CN202601080U - Movable Grant chart compiling tool - Google Patents
Movable Grant chart compiling tool Download PDFInfo
- Publication number
- CN202601080U CN202601080U CN 201220156095 CN201220156095U CN202601080U CN 202601080 U CN202601080 U CN 202601080U CN 201220156095 CN201220156095 CN 201220156095 CN 201220156095 U CN201220156095 U CN 201220156095U CN 202601080 U CN202601080 U CN 202601080U
- Authority
- CN
- China
- Prior art keywords
- piece
- chart
- gunter
- gantt chart
- teams
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Drawing Aids And Blackboards (AREA)
Abstract
The utility model discloses a movable Grant chart compiling tool, which belongs to Gantt chart compiling tools in a national project management sand-table competition, and is mainly used for compiling a Gantt chart clearly, concisely and rapidly. The tool comprises a Gantt chart board, I-shaped blocks and cuboid blocks, wherein surfaces of the cuboid blocks are printed with member numbers, and the I-shaped blocks are used to represent working output in each week of each labor group. The I-shaped blocks are moved on the Gantt chart board, so that the Gantt chart is compiled rapidly, wherein erasing and testing links in the compiling and adjusting process are saved, and the drawing efficiency is improved; and movement of the I-shaped blocks enables thinking process during compiling to be displayed on the board, which promotes cooperation of group members, and enhancing cooperation spirits in the group.
Description
Technical field
The utility model relates to a kind of packaged type establishment Gantt chart instrument, belongs to the instrument of establishment Gantt chart in the contest of national project management sand table, be mainly used in clear, work out Gantt chart succinctly, fast.
Technical background
In order to improve the adaptive faculty of university student under the fierce market competition environment; Wide Lian Da company has held the contest of project management sand table in the whole nation; Being intended to cultivate student's integrated use has gained knowledge and has taken action on one's own to solve the ability of enterprise practical problem; Strengthen undergraduate project management knowledge, improve manipulative ability, promote undergraduate overall qualities comprehensively, strengthen undergraduate employment competition advantage.This match is considered the Whole Course Management that engineering project finishes until completion of works from engineering acceptance of the bid beginning based on engineering construction unit visual angle; Through the simulating reality work progress, make student enrollment's registration leading zero apart from experiencing construction enterprises' practical project project management operation.
In this match, the establishment of programming phase Gantt chart is the key of the last victory or defeat of decision race-entry group, and its directly good and bad and final profit of project is got in touch, yet in the process of establishment Gantt chart, but has many problems:
1. in order to work out optimum scheme, in the process of establishment, need constantly relatively and trial, yet think during the course that interim change pillar and the sequence of construction between the pillar can be very loaded down with trivial details; If it is good to make the scheme of revising before the back is found to be not so good as to revise during the course, the scheme of wanting to change back before revising is difficult especially.Because the scheme vestige in the process of wiping and revising before revising has disappeared completely, add the influence of being revised the back thinking, the thinking of scheme is also interrupted completely before revising; At this moment the organizer understand thinking completely without; The brains complete confusion, the accent of having to begins, and loses time very much.
2. after Gantt chart is finished substantially, need carry out the part and transfer with the reduction of erection time, when seeking preferred plan, its process is complicated especially and difficult.There has been new thinking to want to attempt, but worried that the scheme before the debugging back is not as debugging is good, and can't reduce scheme before the debugging this moment, irresolute; Do not debug, do not know again which scheme is good on earth, unwilling in the heart.
3. generally work out Gantt chart in the group separately separately, the common completion of can't cooperating with each other will certainly be walked some detours in the process; After working out, spend the plenty of time to compare the quality of different schemes in the group again, this has had a strong impact on the efficient and the quality of Gantt chart establishment.
Summary of the invention
To the many shortcomings that exist in the present national project management sand table contest establishment Gantt chart process, the utility model provides a kind of packaged type establishment Gantt chart instrument.
