CN202575634U - High-capacity high-speed single-column construction hoist - Google Patents

High-capacity high-speed single-column construction hoist Download PDF

Info

Publication number
CN202575634U
CN202575634U CN 201220189410 CN201220189410U CN202575634U CN 202575634 U CN202575634 U CN 202575634U CN 201220189410 CN201220189410 CN 201220189410 CN 201220189410 U CN201220189410 U CN 201220189410U CN 202575634 U CN202575634 U CN 202575634U
Authority
CN
China
Prior art keywords
column
side wheel
elevator
wheel assembly
capacity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220189410
Other languages
Chinese (zh)
Inventor
刘跃进
王化龙
李向辉
贺伟萍
赵洪亮
程惠褀
江楚杰
黄玉祯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Jinglong Engineering Machinery Co Ltd
Original Assignee
Guangzhou Jinglong Engineering Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Jinglong Engineering Machinery Co Ltd filed Critical Guangzhou Jinglong Engineering Machinery Co Ltd
Priority to CN 201220189410 priority Critical patent/CN202575634U/en
Application granted granted Critical
Publication of CN202575634U publication Critical patent/CN202575634U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Types And Forms Of Lifts (AREA)

Abstract

The utility model discloses a high-capacity high-speed single-column construction hoist which comprises a hoist guide rail frame, a hanging cage, a dual-rolling-wheel assembly and a side rolling wheel assembly; the dual-rolling-wheel assembly is installed on a vertical column of the hoist; the hanging cage can move on the hoist guide rail frame under the guidance of the dual-rolling-wheel assembly and the side rolling wheel assembly; the side rolling wheel assembly comprises a central shaft assembly, more than two side rolling wheel mounting shafts installed on the central shaft assembly and side rolling wheels installed on the side rolling wheel mounting shafts; and two ends of the central shaft assembly are instaled on the vertical column of the hoist so as to form a simple support beam structure. The construction hoist is high in capacity, has rapid running speed, and is large in load bearing quantity.

