CN202577341U - 大型沉管隧道管段基础 - Google Patents
大型沉管隧道管段基础 Download PDFInfo
- Publication number
- CN202577341U CN202577341U CN 201220142681 CN201220142681U CN202577341U CN 202577341 U CN202577341 U CN 202577341U CN 201220142681 CN201220142681 CN 201220142681 CN 201220142681 U CN201220142681 U CN 201220142681U CN 202577341 U CN202577341 U CN 202577341U
- Authority
- CN
- China
- Prior art keywords
- immersed tube
- pipeline section
- tube tunnel
- tunnel
- rubble
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Underground Or Underwater Handling Of Building Materials (AREA)
Abstract
本实用新型公开了一种大型沉管隧道管段基础,包括断面呈倒梯形的沉管隧道管段基槽,在所述沉管隧道管段基槽的底部自下而上依次设有片石底基层、碎石次基层和膨润土砂浆注浆层,其中,片石底基层的厚度为40cm,碎石次基层的厚度为20cm,膨润土砂浆注浆层的厚度为40cm。所述片石底基层采用80~150mm二片石,所述碎石次基层采用20~80mm级配碎石,所述沉管隧道管段基槽的底面距离水位线为20.43m~23.2m。本实用新型大型沉管隧道管段基础采用注浆基础工艺,不仅可以减少施工成本,还能满足沉管隧道的结构特点,沉降变形稳定,累计沉降量微小,可以保证沉管隧道基础施工质量实现最大利益化。
Description
技术领域
本实用新型涉及隧道设计中的一种基础结构,尤其涉及一种沉管隧道管段基础。
背景技术
沉管隧道基础大体上分为两种,一种是先铺法基础,一种是后铺法基础,先铺法基础包括刮铺基础、桩基础,后铺法基础包括喷砂基础、流砂基础、注浆基础、灌囊基础。在以往施工的沉管隧道中,采用有注浆基础,砂流基础和桩基础,这几种沉管隧道基础中,桩基础施工费用最高,流砂基础施工费用居中,注浆基础施工费用最低,但是注浆基础地基处理不好的话,容易产生不均匀沉降,影响后期运营阶段的正常使用。
实用新型内容
针对上述现有技术,本实用新型提供一种大型沉管隧道管段基础。本实用新型结合隧道地质情况,参考以往沉管隧道施工的资料,设计出一种适合高震区、水流速度小、回淤量小的沉管隧道的基础结构,不但降低了工程成本,而且沉降变形稳定,累计沉降量微小,可以保证沉管隧道基础施工质量。
为了解决上述技术问题,本实用新型大型沉管隧道管段基础予以实现的技术方案是:包括断面呈倒梯形的沉管隧道管段基槽,在所述沉管隧道管段基槽的底部自下而上依次设有片石底基层、碎石次基层和膨润土砂浆注浆层,其中,片石底基层的厚度为40cm,碎石次基层的厚度为20cm,膨润土砂浆注浆层的厚度为40cm。
本实用新型大型沉管隧道管段基础,所述片石底基层采用80~150mm二片石,所述碎石次基层采用20~80mm级配碎石,所述沉管隧道管段基槽的底面距离水位线为20.43m~23.2m。
与现有技术相比,本实用新型的有益效果是:
本实用新型采用注浆基础工艺,不仅可以减少施工成本,还能满足沉管隧道的结构特点,实现最大利益化。
附图说明
图1是本实用新型大型沉管隧道管段基础横断面示意图;
图2是图1中I部局部放大图。
图中:1-沉管隧道管段基槽,2-管段,3-沉管隧道遂址水位线,4-80~150mm二片石,5-20~80mm级配碎石,6-膨润土砂浆层。
具体实施方式
下面结合具体实施方式对本实用新型作进一步详细地描述。
如图1所示,本实用新型大型沉管隧道管段基础包括断面呈倒梯形的沉管隧道管段基槽1,在所述沉管隧道管段基槽1的底部自下而上依次设有片石底基层4、碎石次基层5和膨润土砂浆注浆层6,其中,所述沉管隧道管段基槽1的底面距离沉管隧道遂址水位线为20.43m~23.2m,所述片石底基层4采用80~150mm二片石,其厚度为40cm,所述碎石次基层5采用20~80mm级配碎石,其厚度为20cm,膨润土砂浆注浆层6的厚度为40cm。
实现本实用新型大型沉管隧道管段基础的基本过程是:
沉管隧道管段基槽1浚挖完成,用碎石整平船抛填作为基底的片石底基层4的片石,
具体操作工艺为:
(1)沉管隧道管段基槽1浚挖施工:主要由抓斗船负责前期的原状基槽表面清理工作,再由绞吸船疏浚到设计标高。海河内水位通常水位标高为+1.0m,沉管隧道管段基槽1底距离水位线为20.43m~23.2m,浚挖到设计标高后,经水下声纳扫测达到设计标高后,用气升式抽泥设备对该沉管隧道管段基槽面进行全面清淤处理;
(2)完成管段基础片石底基层片石的抛填施工:片石底基层4的厚度为40cm,为80~150mm二片石,抛填设备为碎石供料船舶配备挖掘机及碎石整平船配备碎石输送及刮平设备,抛填范围为管段宽度两侧各加2m,该片石底基层4能有效的排挤基底淤泥,可以增加基底承载力;
(3)管段基础碎石次基层碎石的抛填整平施工:用碎石整平船抛填碎石次基层5的碎石,并刮平,使碎石嵌入底基层中;碎石次基层的厚度为20cm,碎石为20~80mm级配碎石,级配碎石整平精度要求为±5cm,
(4)管段沉放前再次清淤,管段2沉放安装到位后,进行管段基础注浆施工,注浆采用注浆泵及配套泵管通过管段底板预埋的注浆管向管段基础内注浆,从而形成本实用新型管段基础。
本实用新型研究实例:天津海河隧道沉管工程,从工程监测结果表明,管段累计沉降量5mm,达到设计与相关规范要求。
尽管上面结合图对本实用新型进行了描述,但是本实用新型并不局限于上述的具体实施方式,上述的具体实施方式仅仅是示意性的,而不是限制性的,本领域的普通技术人员在本实用新型的启示下,在不脱离本实用新型宗旨的情况下,还可以作出很多变形,这些均属于本实用新型的保护之内。
Claims (4)
