CN202596240U CN 201220231094 CN201220231094U CN202596240U CN 202596240 U CN202596240 U CN 202596240U CN 201220231094 CN201220231094 CN 201220231094 CN 201220231094 U CN201220231094 U CN 201220231094U CN 202596240 U CN202596240 U CN 202596240U
Authority
CN
China
Prior art keywords
flange
processing
stress
stress relieving
relieving groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220231094
Other languages
Chinese (zh)
Inventor
王程
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU JIANDE TOWER CO Ltd
Original Assignee
JIANGSU JIANDE TOWER CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU JIANDE TOWER CO Ltd filed Critical JIANGSU JIANDE TOWER CO Ltd
Priority to CN 201220231094 priority Critical patent/CN202596240U/en
Application granted granted Critical
Publication of CN202596240U publication Critical patent/CN202596240U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Flanged Joints, Insulating Joints, And Other Joints (AREA)

Abstract

The utility model discloses a flange for a communication tower, and the flange comprises a flange body, wherein bolt holes are uniformly arranged on the junction surface of the flange body, each bolt hole is guided out towards the outer edge of the flange to form an open stress relieving groove, the center line of the stress relieving groove passes through the center of the flange, the width of the stress relieving groove is 6mm, 2mm positive-negative deviation is permitted when processing, and the outer edge of the flange is round or polygonal; the stress relieving groove in the utility model can be use for efficiently releasing residual stress generated when processing and manufacturing, the deformation is reduced, and the processing precision of the flange is ensured; and therefore, the flange has good mechanical behavior, the bolt holes and stress relieving groove of the flange can be molded by cutting once, the processing and manufacturing efficiency is improved, the processing cost is reduced, and the flange has good economic benefit.

Description

Communication tower is used flange
Technical field
The utility model relates to a kind of communication tower accessory, is specifically related to a kind of flange that is used for communication tower.
Background technology
Present developing rapidly along with the home communications industry; The communications infrastructure is fast lifting also; The single-pipe tower of communicating by letter in recent years in the tower mast is used extensive day by day, but the machining stress control in the mill of steel work product is the difficult point of restriction industry development always in large-scale single-pipe tower design, process.
The basis flange is a topmost building block in the self-supporting head tower mast structure; Be used for fixing body of the tower and basic firmware, require to have good intensity and precision, the flange of industry employing at present is shaped as loop configuration; Process the connecting hole that needs above, the inner ring and the tower body of flange weld.The process of flange is generally flame cutting, and circle cuts hole again and cuts cylindrical at last in cutting earlier, and steel plate is through heating repeatedly between often, and very complicated variation takes place internal stress, and the workpiece of completion of processing has very big distortion usually, can't guarantee effective precision.
The utility model content
The utility model purpose: the purpose of the utility model is the deficiency to prior art, provides a kind of communication tower that can reduce stress deformation to use flange.
Technical scheme: the described a kind of communication tower of the utility model is used flange, comprises flange body, evenly is provided with several bolts hole on the joint face of said flange body, and securing member passes bolt hole and clamps said flange and basic firmware; Each bolt hole is drawn a uncovered stress-removal groove respectively to the flange outward flange, is used for discharging the residual stress that process produces.During the processing flange, available flame cutting is disposable with flange outward flange, stress-removal groove and bolt hole excision forming, reduces the repeated heating number of times, avoids distortion.
Further improve technique scheme, the center line of stress-removal groove is through the center of flange, and the width of stress-removal groove is 6mm, allows to add the positive and negative deviation that 2mm is arranged man-hour.
The outward flange of flange is circle or polygon, and inward flange and tower body directly weld, and also can add gusset according to the structural strength needs and strengthen fixing.
Beneficial effect: the utility model compared with prior art, its beneficial effect is: 1, the stress-removal groove can effectively discharge the residual stress that produces in the processing and manufacturing, reduces distortion, has guaranteed the machining accuracy of flange, makes flange have good stress performance; 2, the bolt hole of flange and stress-removal groove can excision formings, improved processing and manufacturing efficient, cut down finished cost, and have good economic benefit.
Description of drawings
Fig. 1 is the structural representation of the utility model;
Fig. 2 is the partial enlarged drawing of the said stress-removal groove of the utility model.
The specific embodiment
A kind of communication tower as shown in Figure 1 is used flange, comprises flange body, evenly has 12 bolts hole on the joint face of flange body, and securing member passes fastening said flange of aperture and basic firmware; Each bolt hole is drawn a uncovered stress-removal groove respectively to the flange outward flange, is used for discharging the residual stress that process produces.During the processing flange, the circle back is disposable with flange outward flange, stress-removal groove and bolt hole excision forming with the flame cutting in having cut, and reduces the repeated heating number of times, avoids distortion, guarantees precision.
As shown in Figure 2, the center line of stress-removal groove is through the center of flange, and the width of stress-removal groove is 6mm, allows to add the positive and negative deviation that 2mm is arranged man-hour.
The outward flange of flange is circular, and inward flange and tower body directly weld.