The utility model is realized through following technical scheme: a kind of packaged type is worked out the Gantt chart instrument, comprises I shape piece and a plurality of rectangular parallelepiped piece of a plurality of three kinds of different colors of gunter chart board and the split of gunter chart board; Described gunter chart board is to have the chart board that magnetic attaches function, obdurability, on the front of gunter chart board, is printed with the form that is used to work out Gantt chart; Described I shape piece and rectangular parallelepiped piece can be adsorbed on the gunter chart board and can move; The I shape piece of three kinds of different colors is respectively applied for expression: reinforcing bar teams and groups work output/week; One template teams and groups work output/week; One concrete teams and groups work output/week; Be printed on the member numbering on rectangular parallelepiped piece surface; The length of a cycle of expression is identical on the length of each I shape piece and the gunter chart board, width be on the gunter chart board working procedure length 1/2.
Concrete method of application is: in establishment Gantt chart process, replace each labor service teams and groups unit week work output with the I shape piece, through on the gunter chart board, moving; Reach the purpose of quick establishment Gantt chart, saved wiping, test ring joint in establishment, the debug process, improved drawing efficiency; And the thinking processes in the time of will working out; Appear vividly clearly " on the plate " through moving of I shape piece, promote group member's cooperation, strengthened the team spirit of team.
The beneficial effect of the utility model is:
1. will work out the thinking of Gantt chart, appear vividly clearly " on the plate " strengthened visuality.
2. when the Gantt chart scheme being debugged, convenient and swift, wiping in the middle of saving, test ring joint, thinking is not easy to upset; New thinking can access fast and attempt, and broadens one's scope of mind so more easily, produces inspiration.
3. open to discussion in the group, accomplish the establishment of Gantt chart jointly, improve the speed and the quality of establishment Gantt chart greatly.
4. according to actual needs, make the suitable magnet board of a block size, this achievement is introduced the classroom of university's " construction organization design " subject; Through practical operation establishment Gantt chart; Its knowwhy is shown clearly, improve undergraduate interest, strengthen classroom learning efficient.
Description of drawings
Fig. 1 is the utility model one-piece construction synoptic diagram;
Fig. 1 a is an I shape piece synoptic diagram;
Fig. 1 b is a rectangular parallelepiped piece synoptic diagram;
Fig. 2 is an embodiment PORT OF TIANJIN construction drawing synoptic diagram;
Fig. 3 prepares synoptic diagram when member D-1 begins in the embodiment PORT OF TIANJIN;
Fig. 4 is the first procedure synoptic diagram of reinforcing bar teams and groups of member D-1 in the embodiment PORT OF TIANJIN;
Fig. 5 is the first procedure synoptic diagram of two reinforcing bar teams and groups of member D-1 in the embodiment PORT OF TIANJIN;
Fig. 6 is the second operation work synoptic diagram of template teams and groups of member D-1 in the embodiment PORT OF TIANJIN;
Fig. 7 is the second operation work synoptic diagram of two template teams and groups of member D-1 in the embodiment PORT OF TIANJIN;
Fig. 8 is the three process synoptic diagram of concrete teams and groups of member D-1 in the embodiment PORT OF TIANJIN;
Fig. 9 is the overall schedule in embodiment PORT OF TIANJIN---a Gantt chart synoptic diagram.
Among the figure: 1, gunter chart board, 2, I-shaped, 1. blue I-shaped, 2. orange I-shaped, 3. the purple color mixture of powder is I-shaped, and 3, the rectangular parallelepiped piece.
Embodiment
Below in conjunction with accompanying drawing and embodiment the utility model nearly is gone on foot explanation.
As shown in Figure 1, a kind of packaged type is worked out the gunter chart board, comprises I shape piece 2 and a plurality of rectangular parallelepiped piece 3 of gunter chart board 1, a plurality of three kinds of different colors; Described gunter chart board 1 is for to have the chart board that magnetic attaches function, obdurability, and magnetic attaches function, the obdurability material is processed by having.On the front of gunter chart board 1, be printed with the form that is used to work out Gantt chart; In the embedding of the bottom surface of each I shape piece 2 and rectangular parallelepiped piece 3 permanent magnet is arranged, I shape piece 2 and rectangular parallelepiped piece 3 can be adsorbed on the gunter chart board 1 also can move; The I shape piece 2 of three kinds of different colors is respectively applied for representative: reinforcing bar teams and groups work output/week; One template teams and groups work output/week; One concrete teams and groups work output/week; Be printed on the member numbering on rectangular parallelepiped piece 3 surfaces.
2 fens oranges of above-mentioned I shape piece, indigo plant, three kinds of colors of the purple color mixture of powder, 1. a blue I shape piece representes reinforcing bar teams and groups work 5 tons/week of output; 2. an orange I shape piece representes template teams and groups work output 5 square meters/week; 3. the purple color mixture I shape of a powder piece representes concrete teams and groups work 10 cubes/week of output.
