centre; Mainboard and tower machine bonded assembly hole are microscler, and mainboard is provided with a plurality of slotted holes, and very big adjustment space is arranged; Be applicable to the tower machine of multiple model; Simple in structure, being convenient to connect again can repeated use, has reduced cost.
2, the utility model is installed in its coupling hole with the support sleeve gasket, supports the tower machine base, and the groove on the hole has guaranteed to support the steadiness of sleeve gasket again, make its can be in installation process deviation post, made things convenient for being connected of the prefabricated tower machine combination of concrete basis and mainboard.
3, the center on four jiaos of the utility model and four limits is equipped with the center scale mark, and making when installing has reference point, is convenient to install.
Description of drawings
Below in conjunction with accompanying drawing the utility model is described further.
Fig. 1 is the structural representation of the utility model embodiment one.
Fig. 2 is the A-A cutaway view of Fig. 1 running condition.
Fig. 3 is the structural representation of the utility model embodiment two.
Fig. 4 is the B-B cutaway view of Fig. 3 running condition.
Fig. 5 is the slot scheme drawing of first slotted hole and second slotted hole.
Fig. 6 is a kind of slotted eye scheme drawing of first slotted hole and second slotted hole.
Fig. 7 is the another kind of slotted eye scheme drawing of first slotted hole and second slotted hole.
Among the figure: 1 is mainboard, and 2 is the first support sleeve gasket, and 3 is the second support sleeve gasket, and 4 is centre hole; 5 is first slotted hole, and 6 is circular hole, and 7 is second slotted hole, and 8 is the 3rd support sleeve gasket; 9 is the center scale mark, and 10 is the prefabricated tower machine combination of concrete basis, and 11 is the tower machine base; 12 is first bolt, and 13 is second bolt, and 14 is the vertical steel member that connects in basis.
The specific embodiment
The prefabricated tower machine combination of concrete shown in Fig. 1-7 basis connects vertical composite sets of using of tower machine more; Comprise that mainboard 1, first supports sleeve gasket 2, second and supports sleeve gasket 3 and the 3rd support sleeve gasket 8; The central mounting of mainboard 1 has one the 3rd to support sleeve gasket 8; Be radial four first slotted holes 5 that on mainboard 1, have around the 3rd support sleeve gasket 8; Angle between per two first adjacent slotted holes 5 is 90 °; All be equipped with on each first slotted hole 5 between first support 2, at least two first slotted holes 5 of sleeve gasket that are complementary with it and the 3rd support sleeve gasket 8 and all have one second slotted hole 7, second a support sleeve gasket 3 that is complementary with it all is installed on each second slotted hole 7.
Have a plurality of circular holes 6 on the described mainboard 1.
Described mainboard 1 or be square or be criss-cross, or is circle.
The center of said mainboard 1 has a centre hole 4, and the described the 3rd supports sleeve gasket 8 is installed on the centre hole 4.
The structure that the said first support sleeve gasket 2, second supports sleeve gasket 3 and the 3rd support sleeve gasket 8 is: internal diameter is not less than the hollow cylinder of its hole internal diameter that is complementary.
Described all first slotted holes 5, second slotted hole 7 and centre hole 4 tops are equipped with the groove that the support sleeve gasket that is complementary with it is installed.
The bottom of described all first slotted holes 5 and second slotted hole 7 all has the groove that is used to lay nut greater than its internal diameter.
The edge of described mainboard 1 is provided with a plurality of centers scale mark 9.
Embodiment one, like Fig. 1, shown in Figure 2
Connect the method for application of leg when the tower machine base of four above bolts:
The first step is made the prefabricated tower machine combination of concrete basis 10, casting concrete and in cement concrete the relevant position embedded foundation vertically connect steel member 14;
Second step; In each first slotted hole 5 of mainboard 1, all place one second bolt 13; First bolt 12 more than two is installed on the pre-buried basis of the first step vertical the connection in position with reference to circular hole 6 on the mainboard 1 on the steel member 14, mainboard 1 is placed on the prefabricated tower machine combination of the concrete basis 10 again, and first bolt 12 is sleeved in the circular hole 6 of mainboard 1; The nut of on each first bolt 12, screwing on, fixedly mainboard 1 and the prefabricated tower machine combination of concrete basis 10;
The 3rd step; Supporting sleeve gasket 2 with first is sleeved on second bolt 13 in its corresponding first slotted hole 5; The 3rd supports sleeve gasket 8 is installed on the centre hole 4; Again tower machine base 11 is placed on and supports the sleeve gasket top, adjust second bolt 13 through tower machine base 11 lower margin holes, and with nut screwing clamping fixedly mainboard 1 and tower machine base 11.
