CN202598497U - Integrally precision-cast wearable air hood for boiler - Google Patents

Integrally precision-cast wearable air hood for boiler Download PDF

Info

Publication number
CN202598497U
CN202598497U CN 201220147593 CN201220147593U CN202598497U CN 202598497 U CN202598497 U CN 202598497U CN 201220147593 CN201220147593 CN 201220147593 CN 201220147593 U CN201220147593 U CN 201220147593U CN 202598497 U CN202598497 U CN 202598497U
Authority
CN
China
Prior art keywords
air
air hood
boiler
blast cap
hood
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220147593
Other languages
Chinese (zh)
Inventor
陈亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU JINGLONG ALLOY STEEL MACHINERY MANUFACTURING Co Ltd
Original Assignee
JIANGSU JINGLONG ALLOY STEEL MACHINERY MANUFACTURING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU JINGLONG ALLOY STEEL MACHINERY MANUFACTURING Co Ltd filed Critical JIANGSU JINGLONG ALLOY STEEL MACHINERY MANUFACTURING Co Ltd
Priority to CN 201220147593 priority Critical patent/CN202598497U/en
Application granted granted Critical
Publication of CN202598497U publication Critical patent/CN202598497U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Fluidized-Bed Combustion And Resonant Combustion (AREA)

Abstract

The utility model discloses an integrally precision-cast wearable air hood for a boiler. The air hood comprises an air inlet and air outlets. The upper end of the air hood is a regularly octagonal, and the air outlets are uniformly distributed around the upper end of the air hood. The top of the air hood is a circular ball body. The air inlet is formed in the center of the air hood. A thread is arranged at the lower end of the air hood. The slag leakage problem that fine particles enter the inner wall of the air hood along with primary air and seriously abrade a lining of a water supply cold air chamber under the disturbance of the primary air to the slag leakage of the conventional air hood is solved, the service life of the air hood is greatly prolonged, the matched using requirements of a device are met, abrasion to a refractory material and a water-cooled wall in the boiler is avoided, the running cycle of a circulating fluidized bed (CFB) boiler is effectively prolonged, the number of blowing-out times is reduced, running consumption and cost are lowered, positive effects of energy saving and emission reduction are achieved, and the stable fluidization combustion and safe, economic, efficient and stable running of the CFB boiler are ensured.

Description

The wear-resisting blast cap of the whole smart casting of boiler
Technical field:
the utility model relates to the wear-resisting blast cap of the whole smart casting of CFB boiler.
Background technology:
industry CFB Wind cap for boiler such as thermoelectricity, environmental protection at present have various ways, and its shape is that the comparatively of basis see more with the mushroom.Blast cap is one of vitals of CFB boiler, fluidisation whether evenly, can high temperature resistant, the wear-resistant direct efficiency of combustion that influences boiler.For example blast cap scaling loss in service, wearing and tearing are comparatively serious, will cause the often stifled slag of air outlet to cause fluidisation uneven, a large amount of ashes etc. that leak in the air compartment.Even wind cap does not gall more serious leakage slag phenomenon is not arranged yet, blast cap gathers and causes producing blast cap heavy wear leakage lime-ash because of the high velocity air that closes on blast cap purges.Problem like that causes the needs that the CFB boiler operatiopn cycle is short, the cost of overhaul is high, inaccessible system moves.
Summary of the invention:
The purpose of the utility model will provide the whole smart casting of a kind of boiler wear-resisting blast cap exactly, and it can overcome the existing existing above problem of blast cap.The purpose of the utility model is such reality
Existing, the wear-resisting blast cap of the whole smart casting of boiler comprises air outlet, air inlet, it is characterized in that:
Polygon-octagonal is arranged in blast cap upper end, and around it, is uniformly distributed with and is provided with air outlet, and described air outlet diameter is Φ 3mm-Φ 10mm; The circular arc spheroid is arranged on the top of blast cap, and the central authorities of blast cap are provided with air inlet, and the lower end of blast cap is provided with screw thread.The utility model has solved present blast cap and has leaked slag under the disturbance of a wind, and fine particle gets into the blast cap inwall with a wind and reaches the leakage slag problem that causes heavy wear to the water cooled wind chamber liner.Prolonged the service life of blast cap greatly, satisfied the matched with devices instructions for use, guaranteed that interior refractory material of stove and water-cooling wall are not frayed.Effectively prolong the CFB boiler operatiopn cycle, reduced the blowing out number of times, reduced operation and consumed and cost, had the positive role of energy-saving and emission-reduction.Guaranteed that CFB boiler fluidized bed combustion is steady, safety, economic, efficient, stable operation.
The utility model compared with prior art has the following advantages:
1, the air outlet aperture is less, helps cloth wind uniformity, circulation area ratio>=1.5, and operating flexibility is bigger;
2, the air compartment leakage slag that causes after the former blast cap local damage, the potential safety hazard of the impaired operation of boiler have been avoided;
3, the curved spheroid in top has been optimized and slag wearing and tearing outer surface streamline, makes it have the function that reduces wearing and tearing;
4, casting integrated with air inlet, simple and direct, the smoothness that crosses of inner air channel structure is convenient to make processing;
The screw thread that 5, blast cap lower end are provided with directly is connected with air distribution plate, only needs directly to use the spanner dismounting, has solved the loaded down with trivial details operation of blast cap dismounting in the past, greatly reduces the consumption and the replacing time of replacing process material.
Description of drawings:
Fig. 1 is the front view in the utility model structural representation;
Fig. 2 is the upward view in the utility model structural representation;
are the blast cap upper end 1., 2. air outlet, 3. air inlet, 4. screw thread.
The specific embodiment: the utility model is described further below in conjunction with accompanying drawing;
The wear-resisting blast cap of the whole smart casting of boiler comprises air outlet 2, air inlet 3, it is characterized in that:
Polygon-octagonal is arranged in blast cap upper end 1, and around it, is uniformly distributed with and is provided with air outlet 2, and described air outlet 2 diameters are Φ 3mm-Φ 10mm; The circular arc spheroid is arranged on the top of blast cap, and the central authorities of blast cap are provided with air inlet 3, and the lower end of blast cap is provided with screw thread 4.During practical implementation, utilize the high-abrasive material hot investment casting, integrated poured moulding blast cap.The blast cap lower end adopts screw thread to be connected with air distribution plate; The air inlet unthreaded portion adopts boss structure, prevents the screw thread that weares and teares, and dismounting is changed in influence; Air inlet directly is communicated with eight air outlets, and eight air outlets are at same level, same circumference uniform distribution, and described air outlet diameter is Φ 3mm-Φ 10mm, circulation area ratio >=1.5, and operating flexibility is bigger.After effectively having avoided a certain blast cap accidental damage, the disorderly phenomenon of peripheral cloth wind occurs; Circular arc sphere-like profile is adopted on the blast cap top, forms slick and sly streamline with the air outlet perpendicular is tangent, and what effectively reduce that high velocity air blows afloat flies upward the erosive wear of lime-ash to the blast cap body.