In the present embodiment: totally 15 of rectangular parallelepiped pieces 3; Upper surface is printed on JC, D-1~D-4, B-12, B-23, B-34, B-13, B-14, B-24 member numbering respectively, remain four subsequent use.The I shape piece of every kind of color is 15~30 in the I shape piece 2 of three kinds of different colors.
Concrete method for making is: the form that will be used to work out Gantt chart is printed on to have magnetic and attaches on the thin plate that function, obdurability material make and process gunter chart board 1.Respectively 15~30 of the I shape pieces 2 of indigo plant made of plastic then, orange, three kinds of colors of the purple mixing of powder, the bottom surface embeds permanent magnet, can be adsorbed on the gunter chart board 1.Wherein, 1. a blue I shape piece representes reinforcing bar teams and groups work 5 tons/week of output; 2. one orange I shape piece representes template teams and groups work output 5 square meters/week; 3. the purple color mixture I shape of one powder piece representes concrete teams and groups work 10 cubes/week of output.Totally 15 of rectangular parallelepiped pieces 3 made of plastic, upper surface are printed on members such as JC, D-1~D-4, B-12, B-23, B-34, B-13, B-14, B-24 numbering respectively, remain four subsequent use.
Embodiment
Utilize first project management sand table contest examination question in the achievement establishment whole nation of the utility model: the schedule of PORT OF TIANJIN---Gantt chart.
The PORT OF TIANJIN construction drawing is as shown in Figure 2.
The drawing explanation: each member comprises three operations; Post (reinforcing bar binding-formwork erection-concrete is built) plate (formwork erection-reinforcing bar binding-concrete is built); After two pillar concretes had been built, the plate of its top can be constructed, after concreting is accomplished; The template circulation material can be removed, and the construction of template teams and groups need not be considered form removal and maintenance.
Bill of quantities: the quantities of describing this each member working procedure of project engineering
Concrete operation method is:
With member D-1 is example
As shown in Figure 3, at first get the purple color mixture I shape of rectangular parallelepiped piece D-1,1. two of blue I shape pieces, 2. two of orange I shape pieces, powder piece 3. one be placed on respectively on the corresponding position.
First procedure: tie up reinforcing bar
As shown in Figure 4, if teams and groups, 1. two blue I shape pieces be arranged in order move to second all corresponding positions.
As shown in Figure 5, if 1. two teams and groups move to second all corresponding positions side by side with two blue I shape pieces.
Second operation work a: template
As shown in Figure 6, if teams and groups, 2. two orange I shape pieces be arranged in order move to the 3rd all corresponding positions.
As shown in Figure 7, if 2. two teams and groups move to the 3rd all corresponding positions side by side with two orange I shape pieces.
Three process: pouring concrete
As shown in Figure 8,3. the purple color mixture I shape of powder piece moved to the around the corresponding position.
Other members are the same.
The overall schedule in PORT OF TIANJIN---Gantt chart is as shown in Figure 9.
Claims (5)
1. a packaged type establishment Gantt chart instrument is characterized in that: the I shape piece (2) and a plurality of rectangular parallelepiped piece (3) that comprise a plurality of three kinds of different colors of gunter chart board (1) and the split of gunter chart board; Described gunter chart board (1) is printed with the form that is used to work out Gantt chart for to have the chart board that magnetic attaches function, obdurability on the front of gunter chart board (1); Described I shape piece (2) and rectangular parallelepiped piece (3) can be adsorbed on the gunter chart board and can move; The I shape piece (2) of three kinds of different colors is respectively applied for representative: reinforcing bar teams and groups work output/week; One template teams and groups work output/week; One concrete teams and groups work output/week; Be printed on the member numbering on rectangular parallelepiped piece (3) surface; The length of each I shape piece (2) is identical with the length that gunter chart board (1) is gone up a cycle of expression, and width is 1/2 of the last working procedure length of gunter chart board (1).
2. a kind of packaged type establishment Gantt chart instrument according to claim 1, it is characterized in that: said I shape piece (2) divides blue, orange, three kinds of colors of the purple color mixture of powder, and 1. a blue I shape piece representes reinforcing bar teams and groups work 5 tons/week of output; 2. an orange I shape piece representes template teams and groups work output 5 square meters/week; 3. the purple color mixture I shape of a powder piece representes concrete teams and groups work 10 cubes/week of output.