Claims (4)

1. a communication tower is used flange, it is characterized in that, comprises flange body, evenly is provided with bolt hole on the joint face of said flange body, and each bolt hole is drawn a uncovered stress-removal groove to the flange outward flange.
2. communication tower according to claim 1 is used flange, it is characterized in that, the center line of said stress-removal groove is through the center of flange.
3. communication tower according to claim 1 is used flange, it is characterized in that, the width of said stress-removal groove is 6mm ± 2mm.
4. communication tower according to claim 1 is used flange, it is characterized in that, the outward flange of said flange is circle or polygon.
CN 201220231094 2012-05-22 2012-05-22 Flange for communication tower Expired - Fee Related CN202596240U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220231094 CN202596240U (en) 2012-05-22 2012-05-22 Flange for communication tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220231094 CN202596240U (en) 2012-05-22 2012-05-22 Flange for communication tower

Publications (1)

Publication Number Publication Date
CN202596240U true CN202596240U (en) 2012-12-12

Family

ID=47313788

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220231094 Expired - Fee Related CN202596240U (en) 2012-05-22 2012-05-22 Flange for communication tower

Country Status (1)

Country Link
CN (1) CN202596240U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113134737A (en) * 2021-03-30 2021-07-20 宁夏西北骏马电机制造股份有限公司 Wind shield turning process of air-cooled explosion-proof motor

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113134737A (en) * 2021-03-30 2021-07-20 宁夏西北骏马电机制造股份有限公司 Wind shield turning process of air-cooled explosion-proof motor

Similar Documents

Publication Publication Date Title
CN202103831U (en) T-shaped iron die
CN204487084U (en) Pipe flange butt welding support
CN201076929Y (en) Drill jig for hydraulic turbine exterior admission taper tube flange hole
CN203831148U (en) Adjustable and efficient tool flange for machining pump cover of IS pump
CN202596240U (en) Flange for communication tower
CN201755769U (en) Clamp for cam processing
CN201950245U (en) Flange plate drilling clamping fixture
CN104690119A (en) Method for bending rows of angle steels
CN203566288U (en) Tooling structure for processing thin-wall type part
CN203076384U (en) Bending tool for metal plate
CN201960358U (en) Waterwheel-shaped clamp
CN201157869Y (en) Conical steel plate die
CN205764096U (en) A kind of energy-saving light quantifies metal saw
CN203470983U (en) Pump cover drilling jig
CN201367992Y (en) Annular gear in pivoting support flange used for wind power
CN210563270U (en) Special blade of standing floor construction
CN212056319U (en) Radiation rib type flat bulkhead
CN203665137U (en) Assembly jig of hub of wind driven generator
CN203679925U (en) Protection plate for air cylinder surface machining
CN202461275U (en) Roller cold header stamping die
CN201815721U (en) Clamping device for locking hole of web plate of rocker arm of straight-line machine
CN207746659U (en) The assembly tooling of pipe fitting and ring
CN206795342U (en) A kind of three face Four-axis milling fixtures
CN204089510U (en) A kind of iron core shaping frock
CN202555848U (en) High-strength blade

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121212

Termination date: 20180522

CF01 Termination of patent right due to non-payment of annual fee