Connect the method for application of leg when the tower machine base of two above bolts:
The first step is made the prefabricated tower machine combination of concrete basis 10, casting concrete and in cement concrete the relevant position embedded foundation vertically connect steel member 14;
Second step; In two second slotted holes 7 of mainboard 1, all place one second bolt 13; First bolt 12 more than two is installed on the pre-buried basis of the first step vertical the connection in position with reference to circular hole 6 on the mainboard 1 on the steel member 14, mainboard 1 is placed on the prefabricated tower machine combination of the concrete basis 10 again, and first bolt 12 is sleeved in the circular hole 6 of mainboard 1; The nut of on each first bolt 12, screwing on, fixedly mainboard 1 and the prefabricated tower machine combination of concrete basis 10;
The 3rd step; Supporting sleeve gasket 3 with second is sleeved on second bolt 13 in its corresponding second slotted hole 7; The 3rd supports sleeve gasket 8 is installed on the centre hole 4; Again tower machine base 11 is placed on and supports the sleeve gasket top, adjust second bolt 13 through tower machine base 11 lower margin holes, and with nut screwing clamping fixedly mainboard 1 and tower machine base 11.
Embodiment two, like Fig. 3, shown in Figure 4
Connect the method for application of leg when the tower machine base of four above bolts:
The first step is made the prefabricated tower machine combination of concrete basis 10, casting concrete and in cement concrete the relevant position embedded foundation vertically connect steel member 14;
Second step; In each first slotted hole 5 of mainboard 1, all place one second bolt 13; First bolt 12 more than two is installed on the pre-buried basis of the first step vertical the connection in position with reference to two the second relative slotted holes 7 on the mainboard 1 on the steel member 14, mainboard 1 is placed on the prefabricated tower machine combination of the concrete basis 10 again, and first bolt 12 is sleeved in second slotted hole 7 of mainboard 1; The nut of on each first bolt 12, screwing on, fixedly mainboard 1 and the prefabricated tower machine combination of concrete basis 10;
The 3rd step; Supporting sleeve gasket 2 with first is sleeved on second bolt 13 in its corresponding first slotted hole 5; The 3rd supports sleeve gasket 8 is installed on the centre hole 4; Again tower machine base 11 is placed on and supports the sleeve gasket top, adjust second bolt 13 through tower machine base 11 lower margin holes, and with nut screwing clamping fixedly mainboard 1 and tower machine base 11.
Connect the method for application of leg when the tower machine base of two above bolts:
The first step is made the prefabricated tower machine combination of concrete basis 10, casting concrete and in cement concrete the relevant position embedded foundation vertically connect steel member 14;
Second step; In two the second relative slotted holes 7 of mainboard 1, all place one second bolt 13; Two first bolts 12 are installed on the pre-buried basis of the first step vertical the connection in position with reference to two other second slotted hole 7 on the mainboard 1 on the steel member 14, mainboard 1 is placed on the prefabricated tower machine combination of the concrete basis 10 again, and first bolt 12 is sleeved in two second slotted holes 7 of mainboard 1; The nut of on each first bolt 12, screwing on, fixedly mainboard 1 and the prefabricated tower machine combination of concrete basis 10;
The 3rd step; Supporting sleeve gasket 3 with second is sleeved on second bolt 13 in its corresponding two second slotted holes 7; The 3rd supports sleeve gasket 8 is installed on the centre hole 4; Again tower machine base 11 is placed on and supports the sleeve gasket top, adjust second bolt 13 through tower machine base 11 lower margin holes, and with nut screwing clamping fixedly mainboard 1 and tower machine base 11.
Combine accompanying drawing that the embodiment of the utility model has been done detailed description above; But the utility model is not limited to the foregoing description; In the ken that those of ordinary skills possessed, can also under the prerequisite that does not break away from the utility model aim, make various variations.For example, one, the support sleeve gasket in the utility model can be to be movably arranged on the hole, also can or directly be connected as a single entity according to condition of service and mainboard weld together; Two, in the utility model porose shape be not limited to oblong, oval or circular, also can be the arbitrary shape that those skilled in the art can expect; Three, the shaped tiles in the utility model is not limited to square, and criss-cross or circle also can be the arbitrary shape that those skilled in the art can expect.