3. a kind of packaged type establishment Gantt chart instrument according to claim 1, it is characterized in that: embedding in the bottom surface of each I shape piece (2) and rectangular parallelepiped piece (3) has permanent magnet.
4. a kind of packaged type establishment Gantt chart instrument according to claim 1 is characterized in that: 15 of said rectangular parallelepiped pieces (3) totally; Upper surface is printed on JC, D-1~D-4, B-12, B-23, B-34, B-13, B-14, B-24 member numbering respectively, remain four subsequent use.
5. a kind of packaged type establishment Gantt chart instrument according to claim 1, it is characterized in that: the I shape piece of every kind of color is 15~30 in the I shape piece (2) of said three kinds of different colors.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220156095 CN202601080U (en) | 2012-04-13 | 2012-04-13 | Movable Grant chart compiling tool |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220156095 CN202601080U (en) | 2012-04-13 | 2012-04-13 | Movable Grant chart compiling tool |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202601080U true CN202601080U (en) | 2012-12-12 |
Family
ID=47318608
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220156095 Expired - Fee Related CN202601080U (en) | 2012-04-13 | 2012-04-13 | Movable Grant chart compiling tool |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202601080U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102693675A (en) * | 2012-04-13 | 2012-09-26 | 许强 | Movable Gantt chart drawing tool |
CN105069822A (en) * | 2015-08-07 | 2015-11-18 | 金蝶软件(中国)有限公司 | Gantt chart processing method and apparatus |
-
2012
- 2012-04-13 CN CN 201220156095 patent/CN202601080U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102693675A (en) * | 2012-04-13 | 2012-09-26 | 许强 | Movable Gantt chart drawing tool |
CN105069822A (en) * | 2015-08-07 | 2015-11-18 | 金蝶软件(中国)有限公司 | Gantt chart processing method and apparatus |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Mader | Lean six sigma's evolution | |
Brenner et al. | Scaled Agile Framework: Presentation and real world example | |
CN202601080U (en) | Movable Grant chart compiling tool | |
AT10813U3 (en) | TEST ARRANGEMENT | |
CN101299153A (en) | Computer auxiliary assembly process control method facing to manual assembly | |
CN102693675A (en) | Movable Gantt chart drawing tool | |
Arsovski et al. | Quality in world class manufacturing | |
Górski et al. | Virtual reality training of hard and soft skills in production | |
Du | Exploration and practice of diversified talent training mode in vocational colleges based on the supply-side structural reform. J | |
Lima et al. | An experience of teaching industrial automation for industrial engineering undergraduate students | |
Wang et al. | Research Article Research on Engineering Education Mode Based on CDIO Concept: Take Food Machinery Major as an Example | |
Biedry | Linking Six Sigma analysis with human creativity | |
Baleshta | Increasing student practical experience with the hurdle of large class sizes | |
Nichols | A comparative study of four bond wrenches with recommendations on changes to ASTM C1072 | |
Shao et al. | Application of case teaching method in electrical control technology | |
Zhu et al. | Design and Implementation of Project Based Curriculum under" 1+ X" Certificate System-“Machining Technology” Course as an Example | |
Chen et al. | Application of Vr Technology in Comprehensive Experiment of Pharmaceutical Engineering | |
Jiang et al. | The new teaching model research on supply chain management course | |
Feng | Exploration and Practice on Industrial Robot Experimental Teaching Based on Virtuality and Reality Combination | |
RAMLAH | Penerapan Model Pembelajaran Kooperatif Tipe Student Team Achievement Divisions Untuk Meningkatkan Hasil Belajar Fikih Siswa Kelas Vii Mts Negeri Luwu Utara Kab Luwu Utara | |
Lopez et al. | Using problem-based learning to engage engineering students in circular economy | |
Kathawala et al. | Quality in a global context: a framework for analysis | |
CN208706108U (en) | A kind of lever teaching balance | |
Li et al. | Problems Encountered in Implementing Lean Construction and Solutions | |
Zhijie et al. | Construction and Practice of Virtual Simulation Experimental Teaching Project of Lathes and Gear Hobbing Machines Based on Transmission Analysis |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20121212 Termination date: 20140413 |