Description

High-capacity and high-speed single-column building hoist
Technical field
The utility model relates to building hoist.
Background technology
In construction trade, in order to save labour power, to raise the efficiency, now, the range of use of building hoist more and more widely.Along with difference to construction requirement; The building hoist of existing capacity cage can not satisfy skyscraper and factory building in the demand of transporting building materials or goods; For solving the problems of the technologies described above, there is the people to solve through the capacity that increases cage, can find but that in actual mechanical process the speed of going up and down can't reach actual demand; The intensity of crane can not satisfy the demands, thereby causes this kind building hoist to be used widely.Elevator client both domestic and external is increasingly high for the operating needs of elevator, and a lot of skyscrapers and factory building need more high-capacity elevator when transporting building materials or goods, and need running velocity fast, and load-carrying is high, and cost is low.
Summary of the invention
The purpose of the utility model provides a kind of high-capacity and high-speed single-column building hoist, and technical matters to be solved is that the capacity of building hoist is little, running velocity is slow, load-carrying is low.
The technical scheme that solves the problems of the technologies described above is: high-capacity and high-speed single-column building hoist comprises elevator guide rails frame, cage, elevator column, two roll wheel assembly and side wheel assembly; The elevator column is installed on the cage; Two roll wheel assemblies are installed on the elevator column; Cage can move on the elevator guide rails frame under the guiding of two roll wheel assemblies and side wheel assembly through the elevator column; Survey roll wheel assembly and comprise central axis component, be installed in the side wheel installation shaft more than two on the central axis component and be installed in the side wheel on the side wheel installation shaft that the two ends of described central axis component are installed on the elevator column and form simple beam structure.
Said structure; Because two roll wheel assemblies and side wheel assembly be installed on the elevator column, when cage when moving, two roll wheel assemblies have directional tagging to the rear side of cage; Side wheel has directional tagging to the left and right sides of cage; And sidewinder and comprised plural side wheel on the assembly, guiding point is many, and guiding is more steadily with reliable; Have, what the side wheel installation shaft adopted is two point-supported simple beam structures, thereby has strengthened the intensity of side wheel assembly again, therefore, when increasing the cage capacity, can guarantee the speed of hanging wheel motion.
As specializing, described central axis component comprises eccentric shaft, axle sleeve, stop collar and backplate, and eccentric shaft is an equilateral polygon, and the axis deviation of eccentric shaft is installed in the axle sleeve axle center, and stop collar is enclosed within on the axle sleeve, and the two ends of stop collar are fixed with backplate; The two ends of eccentric shaft are fixed on the elevator column.
The axis deviation of eccentric shaft is installed in the axle sleeve axle center, and the relative position between ability automatically regulating cage and the side wheel stuck phenomenon occurs because of deflection when preventing cage startup or motion.
As improvement, the side wheel installation shaft is installed on the backplate, and bearing is installed in side wheel, and the both sides that in side wheel, are positioned at bearing are equipped with back-up ring, and the outside that on side wheel, is positioned at back-up ring is equipped with cover of dust.
Described cover of dust can prevent that dust from entering into bearing, thereby has improved the service life of bearing, has also improved the alerting ability that side wheel rotates freely.
As specializing, described pair of roll wheel assembly comprises solid axle, roller adapter plate, roller and stay bearing plate; One end of solid axle is installed on the elevator column, and the other end is installed in stay bearing plate; The roller adapter plate is installed on the solid axle, and between stay bearing plate and elevator column; Roller is installed on the roller adapter plate; Stay bearing plate is fixed on the elevator column.
Above-mentioned pair of roll wheel assembly, making solid axle through stay bearing plate and elevator column is two point-supported simple beam structures, thereby has improved support strength, can guarantee that further the load carrying ability of cage is big, kinematic velocity is fast.
Description of drawings
Fig. 1 is the constructional drawing of building hoist.
Fig. 2 is an elevator ColumnBlock diagram.
Fig. 3 is an elevator ColumnExploded drawings.
Fig. 4 is the cutaway view of two roll wheel assemblies.
Fig. 5 is the block diagram of side wheel assembly.
Fig. 6 is the exploded drawings of side wheel assembly.
Fig. 7 is the cutaway view of side wheel assembly.
The specific embodiment
Below in conjunction with the accompanying drawing and the specific embodiment the utility model is further elaborated.
As shown in Figure 1, high-capacity and high-speed single-column building hoist comprises elevator guide rails frame 1, cage 2 and transmission device.Elevator guide rails frame 1 is installed on the ground; Cage 2 can move on elevator guide rails frame 1 through the elevator column under the effect of transmission device, and cage is of a size of length=5m * 2m * 2.7m, becomes big with respect to the prior art capacity, and load carrying ability improves, and can reach 2700kg; Described transmission device comprises motor 31, change-speed box 32, gear and tooth bar, and motor 31 is fixed on cage with change-speed box 32, and motor 31 flows to change-speed box 32 with power, and gear is connected the mouth of change-speed box 32, and gear and tooth bar are meshed.
As shown in Figures 2 and 3, the elevator column comprises column 11 and crossbeam 12, and crossbeam 12 is connected and fixed column.The cross-sectional plane of described column 11 is the U type.
As shown in Figures 2 and 3, two roll wheel assemblies 4 and side wheel assembly 5 are installed on the elevator column.
Like Fig. 3 and shown in Figure 4, two roll wheel assemblies 4 comprise solid axle 41, roller adapter plate 42, roller 43 and stay bearing plate 44; One end of solid axle 41 is installed on the column 11, and the other end is installed in stay bearing plate 44; Roller adapter plate 42 is installed on the solid axle 41, and between stay bearing plate 44 and elevator column; Roller 43 is installed on the roller adapter plate 42; Stay bearing plate 44 is fixed on the column 41.
To shown in Figure 7, said survey roll wheel assembly 5 comprises central axis component 51, side wheel installation shaft 52 and side wheel 53 more than two like Fig. 5; Described central axis component 51 comprises eccentric shaft 511, axle sleeve 512, stop collar 513 and backplate 514; Eccentric shaft is an equilateral polygon; Be regular hexagon in this embodiment, the axis deviation of eccentric shaft 511 is installed in axle sleeve 512 axle center, and an end of eccentric shaft 511 is through wherein a backplate, axle sleeve 512 and another backplate are installed; Stop collar 513 is enclosed within on the axle sleeve 512, and the two ends of stop collar 513 are fixed on the backplate 514; The two ends of eccentric shaft 511 are fixed on the column 11 and form simple beam structure, to improve the intensity of side wheel assembly; Side wheel installation shaft 52 is installed on the backplate 514; Bearing 54 is installed on side wheel installation shaft 52; Installation side roller 53 on the bearing 54, the both sides that in side wheel 53, are positioned at bearing 54 are equipped with back-up ring 55, and the outside that on side wheel 53, is positioned at back-up ring is equipped with cover of dust 55; Be used to prevent dust, to improve the service life of bearing.As shown in Figure 2, on the sidewall of column, have through hole 6, the side wheel assembly is installed in the cavity of U type, and the part of side wheel is exposed through hole 6 and is contacted with the cage sidewall, on column, is fixed with baffle plate 7, prevents to turn over before the cage.
In this embodiment; Because two roll wheel assemblies 4 and side wheel assembly 5 have been installed on the elevator column, when cage during in motion, the rear side of 4 pairs of cages of two roll wheel assemblies has directional tagging; The left and right sides of 5 pairs of cages of side wheel assembly has directional tagging; And sidewinder and comprised plural side wheel on the assembly 5, guiding point is many, and guiding is more steadily with reliable; Have, what the side wheel installation shaft adopted is two point-supported simple beam structures, thereby has strengthened the intensity of side wheel assembly again, therefore, when increasing the cage capacity, can guarantee the speed of hanging wheel motion, and the command speed of elevator has reached 80m/min.