1.一种大型沉管隧道管段基础,包括断面呈倒梯形的沉管隧道管段基槽(1),其特征在于,在所述沉管隧道管段基槽(1)的底部自下而上依次设有片石底基层(4)、碎石次基层(5)和膨润土砂浆注浆层(6),其中,片石底基层(4)的厚度为40cm,碎石次基层(5)的厚度为20cm,膨润土砂浆注浆层(6)的厚度为40cm。
2.根据权利要求1所述大型沉管隧道管段基础,其特征在于,所述片石底基层(4)采用80~150mm二片石。
3.根据权利要求1所述大型沉管隧道管段基础,其特征在于,所述碎石次基层(5)采用20~80mm级配碎石。
4.根据权利要求1所述大型沉管隧道管段基础,其特征在于,所述沉管隧道管段基槽(1)的底面距离沉管隧道遂址水位线为20.43m~23.2m。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220142681 CN202577341U (zh) | 2012-04-07 | 2012-04-07 | 大型沉管隧道管段基础 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220142681 CN202577341U (zh) | 2012-04-07 | 2012-04-07 | 大型沉管隧道管段基础 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202577341U true CN202577341U (zh) | 2012-12-05 |
Family
ID=47246770
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220142681 Expired - Fee Related CN202577341U (zh) | 2012-04-07 | 2012-04-07 | 大型沉管隧道管段基础 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202577341U (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103759702A (zh) * | 2013-12-30 | 2014-04-30 | 浙江大学城市学院 | 一种沉管隧道基础层沉降模型试验系统及其操作方法 |
CN105696625A (zh) * | 2016-01-28 | 2016-06-22 | 中交航局第二工程有限公司 | 沉管隧道碎石基床清淤系统及方法 |
-
2012
- 2012-04-07 CN CN 201220142681 patent/CN202577341U/zh not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103759702A (zh) * | 2013-12-30 | 2014-04-30 | 浙江大学城市学院 | 一种沉管隧道基础层沉降模型试验系统及其操作方法 |
CN103759702B (zh) * | 2013-12-30 | 2016-05-04 | 浙江大学城市学院 | 一种沉管隧道基础层沉降模型试验系统及其操作方法 |
CN105696625A (zh) * | 2016-01-28 | 2016-06-22 | 中交航局第二工程有限公司 | 沉管隧道碎石基床清淤系统及方法 |
CN105696625B (zh) * | 2016-01-28 | 2018-05-22 | 中交第一航务工程局有限公司 | 沉管隧道碎石基床清淤系统的清淤方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102011391B (zh) | 一种软弱地基的加固处理方法 | |
CN104196034A (zh) | 一种利用钢板桩作为支护围堰的基坑施工方法 | |
CN104790410B (zh) | 一种适用于浅水淤泥河道的基坑开挖支护方法 | |
CN108755698B (zh) | 一种陡坡松散堆积体大倾斜岩面基础施工方法 | |
CN104631438A (zh) | 长螺旋钻孔压灌混凝土抗拔桩施工方法 | |
CN103696416A (zh) | 一种地基处理新方法 | |
CN111691425B (zh) | 一种水利工程基坑管井结合轻型井点降排水方法 | |
CN205116247U (zh) | 水利冲沉沉井施工设备 | |
CN202577341U (zh) | 大型沉管隧道管段基础 | |
CN106884427A (zh) | 水下沉管隧道以及沉管隧道过渡段软土地基加固方法 | |
CN112962525B (zh) | 一种疏浚土充灌筑堤结构及其充灌袋筑堤方法 | |
CN112663558B (zh) | 一种内河港池中风化岩开挖施工工艺 | |
CN111335263B (zh) | 一种建造人工岛的方法 | |
CN202626934U (zh) | 建设于淤泥质地基上的重力式码头 | |
CN201778330U (zh) | 黏土止水帷幕墙 | |
CN105155421B (zh) | 一种单桩独柱墩河道浅水中全埋置圆形承台施工方法 | |
CN106869153A (zh) | 一种井点降水快速处理软地基的方法 | |
CN107587497B (zh) | 一种提高吹填平整度的方法 | |
CN104846837A (zh) | 一种明排水基坑中超深井坑的施工方法 | |
CN102322068B (zh) | 减压降水辅助成槽施工工艺 | |
CN204530740U (zh) | 一种具有弹性变形的大型沉管隧道管段隔震基础 | |
CN100582382C (zh) | 取湖底粘土筑快速固结的临水平台工艺方法 | |
CN111549807B (zh) | 水利工程基坑管井结合轻型井点降排水方法 | |
CN204982857U (zh) | 低位负压立体多通道排水组合夯实装置 | |
CN103866787A (zh) | 一种敞挖逆筑法混凝土防渗墙建造施工工艺 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20121205 Termination date: 20130407 |