Claims (2)

1. the whole essence of boiler is cast wear-resisting blast cap; Comprise air outlet (2), air inlet (3); It is characterized in that: polygon-octagonal is arranged in blast cap upper end (1), and around it, is uniformly distributed with and is provided with air outlet (2), and the circular arc spheroid is arranged on the top of blast cap; The central authorities of blast cap are provided with air inlet (3), and the lower end of blast cap is provided with screw thread (4).
2. the wear-resisting blast cap of the whole smart casting of boiler according to claim 1, it is characterized in that: described air outlet (2) diameter is Φ 3mm-Φ 10mm.
CN 201220147593 2012-04-10 2012-04-10 Integrally precision-cast wearable air hood for boiler Expired - Fee Related CN202598497U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220147593 CN202598497U (en) 2012-04-10 2012-04-10 Integrally precision-cast wearable air hood for boiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220147593 CN202598497U (en) 2012-04-10 2012-04-10 Integrally precision-cast wearable air hood for boiler

Publications (1)

Publication Number Publication Date
CN202598497U true CN202598497U (en) 2012-12-12

Family

ID=47316030

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220147593 Expired - Fee Related CN202598497U (en) 2012-04-10 2012-04-10 Integrally precision-cast wearable air hood for boiler

Country Status (1)

Country Link
CN (1) CN202598497U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107013904A (en) * 2017-04-14 2017-08-04 中国石油化工股份有限公司 A kind of CFBB A types blast cap and its manufacture method
CN113464954A (en) * 2021-07-28 2021-10-01 上海麦雀斯环境工程技术有限公司 Water-cooling wind cap

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107013904A (en) * 2017-04-14 2017-08-04 中国石油化工股份有限公司 A kind of CFBB A types blast cap and its manufacture method
CN113464954A (en) * 2021-07-28 2021-10-01 上海麦雀斯环境工程技术有限公司 Water-cooling wind cap

Similar Documents

Publication Publication Date Title
CN202598497U (en) Integrally precision-cast wearable air hood for boiler
CN105240850A (en) Water-cooled external mixing type pure oxygen gas burner for rotary iron-melting furnace
CN207504362U (en) A kind of radiating dustproof electrical cabinet
CN203177163U (en) Outer hexagonal air cap of circulating fluidized bed boiler
CN209568123U (en) A kind of copper-steel integrated tuyere case
CN208776673U (en) A kind of high-temperature burner
CN202442328U (en) Bell-jar-shaped air cap for circulating fluidized bed boiler
CN206540118U (en) A kind of environment-friendly and energy-efficient CFBB bell-type windshield
CN202790654U (en) Notch ball body of four-way ball valve
CN102212632B (en) Air-cooled blast-furnace tuyere and air supply system thereof
CN100404953C (en) Floater type blast cap
CN106678786A (en) Bell jar type wind cap for environment-friendly energy-saving circulating fluidized bed boiler
CN208268628U (en) The wear-resistant elbow of anti-attrition
CN208728663U (en) A kind of abrasion-resistant metal medium Casting Equipment
CN111336505A (en) Variable-resistance energy-saving hood
CN205310078U (en) Adjustable air intake sand blasting machine nozzle
CN208260886U (en) A kind of guiding wimble device for medium-speed pulverizer
CN206986206U (en) Gas-based reduction shaft furnace
CN216274221U (en) Multi-medium wide-angle rotational flow atomization spray gun
CN203128605U (en) Blast furnace coal injection air inlet
CN217809515U (en) Emergency plugging device for blast furnace
CN204255097U (en) The feed nozzle of smelting furnace
CN203431847U (en) Abrasion prevention device of water-cooled wall abrasion area of circulation fluidized bed boiler
CN221619639U (en) Spray cooling system in cement mill
CN202709755U (en) Flash smelting high-temperature resistant spray-head

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121212

Termination date: 20140410