Claims (4)

1. high-capacity and high-speed single-column building hoist comprises elevator guide rails frame, cage, elevator column, two roll wheel assembly and side wheel assembly; The elevator column is installed on the cage; Two roll wheel assemblies are installed on the elevator column; Cage can move on the elevator guide rails frame under the guiding of two roll wheel assemblies and side wheel assembly through the elevator column; It is characterized in that: survey roll wheel assembly and comprise central axis component, be installed in the side wheel installation shaft more than two on the central axis component and be installed in the side wheel on the side wheel installation shaft that the two ends of described central axis component are installed on the elevator column and form simple beam structure.
2. high-capacity and high-speed single-column building hoist according to claim 1; It is characterized in that: described central axis component comprises eccentric shaft, axle sleeve, stop collar and backplate; Eccentric shaft is an equilateral polygon; The axis deviation of eccentric shaft is installed in the axle sleeve axle center, and stop collar is enclosed within on the axle sleeve, and the two ends of stop collar are fixed with backplate; The two ends of eccentric shaft are fixed on the elevator column.
3. high-capacity and high-speed single-column building hoist according to claim 1 and 2; It is characterized in that: the side wheel installation shaft is installed on the backplate; Bearing is installed in side wheel; The both sides that in side wheel, are positioned at bearing are equipped with back-up ring, and the outside that on side wheel, is positioned at back-up ring is equipped with cover of dust.
4. high-capacity and high-speed single-column building hoist according to claim 1 is characterized in that: described pair of roll wheel assembly comprises solid axle, roller adapter plate, roller and stay bearing plate; One end of solid axle is installed on the elevator column, and the other end is installed in stay bearing plate; The roller adapter plate is installed on the solid axle, and between stay bearing plate and elevator column; Roller is installed on the roller adapter plate; Stay bearing plate is fixed on the elevator column.
CN 201220189410 2012-04-28 2012-04-28 High-capacity high-speed single-column construction hoist Expired - Fee Related CN202575634U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220189410 CN202575634U (en) 2012-04-28 2012-04-28 High-capacity high-speed single-column construction hoist