Claims (8)

1. the prefabricated tower machine combination of concrete basis connects vertical composite sets of using of tower machine more; Comprise that mainboard (1), first supports sleeve gasket (2), second and supports sleeve gasket (3) and the 3rd support sleeve gasket (8); It is characterized in that: the central mounting of mainboard (1) has one the 3rd to support sleeve gasket (8); Be radial four first slotted holes (5) that on mainboard (1), have around the 3rd support sleeve gasket (8); Angle between per two adjacent first slotted holes (5) is 90 °; A first support sleeve gasket (2) that is complementary with it all is installed on each first slotted hole (5), and at least two first slotted holes (5) and the 3rd support between the sleeve gasket (8) and all have one second slotted hole (7), and second a support sleeve gasket (3) that is complementary with it all is installed on each second slotted hole (7).
2. the prefabricated tower machine combination of concrete according to claim 1 basis connects the vertical of tower machine more and uses composite set, it is characterized in that: have a plurality of circular holes (6) on the described mainboard (1).
3. the prefabricated tower machine of concrete according to claim 1 combination basis connects the vertical many of tower machine and use composite set, it is characterized in that: described mainboard (1) or be square, or be criss-cross, or be circle.
4. the prefabricated tower machine combination of concrete according to claim 1 basis connects vertical composite sets of using of tower machine more; It is characterized in that: the center of said mainboard (1) has a centre hole (4), and the described the 3rd supports sleeve gasket (8) is installed on the centre hole (4).
5. connect the vertical many of tower machine according to the prefabricated tower machine combination of claim 1 or 4 described concretes basis and use composite set, it is characterized in that: said first supports the structure that sleeve gasket (2), second supports sleeve gasket (3) and the 3rd support sleeve gasket (8) is: internal diameter is not less than the hollow cylinder of its hole internal diameter that is complementary.
6. the prefabricated tower machine combination of concrete according to claim 5 basis connects the vertical of tower machine more and uses composite set, and it is characterized in that: described all first slotted holes (5), second slotted hole (7) and centre hole (4) top are equipped with the groove that the support sleeve gasket that is complementary with it is installed.
7. the prefabricated tower machine combination of concrete according to claim 1 basis connects the vertical of tower machine more and uses composite set, and it is characterized in that: the bottom of described all first slotted holes (5) and second slotted hole (7) all has the groove that is used to lay nut greater than its internal diameter.
8. the prefabricated tower machine combination of concrete according to claim 1 basis connects the vertical of tower machine more and uses composite set, and it is characterized in that: the edge of described mainboard (1) is provided with a plurality of centers scale marks (9).
CN 201220063444 2012-02-27 2012-02-27 Vertical multifunctional combination device for concrete precast tower crane combination foundation connecting tower crane Expired - Fee Related CN202609829U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220063444 CN202609829U (en) 2012-02-27 2012-02-27 Vertical multifunctional combination device for concrete precast tower crane combination foundation connecting tower crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220063444 CN202609829U (en) 2012-02-27 2012-02-27 Vertical multifunctional combination device for concrete precast tower crane combination foundation connecting tower crane

Publications (1)

Publication Number Publication Date
CN202609829U true CN202609829U (en) 2012-12-19

Family

ID=47343544

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220063444 Expired - Fee Related CN202609829U (en) 2012-02-27 2012-02-27 Vertical multifunctional combination device for concrete precast tower crane combination foundation connecting tower crane

Country Status (1)

Country Link
CN (1) CN202609829U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105544587A (en) * 2015-12-10 2016-05-04 上海建工一建集团有限公司 Combined tower crane foundation and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105544587A (en) * 2015-12-10 2016-05-04 上海建工一建集团有限公司 Combined tower crane foundation and construction method thereof

Similar Documents

Publication Publication Date Title
CN202012135U (en) Connecting piece for building and building structure system applying the connecting piece thereof
CN203961021U (en) A kind of prefabricated panel and precast beam rapid installing connection structure
CN202609829U (en) Vertical multifunctional combination device for concrete precast tower crane combination foundation connecting tower crane
CN202989940U (en) Single-layered foundation bolt cage
CN204250308U (en) A kind of jacking apparatus of hatch cover
CN203872113U (en) Photovoltaic bracket fixing structure
CN202787307U (en) Foundation bolt positioning template
CN203821429U (en) Preburied bolt installation fixing apparatus of electrical equipment
CN202055602U (en) Multi-functional emergency iron tower foundation for power transmission lines
CN202817599U (en) Jumper wire bracing frame
CN202247939U (en) Sizing block-free equipment installation mechanism
CN203067932U (en) Bridge cable pylon
CN205776305U (en) A kind of three pipe tower sill anchor positioners
CN204662489U (en) A kind of conveying circuit bracket base pre-embedded device
CN203622329U (en) Supporting tool for assembling deep-well pump lifting pipe
CN202131816U (en) Fixing device of communication tower
CN202322122U (en) Tower crane and foundation transition device thereof
CN202850211U (en) Error-correcting connector
CN201952810U (en) Foundation anchor bolt positioning plug
CN202091724U (en) Combined type anchor bolt pre-buried component of lamp foundation
CN201433567Y (en) Post type embedded part positioning device
CN204098440U (en) A kind of decorative thread ten thousand ties up rotating connector
CN104196213B (en) A kind of decorative thread ten thousand ties up rotating connector
CN202992541U (en) Double-layered anchor bolt cage
CN203701134U (en) Novel foundation bolt set

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121219

Termination date: 20150227

EXPY Termination of patent right or utility model