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220189410 CN202575634U (en) 2012-04-28 2012-04-28 High-capacity high-speed single-column construction hoist

Publications (1)

Publication Number Publication Date
CN202575634U true CN202575634U (en) 2012-12-05

Family

ID=47245071

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220189410 Expired - Fee Related CN202575634U (en) 2012-04-28 2012-04-28 High-capacity high-speed single-column construction hoist

Country Status (1)

Country Link
CN (1) CN202575634U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103466411A (en) * 2013-09-11 2013-12-25 中联重科股份有限公司 Double-roller device of elevator and elevator with same
CN104590978A (en) * 2014-12-02 2015-05-06 西安京龙工程机械有限公司 Lifting cage structure of construction hoist
CN105417318A (en) * 2015-11-26 2016-03-23 张家港市荣达建筑机械制造有限公司 Roller anti-disengaging device of construction lifting machine
CN114030969A (en) * 2021-10-11 2022-02-11 浙奥电梯有限公司 Construction elevator in shaft

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103466411A (en) * 2013-09-11 2013-12-25 中联重科股份有限公司 Double-roller device of elevator and elevator with same
CN103466411B (en) * 2013-09-11 2016-03-30 中联重科股份有限公司 Double-roller device of elevator and elevator with same
CN104590978A (en) * 2014-12-02 2015-05-06 西安京龙工程机械有限公司 Lifting cage structure of construction hoist
CN105417318A (en) * 2015-11-26 2016-03-23 张家港市荣达建筑机械制造有限公司 Roller anti-disengaging device of construction lifting machine
CN114030969A (en) * 2021-10-11 2022-02-11 浙奥电梯有限公司 Construction elevator in shaft
CN114030969B (en) * 2021-10-11 2023-02-17 浙奥电梯有限公司 Construction elevator in shaft

Similar Documents

Publication Publication Date Title
CN202575634U (en) High-capacity high-speed single-column construction hoist
CN201932836U (en) Double-beam upstroke-type suspension bridge crane
CN206679682U (en) A kind of automatic stereowarehouse loading platform lifting guide wheel group mechanism
CN113651113B (en) Suspended permanent magnet suspension pipeline logistics system
CN102211737A (en) Guide wheel type electric block running trolley
CN202704905U (en) Bucket elevator and concrete mixing plant comprising same
CN106865095A (en) A kind of automatic stereowarehouse loading platform lifting is oriented to set mechanism
CN203392388U (en) Trolley track roller device and calcium carbide discharging device
CN105016233A (en) Electric hoist of crane
CN213795145U (en) Auxiliary device for mounting and dismounting speed reducer for roller press
CN204714422U (en) Rope guide and tower crane
CN210566117U (en) Novel guide wheel
CN203820322U (en) Single girder portal crane
CN207418096U (en) The heavy-duty Cargo Lift suspension of traction ratio 6 to 1
CN201961990U (en) Two beam suspension crane
CN201850073U (en) Lifting support buffer device for sucker crane
CN104743460A (en) Rope alignment device and tower crane
CN204847990U (en) Bridge -type lifter
CN205061310U (en) Guider of shaft balance weight
CN205555903U (en) Bridge crane
CN205133037U (en) Automated guided transporting vehicle companion lifting frame with roll guider
CN105752841B (en) Travelling wheel guiding device of monorail crane trolley
CN205187611U (en) Protection device is kept apart to tail rope
CN210084689U (en) Overhead hoist in hauler well
CN103708347A (en) Double-beam walking trolley

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121205

Termination date: 20170428